sure didn't have to bury it very deep. Here the inlet has to be 8 feet underground so the tank has 6 ft or longer manhole extensions, and you have to backfill with pea gravel.
Is using the 1,000-gallon fiberglass septic tank and Infiltrator with leach field chambers the way you guys usually go when water table level, hardpan or ledge outcroppings are not issues?
Thought your suppose to backfill according to tank manufacturers instructions?? Pretty sure the stuff that came from the hole isn’t suppose to be used......crazy
Whoever was operating the Kobelco excavator is one smooth operator...
sure didn't have to bury it very deep. Here the inlet has to be 8 feet underground so the tank has 6 ft or longer manhole extensions, and you have to backfill with pea gravel.
is a perc test required when replacing an existing drain field / Leach field
Is using the 1,000-gallon fiberglass septic tank and Infiltrator with leach field chambers the way you guys usually go when water table level, hardpan or ledge outcroppings are not issues?
Septic Tank Pumping & Grease Trap Cleaning Pros
What size machine do you think is ideal for this kind of work? I can decide between a smaller cat 304 or something like case 60ix.
Thought your suppose to backfill according to tank manufacturers instructions?? Pretty sure the stuff that came from the hole isn’t suppose to be used......crazy