- 58
- 413 308
For You
India
เข้าร่วมเมื่อ 19 พ.ย. 2011
This channel is created for let you understand Technical field concept & other learning content for your better understanding
วีดีโอ
How to prepare technical estimate in SAP for approval of A&FS
มุมมอง 1737 หลายเดือนก่อน
This video tell about the process in SAP for preparation of technical estimate for approval of A&FS, it also tell about shortest process.
How To Connect 3 Way Pulley to 2 Way Pulley
มุมมอง 283ปีที่แล้ว
In this video we learn how to connect 3 way pulley to 2 way pulley
How to perform Transformer "CFT" Test/ Transformer Core/Frame to Tank IR Test
มุมมอง 1.8Kปีที่แล้ว
In this video I demonstrate about the Transformer "CFT" Test/ Transformer Core/Frame to Tank IR Test
How to Upload Estimated Material from Estimate prepared in SAP to CJ20N
มุมมอง 1K2 ปีที่แล้ว
Description of estimated material upload in SAP under CJ20N from estimated prepared under SAP
Transformer control wiring series-3 (Control wiring-11)
มุมมอง 3.8K3 ปีที่แล้ว
How to understand Transformer wiring/ 132/33 kV, 20/25 MVA (IMP-Make) transformer wiring/page wise explanation 1drv.ms/f/s!AhVIF5DmxHVkgT47NfXQ03Gj0Bp9
Transformer control wiring series-2 (Control wiring-10)
มุมมอง 8843 ปีที่แล้ว
How to understand Transformer wiring/ 132/33kV ,20/25 MVA (IMP -make) transformer wiring/Page wise Explanation 1drv.ms/f/s!AhVIF5DmxHVkgTtXaRoSIGf2XnMx
How to cancel Material (Consumed) document which was consumed through ORDER and ORDER is closed
มุมมอง 2843 ปีที่แล้ว
How to cancel Material (Consumed) document which was consumed through ORDER and ORDER is closed
How to rectify frequent damage of tripping coil of circuit breaker/ Tripping coil(control wiring-9)
มุมมอง 1.8K3 ปีที่แล้ว
th-cam.com/video/jprVK2hh-v4/w-d-xo.html
How to generate material receipt recovery or annexure-I in SAP-Module
มุมมอง 2773 ปีที่แล้ว
How to generate material receipt recovery or annexure-I in SAP-Module
Transformer wiring and cable schedule part-1 (Control wiring-8)
มุมมอง 31K3 ปีที่แล้ว
Transformer wiring and cable schedule part-1 (Control wiring-8)
How to Print Purchase Order/ Work Order/ DI in SAP-Module
มุมมอง 13K4 ปีที่แล้ว
How to Print Purchase Order/ Work Order/ DI in SAP-Module
33 kV Circuit Breaker/Relay Panel Control Wiring&Interconnection&Wiring Schedule (Control wiring-7)
มุมมอง 50K4 ปีที่แล้ว
33 kV Circuit Breaker/Relay Panel Control Wiring&Interconnection&Wiring Schedule (Control wiring-7)
How to make erection/commissioning of 132 kV ABB make SF6 Circuit Breaker
มุมมอง 14K4 ปีที่แล้ว
How to make erection/commissioning of 132 kV ABB make SF6 Circuit Breaker
33/132/220/400 kV Current Transformer Erection
มุมมอง 4.3K4 ปีที่แล้ว
33/132/220/400 kV Current Transformer Erection
AC &DC Distribution Circuit (Control Wiring -6)
มุมมอง 5K4 ปีที่แล้ว
AC &DC Distribution Circuit (Control Wiring -6)
Process of Leave Encashment Application/Approval/Order generation through SAP Employee Portal/SAP
มุมมอง 3.7K4 ปีที่แล้ว
Process of Leave Encashment Application/Approval/Order generation through SAP Employee Portal/SAP
How to make REF protection wiring (control wiring-5)
มุมมอง 6K4 ปีที่แล้ว
How to make REF protection wiring (control wiring-5)
How to Print/View ASSET Register in SAP-Module
มุมมอง 8K4 ปีที่แล้ว
How to Print/View ASSET Register in SAP-Module
How to Print/View FORM-16 in SAP- Module
มุมมอง 7K4 ปีที่แล้ว
How to Print/View FORM-16 in SAP- Module
TVM &MFM & Ammeter & Ammeter selector switch and voltage indication lamp wiring (Control Wiring -4)
มุมมอง 3.8K4 ปีที่แล้ว
TVM &MFM & Ammeter & Ammeter selector switch and voltage indication lamp wiring (Control Wiring -4)
How Transformer Oil Filtration Machine Works
มุมมอง 9K4 ปีที่แล้ว
How Transformer Oil Filtration Machine Works
Current Transformer MK to Panel wiring (Control wiring-2)
มุมมอง 19K4 ปีที่แล้ว
Current Transformer MK to Panel wiring (Control wiring-2)
😂
Can we have it in English?
Excellent information highly recommend for engineers
Thanks you sir condenser bushing dikhane ke lie
Sir sab check lekin continuous pulse mil rha h k59 pr
Confusion Clear
Breaker kaun se make ka h
Sir download nhi ho rha other option dijiye
Please share your contact no.
Sir, I want to connect with you
Sir ek ref RELAY me stabilizing resistance series me lagaa hai us RELAY me over current earth fault with r e f protection inbuilt hai.ab wo RELAY damage ho gyi hai ab M dusri RELAY lagana chahta hu wo only ref protection RELAY hai.kya ab us RELAY me stabilizing resistance series me lagana padega.
English if you want subscribe like and share otherwise you talking to yourself 👎🤑
i think it is a great subject videos but the drawback is using local language at use subtitle if you don't speak english
could make in English if you want broad audience members
what is this
I have a question that has been bothering me: after changing the settings of the protection relay, do I still need to conduct a test? For example, the overcurrent protection has been changed from 5A to 6A. Do you still need to test the relay protection? Thank you.
From ct to master trip realy
Sir please give me your contact number
These people are doing erection without PPE, safety shoes, safety helmet and reflector jacket.
Sir send control panel wiring drawings photo in your chanels
Thank you
Pdf not downloading
can u plz wrote to me which number is you entered for checking reservation c20n or what
Its CJ20N
Jay Sri Krishna 🙏
KINDLY SHARE THE DRAWING
Shame on you😢! No helmets, no safety shoes, no harnesses.... Why do you show this? Are you proud of?
Itna haf kyu rahe ho
Rất hay và bổ ích
Thankyou sir ji
Plz share how to create material estimate ..
Please provide the video from relay pannel to control panel sir
Very informative video sir.thanks Can you please provide connection diagram of 33kv vcb BHEL make from c&r panel to circuit breaker. i have connection drawing of circuit breaker and control panel.
TA bill new video create kariye
Wow the video is very bright and clear…
2 kv hi kyo 5 kv kyo nhi...
plz provide to me scheduling of VCB to relay pannel @ umesh.sherestha@gmail.com sir
More than unexpected effects in your video, its looking not good
Sap ke aur video daliye
Plz provide to me Pannel wiring pdf sir
Q video banaye ho bhai ......
Pay sheet of last month July,23
, memari divn.
Please show me pay sheet July,23 & my Vendor ID code is 506846.
My vendor ID comes to506846
I want my pay sheet of July,23
Nice video sir I request to provide pdf file also sir
Hi, I like your lecture. Thanks
Sir PDF milega
OMG the video quality is so clear and so sharp. Very nice pixel quality Keep up your good job
Nicely explained 👍👍
How to add more line item, one po total line item 08 so how to add pls tell.
Thanks you sir