Managed Pressure Drilling (MPD)

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 มี.ค. 2014
  • "A common Managed Pressure Drilling technique is pressurized mud-cap drilling (PMCD).
    PMCD techniques help minimize mud losses and associated NPT when drilling in highly depleted zones or formations with large voids, such as caverns"

ความคิดเห็น • 20

  • @eshaan40
    @eshaan40 3 ปีที่แล้ว

    Very useful information

  • @quentinmbunkah2693
    @quentinmbunkah2693 2 ปีที่แล้ว +1

    Is this technique good for drilling horizontals in depleted reservoirs? any concerns with drilling a lateral and potentially damaging formation?

  • @mohammedal-rahbi2376
    @mohammedal-rahbi2376 6 ปีที่แล้ว +2

    Do cuttings go to the first lost circulation zone or up to the surface?

    • @sohaibrashid9134
      @sohaibrashid9134 4 ปีที่แล้ว +2

      To the lost circulation zone first.

  • @armindokipaka5386
    @armindokipaka5386 3 ปีที่แล้ว

    magnific...

  • @SultanAlawad
    @SultanAlawad ปีที่แล้ว

    Is there a risk of Underground Blowout?

  • @waleedsaati7131
    @waleedsaati7131 4 ปีที่แล้ว

    After reaching the target point, how can we pull the pipes out of the hole and run casing and production tubing in the hole and then produce????

    • @aeosborn86
      @aeosborn86 4 ปีที่แล้ว +4

      The mud weight is increased to slightly overbalance the well so back pressure from MPD equipment is no longer required and the ESD of the annulus is sufficient to hold the formation pressure. Of course flow check on the trip tank. The RCD bearing is removed, then the driller can pull pipe and keep track of fluid displacements from trip tank to the well.

    • @dmitrykrivolapov3935
      @dmitrykrivolapov3935 2 ปีที่แล้ว

      There are several options depending on the situation. If it's offshore operation, BHA to be pulled out of the hole under pressure in PMCD mode until above BOP. Then blind rams to be closed. To run a completion a composite bridge plug to be installed to prevent influx while Liner make up. On land operations the only one option for us was to start filling the well with KM at flowrates, than at least 1.5 higher gas migration rate. Thus we were loosing mud but holding gas near bottom.

    • @amanzholikhsanov146
      @amanzholikhsanov146 ปีที่แล้ว

      Impressive

  • @andrewvijai5778
    @andrewvijai5778 6 ปีที่แล้ว

    if anybody got a link about MPD do share it, I need it badly.

    • @weatherford
      @weatherford  6 ปีที่แล้ว

      More information about Weatherford MPD offerings can be found here: www.weatherford.com/en/products-and-services/drilling/closed-loop-drilling/managed-pressure-drilling/

  • @CikRaoSharmizabtAbdRahman
    @CikRaoSharmizabtAbdRahman 8 ปีที่แล้ว

    :-)

  • @benmhidioussama2729
    @benmhidioussama2729 7 ปีที่แล้ว

    hi ......i'm a pteroluem drilling student .........and i'm doing some research about this MPD ...................so i'm asking for help ....plzz

    • @goodnota
      @goodnota 7 ปีที่แล้ว

      you what?!

    • @benmhidioussama2729
      @benmhidioussama2729 7 ปีที่แล้ว

      petroleum engineering student
      i wonna some information about MPD

    • @benmhidioussama2729
      @benmhidioussama2729 7 ปีที่แล้ว +1

      do u have some inforamtion about managed pressure drilling

    • @weatherford
      @weatherford  7 ปีที่แล้ว +2

      More information about managed pressure drilling can be found here: www.weatherford.com/en/products-services/drilling-formation-evaluation/secure-drilling-services

    • @benmhidioussama2729
      @benmhidioussama2729 7 ปีที่แล้ว

      wondering if u have more information i've already tried to contact them