- 84
- 12 655
New Home- A & J
Australia
เข้าร่วมเมื่อ 11 เม.ย. 2012
Hunter Valley, NSW
Shed Renovation's Part 72 - Brush Box 200X25 finish lining boards
We have about 400 meters of brush box boards ranging in size from 200-225mm X 31mm (8-9 inches by 1 1/4 inch). We run these over the jointer and a few passes on the thicknesser and then put a rebate in each edge for a basic wall lining.
These boards are going on most of the walls in the shed and in the living area.
These boards are going on most of the walls in the shed and in the living area.
มุมมอง: 3
วีดีโอ
Shed Renovation's Part 71 - Bolting down the Mezzanine and the Stairs
มุมมอง 839 ชั่วโมงที่ผ่านมา
The video footage is out of sequence. Please don't trust the IT person to get it right (Aka, that's me, that's my day job!). We are getting small steps done to help with the next; we both hate not finishing a job, but this is the only way to keep pushing on.
Shed Renovation's Part 70 - day two of laying decking, this was our Xmas day.
มุมมอง 82214 วันที่ผ่านมา
The main issues we had were the bad machining of this decking, some of the boards being 1-2 mm undersize, and the pencil round profile not matching. Trust me, I know how to set up a timber moulder and why to check the profile between griding cutters on the profile grinder or changing TC tips in cutter heads. Anyway the deck is down so we can safely move around, the next stage will be down in th...
Shed Renovation's Part 69 - Decking, painting doors, and skirting boards
มุมมอง 7821 วันที่ผ่านมา
Finally got the decking down on the undercover section of the deck, painted the doors and shriting boards ready for the waterproof flooring.
Shed Renovation's Part 68 - Prep work for the internal wall linings and decking.
มุมมอง 4228 วันที่ผ่านมา
Shed Renovation's Part 68 - Prep work for the internal wall linings and decking.
Shed Renovation's Part 67 - Last fly screen, painting, and fixing the old sash and cord window.
มุมมอง 44หลายเดือนก่อน
The old window needed some glazing putty, i havent done that for years... and the last external wall cladding sheet is cut for this stage of the build. I also make a jig for the door handles to be routered in to the Western red cedar doors.
Shed Renovation's Part 66 - Shower Screen install, and Fly screens.
มุมมอง 45หลายเดือนก่อน
We ordered the shower screen and need to drive to North Rock in Sydney to pick it up, the shower is now ready to use. The fly screens are installed, but we still need to add the cover strips.
Shed Renovation's Part 65 - Fitting the screen doors before painting, side steps and a landing slab.
มุมมอง 157หลายเดือนก่อน
We fit the screen doors before painting and adding the fly mesh. We also started by installing the side steps and pouring the small slab.
Shed Renovation's Part 64 - Door seals, and timber screen doors
มุมมอง 34หลายเดือนก่อน
We added the door seals to stop the snakes, etc., and the timber screen because we couldn't order custom-made units before Christmas.
Shed Renovation's Part 63 - Wall prep for linings, and shower tile grouting
มุมมอง 46หลายเดือนก่อน
Shed Renovation's Part 63 - Wall prep for linings, and shower tile grouting
Shed Renovation's Part 62 - One last part to the retaining wall, GENSET Auto start test.
มุมมอง 2852 หลายเดือนก่อน
In this video, I test the Autostart function from our Victron solar unit. Before the test, I removed the M.E.N link on the Stamford alternator and labelled the GENSET not to use the GPOs. The GPOs on the side are now locked. I've run a few tests on the input current over one hour of run time and messaged the fuel it used. It's an 11kva, currently at 22amps (running at 5 to 6kva), and uses 1.8 l...
Shed Renovation's Part 61- Last of the retaining wall, and shower tiling
มุมมอง 3372 หลายเดือนก่อน
Shed Renovation's Part 61- Last of the retaining wall, and shower tiling
Shed Renovation's Part 60 - We needed some wood chips, PTO Chipper
มุมมอง 1392 หลายเดือนก่อน
We gave the PTO chipper a test run and then checked it over to make sure all bolts and nuts were tight, we then feed it some more small trees. We are going clear all our old logging tracks, this is allowed by local lands and services.
Shed Renovation's Part 59 -Battery shed and Genset area drainage, carport road base, carpark cleanup
มุมมอง 1352 หลายเดือนก่อน
We had to go to Brisbane for a week for work, so we are a little slow on the videos. The Sparky finished wiring the solar unit to the shed and the genset. I finished with the Autostart generator cable and the Ethernet cable for its ComAp computer for remote monitoring. We needed to change from working on the shed to the carport as the solar unit was delivered; this would allow us to swap from t...
Shed Renovation's Part 58 - External Cladding, Genset move.
มุมมอง 4903 หลายเดือนก่อน
We have started on the External Cladding again. The solar setup turned up, and we needed to build the carport to install the panels. This new system will save us the cost of the genset running 6 hours daily to charge the Bluetti.
Shed Renovation's Part 57 - Genset concrete slab, road base under the carport.
มุมมอง 1.9K3 หลายเดือนก่อน
Shed Renovation's Part 57 - Genset concrete slab, road base under the carport.
Shed Renovation's Part 56 - filling the carport with road base, prep work for the Genset slab.
มุมมอง 1.3K3 หลายเดือนก่อน
Shed Renovation's Part 56 - filling the carport with road base, prep work for the Genset slab.
Shed Renovation's Part 55 - Carport roofing and water pipes
มุมมอง 2803 หลายเดือนก่อน
Shed Renovation's Part 55 - Carport roofing and water pipes
Shed Renovation's Part 54 - Carport & Digging with a Pressure Washer.
มุมมอง 3213 หลายเดือนก่อน
Shed Renovation's Part 54 - Carport & Digging with a Pressure Washer.
Shed Renovation's Part 53 - Stone stairs, solar carport.
มุมมอง 4903 หลายเดือนก่อน
Shed Renovation's Part 53 - Stone stairs, solar carport.
Great job what a beautiful deck
Thank you, we have more to do, we had rain the last few days… so back to tomorrow.😊
Amazing
Thank you,