- 5
- 3 426
Paul Douglas
เข้าร่วมเมื่อ 4 มิ.ย. 2015
Bayliner 3988 Hardtop Installation
In this video you are going to learn how to replace a canvas cockpit cover with a fibreglass hard top on a Bayliner 3988. The hardtop increases storage capacity and square footage by 78 square feet. With three support posts it can hold up to approximately 750 pounds.
Tools you'll need: Drywall lift, grinder, screwdrivers, drill and bits, caulking and caulking gun.
Tools you'll need: Drywall lift, grinder, screwdrivers, drill and bits, caulking and caulking gun.
มุมมอง: 2 714
วีดีโอ
Blown engine Cessna 172
มุมมอง 1134 ปีที่แล้ว
Had a F and M oil filter adapter gasket blow while flying. Landed the plane 6 min later at Qualicum Beach airport on Vancouver Island to check the damage. It wasn’t good. Safe landing but needed a new engine.
Vargus Island Beach Landing #2
มุมมอง 1289 ปีที่แล้ว
Flight in a Cessna 172 from Courtenay across Strathcona Provincial Park near Gold River. Flew up the Coast to check out Calvin Beach which is supposed to be amazing to land on. Tide wasn't the best so we didn't land. We then flew and landed at Vargus Island near Tofino B.C. It is an amazing beach to spend the afternoon at.
Vargus Island Beach Landing June 6, 2015
มุมมอง 3979 ปีที่แล้ว
Beach landing at Vargus Island near Tofino B.C. What an incredible place we live in. Flight initiated from Courtenay B.C. which is about a 40 minute flight to Vargus Island.