DCVG | Pipeline Survey Techniques

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ต.ค. 2024

ความคิดเห็น •

  • @amineboutlikhetingenieurel8220
    @amineboutlikhetingenieurel8220 9 หลายเดือนก่อน +1

    Thank you. Frome Algeria

  • @boutlikhetamine4991
    @boutlikhetamine4991 8 หลายเดือนก่อน +1

    Thank you so much . Frome Algeria too,

  • @AmeltonGsairus
    @AmeltonGsairus ปีที่แล้ว

    Unbelievable informative video, thank you so much for your valuable contribution!!

  • @mouradaissat1235
    @mouradaissat1235 ปีที่แล้ว

    very goog explanation, Regards

  • @paolapostigo1193
    @paolapostigo1193 3 ปีที่แล้ว +1

    Thanks for this video.

  • @abdelkrimbenq2217
    @abdelkrimbenq2217 2 ปีที่แล้ว

    Vert interesting subject,Thank you

  • @abdelkrimbenq2217
    @abdelkrimbenq2217 ปีที่แล้ว

    How much current magnitude can be applied for DCVG survey more then normal functioning current especially in dry environment like desert.and if it can creat an overprotetion is acceptable or not.thank you.

  • @williamdieffenbach3264
    @williamdieffenbach3264 ปีที่แล้ว

    Thankfully the DCVG equipment now is electronic and the mV difference is easy to record.

  • @darrenmaley5436
    @darrenmaley5436 2 ปีที่แล้ว

    Great talk. Is it not possible to size defects against a coupon of known size?

    • @isifundi
      @isifundi  2 ปีที่แล้ว

      hank you for your question Darren.
      The relative sizing of defects is dependent on a number of factors and is unique to each pipeline.
      If the pipeline in question had suitably sized coupons installed, and these are bedded in the same backfill as the pipe, it may be possible to use these to correlate with the %IR readings.
      However, in the majority of instances, calibration digs are undertaken of a selection of different %IR - to verify the defect size vs %IR and determine what %IR should be repaired.
      We hope that answers your question adequately.