- 7
- 58 453
2Morrow Solutions
เข้าร่วมเมื่อ 14 มี.ค. 2016
5S Workplace Organisation
5S is a foundation practice of Lean Management and relies on housekeeping as the basis of productivity improvement. By providing a systematic approach, 5S can standardise and sustain housekeeping tasks and provides a platform for continuous improvement initiatives.
มุมมอง: 4 296
วีดีโอ
MTM and User Interface Design
มุมมอง 8338 ปีที่แล้ว
Methods-Time Measurement can improve the design of user interfaces by analysing the motions of an operator's interaction with a machine. MTM can reduce machine interaction times, operator energy expenditure and improve ergonomics.
Lean Management - An Introduction (Part 2)
มุมมอง 4488 ปีที่แล้ว
In Part 2 of our presentation, we build upon the concept of Lean Management (see Part 1) to briefly introduce Value Stream Mapping (VSM) and several well known Lean tools: 5S, Visual Management and Standard Work
Lean Management - An Introduction (Part 1)
มุมมอง 7838 ปีที่แล้ว
We introduce the concept of Lean Management in Part 1 of this presentation. In Part 2, several of the more well known tools are briefly introduced.
Engineered Standard Time Systems
มุมมอง 3.1K8 ปีที่แล้ว
Standard Times are important for routing times, product costing, productivity measurement and labour capacity calculations. In this video presentation we introduce the concept of Engineered Standard Time Systems using MTM-2, from the global Methods-Time Measurement family of Predetermined Motion Time Systems.
Methods-Time Measurement (MTM) in Layout Design
มุมมอง 30K8 ปีที่แล้ว
Combining Methods-Time Measurement with a methodical layout design process can enhance the design of factories, warehouses and offices by assisting the optimisation of work area layouts (micro-layouts) by predetermining process times and labour capacity requirements.
Lean Management and Methods-Time Measurement
มุมมอง 19K8 ปีที่แล้ว
Lean Management can be enhanced by the inclusion of Methods-Time Measurement (MTM) in one of the key tools used in Lean Management: Standard Work. MTM can improve the effectiveness of methods improvement by documenting the method and calculating the process time before the improvements have physically been implemented. For more information, visit www.2morrowsolutions.com.au