- 88
- 634 444
Roughnecking and Fitness
เข้าร่วมเมื่อ 10 มี.ค. 2016
วีดีโอ
13.38 Casing trip with CRT, casing running tool
มุมมอง 620ปีที่แล้ว
13.38 Casing trip with CRT, casing running tool
Casing drilling with PRT, premiere running tool
มุมมอง 313ปีที่แล้ว
Casing drilling with PRT, premiere running tool
17.5" section BHA pull out , motor and drill bit breakout pt 3
มุมมอง 1.6Kปีที่แล้ว
17.5" section BHA pull out , motor and drill bit breakout pt 3
17.5" section Bottom hole assembly, pull out and lay down pt2
มุมมอง 508ปีที่แล้ว
17.5" section Bottom hole assembly, pull out and lay down pt2
17.5" section Bottom hole assembly, BHA pull out of hole.. Pt 1
มุมมอง 1.2Kปีที่แล้ว
17.5" section Bottom hole assembly, BHA pull out of hole.. Pt 1
5.5” tubing pull out with power tong #drilling
มุมมอง 6Kปีที่แล้ว
5.5” tubing pull out with power tong #drilling
100 pull ups,300 push ups and 300 squats in 20 minutes Emom ( Every minute on the minute )
มุมมอง 141ปีที่แล้ว
100 pull ups,300 push ups and 300 squats in 20 minutes Emom ( Every minute on the minute )
13 3/8 casing running by one floorman/roughneck
มุมมอง 219K2 ปีที่แล้ว
13 3/8 casing running by one floorman/roughneck
Pull out of hole and rack back 5 1/2 drill pipe
มุมมอง 5K2 ปีที่แล้ว
Pull out of hole and rack back 5 1/2 drill pipe
Derrickman 5 1/2 inch drill pipe connection
มุมมอง 22K2 ปีที่แล้ว
Derrickman 5 1/2 inch drill pipe connection
Running in hole 4 inch drill pipe singles (typical lone ranging )
มุมมอง 6K2 ปีที่แล้ว
Running in hole 4 inch drill pipe singles (typical lone ranging )
Coiled Tubing👍
Why don't they dope the threads?
we would have run 5 joints to their 1 on an old rig with automatic stuff
Worked back in 1973, still remember the night around Xmas when no one showed up to work, just me and the tool push driller guy, I run casing, threw the chain, was motorman and unloaded a truck full of casings. Oh yeah, unloaded some mud mix into the pit. Did i mention it was my first day of working rigs? Holds a special place in my experience! I never knew anyone could swear like that haha
Slow operation
Why only one floorman/ roughneck
Derrick mam ( latch hamd) was.my first job in the patch
Did the tong hand just abandon this guy?
I'm very familiar with this well Head Equipment.. And with Running Tool.. I'm almost 20year in Assembly Department..Jakarta.. Oman and Saudi Arabia FMC TECHNOLOGY.. Technipfmc.. Sweet memory.. ❤️❤️
How often do the threads cross on the pipes ? Or is it almost impossible cuz of the low pitch?
I think other floorhands go for tea break loooollllll😂😂😂
The totco?
And nobody threw any chain at all. Sad day😢
The worm never pushed his tongs down far enough to wrap the chain. Noboby wrapped the chain, but the pipe spun up as if by magic. What gives? Retired oil field trash society, asking for a friend. That subatructure must be way off for that worn to have to let it back-swing, before he comits to the big push to stab it in the mouse-hole. We get better : )
What turned that pipe? No chain on it, wasn"t the rotary(worms tongs had it clamped.😮 Spinner kelly?
19 3/4"
So now the centraliser is not able to do what it was designed for.... Franks amateurs at work :-)
🙄🙄🙄🙄
I think t another thing , why he is not applying baker lock , or bdlzona this is a 9 5/8 casing landing
❤
Deseo trabajar en las driliadoras, ya trabaje en las pullin units alguna compañia por ahi?
Back in the late 70s me 17 and kid brother 15 working on a triple. Production casing run, to TD. The drift got hung up on the top treads, when the pipe slip by the V door it broke lose for the fast fall. MY DRILLER SAID RUN. The motor man held onto the swing casing. The drift fell and bounced off the steel floor ripping my motor mans face off. I guess we all have are PTSS.
Seems like 7 5/8”
I want one
Short handed on a rig in South Texas in 1970 you doubled over or you didn't come back
Should be using the Tesco CRT. Way faster than that McCoy thing, also should have been drifted on the ground. Sure fire way to get stuck taking that long.
the template is lightweight... we definitely have a steel one, you can't lift it without eating...
My Ex-compnay adnoc onshore abu dhabi
Just about puked watching this lol
Things sure have changed a lot in 23 since I roughnecked.
Wow unreal how slow and waste of money , that rig is probably shut down now due to lack of competitiveness sad
What's the point of a harness if your not using the SRL or some kind of fall protection
Mucha tecnologia para trabajar tan lento, se supone que tienen problemas con la estabilidad de hoyo, de lo contrario no se explica el uso de esta herramienta, trabajar seguro no significa trabajar lento. Podras perforar a 300ft/h, usar el mejor lodo y broca...pero si no aterrizas el CSG...mierda.
Amazing! Great job! Slow, easy and safe!
supply mud pump parts❤❤
Работают очень плохо. Медленно, где все люди? Посадил на клинья труба должна быть готова, прошобланированна и смазана. Работал в Нейборсе в России за такую работу давно попросили с работы.
WoW that’s slow , why they don’t put the centralizer on the coupling !! Buddy is there beating up the centralizer with a hammer how dumb !!
I hate a slow casing run.. run that shit.. don't babysit that pipe.
13 5/8
13 3/8
That's not 5 - 1/2" DP
Yes it is.
One guy running the V door
Connexion, add 1 sgl and continue drilling.....
good job
Why aren't women fighting for the equality to work here?
Hello testosterone !
This job's really a bitch when the transgender doesn't show up and 2 guys have to do the work of 3.
At first, I thought it said "Rothschild's" rather than roughnecks. I thought, "No way!"
S...e...x..y man
Fast trip seems like a bullshit trip wait till your missing a finger
13 3/8..! Right . BIG IRON respect 💯 we ran that out on Platform Harmony Exxxon Mobile 2013..! Worlds longest reach record holder for. A minute .... 42,000+ ft ! God bless all my brothers in the patch . Hope to rejoin you-all soon N