Bangkok BRT EV Buses
ฝัง
- เผยแพร่เมื่อ 25 ธ.ค. 2024
- Bangkok BRT operate since May 2010. Differently operate as Bus in a disclosed lane. The service is identical towards other vehicle of transit systems. In fact, it's a buses that is registered as closed system. As I'm showing you that this is an electrical powered bus, start at Sathon (connected with BTS Green Line, Chong Nonsi station). Towards BRT depot, Ratchapruek stop (connected with BTS Talat Phlu station). Taken date was on free trials (fare collected prior November 2024 upon that year, in which 15 THB is a flat fare).