HERBERT HOOVER DIKE REACH 1 CUTOFF WALL GAP CLOSURE PROJECT
TREVIICOS completes Herbert Hoover Dike Reach 1 Cutofff Wall Gap Closure Project.
The HHD Reach 1 Gap Closure Project awarded to main contractor TREVIICOS included construction of sections to close the gap between cutoff walls and existing structures at different points around Herbert Hoover Dike, the 143 earthen dike surrounding Lake Okeechobee.
To complete the task TREVIICOS employed two types of cutoff wall technologies: first, cutoff wall by jet grouting abutting the existing structures, a two-phase process combining pre-drilling of the native soils and jet grouting. The pre-drilling, specified to due to the presence of the hard rock layer, consisting of 239 columns with an average depth 55 ft. After completion, the task called for drilling and jet grouting columns down to the design depth.
The second technology, the self-hardening slurry (SHS), developed for the first time by TREVIICOS during the work previously performed as part of the HHD Reach 1 Cutoff wall, was also divided into two phases. After the clamshell excavated down to the rock layer the hydromill took its place and continued excavation down to design depth.
One of the main challenges was to manage logistics between project sites, situated as far as 30 miles from each other, a task TREVIICOS performed in total safety as reflects its superior record.
Part of a major rehab project
The rehabilitation works are part of the Army Corps of Engineer’s $870+ million investment in projects and safety measures at Lake Okeechobee to reduce the risk of catastrophic failure and flooding for a large area of South Florida.
Installation of over 50 miles of cutoff wall around the lake, along with replacing old water control structures, commonly known as culverts, are some of the steps being taken to protect the area.
TREVIICOS, in addition to the GAP closure, is now working on the Eastern Section of the lake in the Reach 1 Extension and the MATOC Task Order 2 for a total of over 3.5 million sq. Ft. developing over approximately 12 miles of cutoff wall.
มุมมอง: 1 320

วีดีโอ

MBTA CHARLESTOWN BUS FACILITY SHORELINE STABILIZATION
มุมมอง 8025 ปีที่แล้ว
TREVIICOS participated in the MBTA Charlestown Bus Facility shoreline stabilization project by installing jet grout columns. This federally funded project provides for construction of a new length of seawall to replace the existing seawall along the Mystic River, which had been subject to erosion due to tidal action and was risking collapse. The completed project will ensure the integrity of th...
FENWAY CENTER
มุมมอง 1.2K6 ปีที่แล้ว
TREVIICOS has just completed a slurry wall foundation system that will enable construction for the first phase of Fenway Center, a development project located just steps away from Fenway Park, Boston’s temple of baseball. The Fenway Center 1.1 million sq. ft. mixed-use air rights development project in Kenmore Square will include five new buildings; one of which will be a 27-story residential t...
FOUNDATIONS FOR THE NEW BOSTON CHILDREN’S HOSPITAL FACILITY
มุมมอง 4776 ปีที่แล้ว
The Children’s Hospital in Boston, Mass. is the nation’s foremost pediatric care facility. To serve the needs of patients and families, it is undertaking expansion by constructing a new state-of-the-art clinical building in the Longwood Medical Area, which will rise eleven stories and have four below-ground levels. Treviicos, subcontracted to JF White second tier subcontracted to Suffolk, has p...
MIT Campus Expansion
มุมมอง 1.5K6 ปีที่แล้ว
TREVIICOS HELPS TO EXPAND MIT CAMPUS Treviicos is the foundation contractor for the MIT Kendall Square Initiative SoMa Project in Cambridge, Mass. The project is an ambitious mixed-use development that encompasses construction of five buildings containing housing units, educational, office and retail space and three underground parking garages beneath them.
ECHELON SEAPORT PROJECT
มุมมอง 9926 ปีที่แล้ว
A SLURRY WALL FOUNDATION FOR A HIGH-PROFILE SEAPORT PROJECT TREVIICOS is nearing completion of the slurry wall foundation for the Echelon Seaport, an ambitious mixed-use development project underway at Boston’s rapidly expanding Seaport District.
110 Broad Street, Financial District, Boston
มุมมอง 8797 ปีที่แล้ว
TREVIICOS for the foundation works of the new-construction building overlooking the Rose Kennedy Greenway and Boston Harbor.
Foundations for One Dalton in Boston
มุมมอง 1.3K7 ปีที่แล้ว
TREVIICOS has completed the foundation work at the new Four Seasons One Dalton located in Boston. When completed, the building will stand nearly 755 feet and have 215 guest rooms at its base and 180 luxury condominiums above. The tower rests on a number of load bearing elements (LBE) that were dug by TREVIICOS, using a hydromill, to depths exceeding 190 feet. Also installed were a combination o...
TREVIICOS performing ground stabilization along SR83/US 331 highway
มุมมอง 3547 ปีที่แล้ว
TREVIICOS performed ground stabilization along existing causeways of SR83/US 331, a North/South roadway in Walton County that is a crucial link for tourism and commerce between the local beaches and the heavily traveled I-10 corridor in the panhandle of Florida. The roadway also serves as the primary hurricane evacuation route from southern Walton County. The ground stabilization consisted in a...
Wolf Creek Dam - A High Priority Dam Remediation
มุมมอง 3.5K8 ปีที่แล้ว
The Wolf Creek Dam is a 5,736 ft (1,748 m) long and 258 ft (79 m) high dam with a combined earthen and concrete structure. Because of seepage problems in the dam's foundation, it has become the U.S. Army Corps of Engineers's top dam priority.
Out there - TREVIICOS People
มุมมอง 8548 ปีที่แล้ว
A closer look at TREVIICOS people working at dam sites around the country.
Turbomix Technique
มุมมอง 3328 ปีที่แล้ว
The technique relies on mechanical means to create an in situ mixture of soil and grout. It can create continuous vertical barriers, reinforced if needed by the insertion of H beams.
New Orleans East Back Levee Enlargement
มุมมอง 6088 ปีที่แล้ว
After Hurricane Katrina first emergency interventions, the Army Corps of Engineers of the New Orleans District, through the New Orleans Hurricane Protection Office, designed a special plan entailing a number of interventions: the New Orleans Hurricane Protection System. The plan is intended to improve the city protection and defence system, as well as harmonise and increase the effectiveness of...
Wolf Creek Dam - Foundation Remediation Project
มุมมอง 20K8 ปีที่แล้ว
Wolf Creek Dam is on the Cumberland River in south central Kentucky. It provides hydropower, flood control, water supply, and water quality benefits for the Cumberland River system and surrounding region. The lake is a source of recreation that has attracted more visitors (4.89 million) than Yellowstone National Park (2.87 million). Designed and constructed during the period 1938-1952, the 5,73...