Time Lapse Video of a Turnkey installation of 2 x 3,200m3 Techcross BWTS Systems in Malaysia
Time Lapse Video of Goltens' turnkey retrofit of an 83,000 Ton LNG in MMHE shipyard in Johor, Malaysia. The installations of the the two systems were completed in only 18 days. To view the details of the installation on this vessel and one of her sister vessels please visit www.goltens.com/resources/two-more-turnkey-techcross-bwts-retrofits-by-goltens/.
มุมมอง: 1 832

วีดีโอ

Time Lapse Video of Optimarin Ballast Water Treatment System Installation
มุมมอง 1.5K3 ปีที่แล้ว
Watch a time lapse video of Goltens' installation of an Optimarin 334M3/hr Ballast Water Treatment System in 2019. Goltens completed the Turnkey project completing 3D scanning, concept design, detailed engineering, prefabrication of material and system installation in Stavanger, Norway.
Alignment and installation of two MaK8M32C engines on passenger vessel
มุมมอง 9K4 ปีที่แล้ว
See how Goltens completed final installation, laser alignment and chocking on 2 new MAK 8M32C diesel engines for a Greek ferry operator. Goltens’ expertise for proper installation of the engines on the foundations as well as precision alignment of the engines to the gearboxes and chocking of the engines in place were critical to this successful project.
Goltens Exhaust Scrubber and BWTS Turnkey Retrofit
มุมมอง 1.8K5 ปีที่แล้ว
See how Goltens Green Technologies leveraged its well tested retrofit process to help an LPG tanker owner meet its Sulphur Emissions and Ballast Water compliance requirements. Using 3D laser scanning and modeling to support the detailed design of the two systems, Goltens completed a turn-key retrofit of a Kwang Sung Open Loop EGCS system and two Alfa Laval PureBallast 3.1-750 ballast water trea...
Goltens Green Technologies
มุมมอง 1.3K5 ปีที่แล้ว
Watch a quick video that shows an overview of Goltens Green Technologies' retrofit process. See what makes us the leader in compliance retrofit services.
Turnkey NKO3 Ballast Water Treatment Retrofit for Product Tanker
มุมมอง 6K8 ปีที่แล้ว
On the Konstantin Jacob, a product tanker owned by Ernst Jacob, Goltens did a successful turn-key installation on a large ozone based ballast treatment system from NKO3. The vessel was scanned in Rotterdam and detailed engineering plus project management was carried out in the Goltens Green station in the Netherlands. After this, piping was produced in the Goltens Vietnam station, who also prov...
Hyde Guardian HG250GC Ballast Water Treatment System Retrofit
มุมมอง 3.2K9 ปีที่แล้ว
3D model of a Hyde Guardian HG250GC Ballast Water Treatment system over 3D scan output aboard the Seaboard Patriot. Goltens performed 3D scanning, system modeling, detailed engineering, prefabrication of piping and materials and project management oversight and commissioning of the installation in the shipyard in The Netherlands. Learn more about Goltens BWT retrofitting at 3D Laser Scanning at...
On-Site Machining of Cruise Ship Rudderstock in Bahamas
มุมมอง 24K9 ปีที่แล้ว
A cruise ship undergoing drydocking in Bahamas discovered one of its rudderstocks had excessive ovality and scoring. Goltens deployed its single point cutting tools to rectify the 870mm diameter x 1,115mm long journal. Machining was completed in 5 days on-site in Bahamas. To view the full case study please visit www.goltens.com/in-situ-machining/on-site-machining-of-870mm-rudderstock-in-bahamas...
Stinger Hinge Line Boring and Flange Facing - Singapore
มุมมอง 14K9 ปีที่แล้ว
Goltens carried out an In-Situ machining operation on a pair of Stinger Hinges on a newbuild cable-laying vessel being built in a shipyard in Singapore. The job involved the removal of a substantial amount of material from the two hinges’ rough-cut bores as well as from the faces of the hinges. Given the hinge pin bore diameter of 1350mm x 600mm long, and the substantial amount of material to b...
Large scale Line Boring and Tapered Boring - Vietnam
มุมมอง 30K9 ปีที่แล้ว
Goltens undertook a challenging line boring and tapered boring project on newbuild pipelaying vessel Lewek Constellation in TriYard Shipyard in Vung Tau, Vietnam. Goltens removed 36mm of material from the diameter of 8 bearing housings greater than 2M in diameter. The project was completed over 75 days using purpose built tapered boring equipment manufactured by Goltens. To read the full case s...
Westinghouse Gas Turbine Rotor Shaft Machining
มุมมอง 20K9 ปีที่แล้ว
Saudi Electric Company experienced a rotor shaft casualty on one of its Westinghouse W501D5 Gas Turbine Generators at its Asir powerplant in Abha, Saudi Arabia. Goltens was engaged to perform in-place machining to restore the casualty. To read the full case study go to www.goltens.com/in-situ-machining/in-situ-machining-for-saudi-electric-company-gas-turbine-rotor-shaft.
Hyde Guardian Gold 300m3/hour BWT System aboard ROV Survey Vessel
มุมมอง 1.6K10 ปีที่แล้ว
3D model of a Hyde Guardian 300m3/hour Ballast Water Treatment system over 3D scan output aboard the Polar Queen, an ROV Survey/Construction vessel. Goltens performed 3D scanning, system modeling, detailed engineering, prefabrication of piping and materials and project management oversight of the installation in the shipyard. To read the entire case study please click here www.goltens.com/green...
Optimarin Ballast Water Treatment System Installation by Goltens
มุมมอง 3.1K10 ปีที่แล้ว
This is the sister vessel of a ship where Goltens Worldwide did a retrofit installation of an Optimarin ballast water treatment system. The model from the first vessel has been inserted into the point cloud of its sister vessel in this video. Learn more about ballast water treatment systems at goltens.com/green-technologies/ballast-water-treatment-retrofits Contact Us: green@goltens.com www.gol...
Goltens Shipyard Flange Machining
มุมมอง 5K10 ปีที่แล้ว
Goltens expert In-Situ technicians perform a number of on-site machining procedures including metal stitching, flange facing, surface machining, and more. Here, Goltens technicians perform a workshop test of the flange facing machine prior to deploying it to machine a large crane pedestal. Learn more at www.goltens.com/in-situ-machining
Optimarin Ballast System (2000 m3/hr) retrofit on a Bulk Carrier - Goltens
มุมมอง 1.9K10 ปีที่แล้ว
Optimarin Ballast System (2000 m3/hr) retrofit on a Bulk Carrier - Goltens
3D Laser Scanning for BWT System by Goltens
มุมมอง 93710 ปีที่แล้ว
Watch a ballast water treatment retrofit installation carried out while sailing with the vessel by the Goltens installation team. Visit goltens.com/green-technologies/ballast-water-treatment-retrofits to learn more about ballast water treatment retrofitting and 3D scanning by Goltens. Contact Us: green@goltens.com www.goltens.com/green-technologies 31(0)181 465 100
Goltens Single Point Crankshaft Machining - Pielstick 18PC4 2V
มุมมอง 13K10 ปีที่แล้ว
Goltens Single Point Crankshaft Machining - Pielstick 18PC4 2V
Optimarin Ballast System (1000 m3) retrofit on a Container Ship - Goltens
มุมมอง 1.3K10 ปีที่แล้ว
Optimarin Ballast System (1000 m3) retrofit on a Container Ship - Goltens
Headway Oceanguard Ballast Water Treatment System retrofit on a Bulk Carrier
มุมมอง 2.2K10 ปีที่แล้ว
Headway Oceanguard Ballast Water Treatment System retrofit on a Bulk Carrier
3D Laser Scan and multi-system modeling for a Car Carrier undergoing BWT retrofit planning - Goltens
มุมมอง 87110 ปีที่แล้ว
3D Laser Scan and multi-system modeling for a Car Carrier undergoing BWT retrofit planning - Goltens

ความคิดเห็น

  • @thangledinh9009
    @thangledinh9009 3 ปีที่แล้ว

    Ngon thế

  • @zatmanh2
    @zatmanh2 4 ปีที่แล้ว

    Nice job. They know this engine !

    • @offthecuffadventureswithjamie
      @offthecuffadventureswithjamie 8 หลายเดือนก่อน

      They know machining.

    • @zatmanh2
      @zatmanh2 8 หลายเดือนก่อน

      During my 30 years in diesel engines’ maintenance , many Times i has worked with the Goltens teams (Hong Kong, Dubai, florida, Norway, Singapour,etc..) always with good results. Regards to them.