Mark Nolan
Mark Nolan
  • 69
  • 50 461
ICG train up the helix
Running some trains to finish the op session. Here is an ICG chasing its tail up the helix.
มุมมอง: 286

วีดีโอ

ICG Ashley, IL
มุมมอง 1.1K21 วันที่ผ่านมา
ICG Ashley Local.
ICG grain extra
มุมมอง 2272 หลายเดือนก่อน
Extra 6031 South, unit grain train.
ICG trains. OP session #2
มุมมอง 8022 หลายเดือนก่อน
ICG trains. OP session #2
Switching Centralia Yard
มุมมอง 2364 หลายเดือนก่อน
We have reached a point in construction of the layout where it’s time to test and modify before operations begin. Here is an ex-Southern SD24, bought by the ICG and put in service before going through a rebuild program. It Is working in Centralia yard, switching cars into north or south blocks for pickup.
August 10, 2024
มุมมอง 4425 หลายเดือนก่อน
Aug 10 2024 op session
ICG Layout tour, 2 year construction
มุมมอง 1.2K5 หลายเดือนก่อน
After 2 years of construction, the first operation session was held and I made this video to show the layout.
March 31, 2024
มุมมอง 1669 หลายเดือนก่อน
The race to Centrailia yard. Testing trains. Notice the new Walther’s DM&IR SD9’s. The ICG leased them winters when it was too cold to run taconite trains.
Lift bridge operation
มุมมอง 1.2K9 หลายเดือนก่อน
This is the list bridge that connects the Hi-Dry to Effingham. It is normally kept open during operations but closed when a train needs to cross the bridge to the main part of the layout.
New Tangent hoppers on ICG coal train
มุมมอง 1.3Kปีที่แล้ว
ICG coal and grain trains
First ICG mainline run
มุมมอง 320ปีที่แล้ว
First train to run the complete ICG mainline. Not all towns shown.
Two ICG trains
มุมมอง 139ปีที่แล้ว
Two ICG trains running on the layout. The first is off the Freeport branch, southbound approaching Centrailia. The second train is southbound through Ashley, IL
ICG staging testing.
มุมมอง 2Kปีที่แล้ว
Just running a train into ICG staging, which is now covered.
ICG local
มุมมอง 105ปีที่แล้ว
Testing the new layout with an ICG local.
Kiss End of the road tour
มุมมอง 1.9Kปีที่แล้ว
Nashville Bridgestone Arena. Oct 23 2023. Rock and Roll All Nite, grand finale. Goodnight!
Arriving into Centralia yard.
มุมมอง 252ปีที่แล้ว
Arriving into Centralia yard.
RJ Corman with horn show
มุมมอง 292ปีที่แล้ว
RJ Corman with horn show
Busy day at Effingham
มุมมอง 3452 ปีที่แล้ว
Busy day at Effingham
First ICG train through the crossing
มุมมอง 2772 ปีที่แล้ว
First ICG train through the crossing
New Conrail Helix
มุมมอง 1372 ปีที่แล้ว
New Conrail Helix
First run on new helix
มุมมอง 1262 ปีที่แล้ว
First run on new helix
Amtrak test train
มุมมอง 6072 ปีที่แล้ว
Amtrak test train
ICG coal train
มุมมอง 9272 ปีที่แล้ว
ICG coal train
LV video tour misc shots
มุมมอง 1.3K2 ปีที่แล้ว
LV video tour misc shots
Video tour of LV layout part 3 of 3
มุมมอง 2K2 ปีที่แล้ว
Video tour of LV layout part 3 of 3
Video tour of LV layout part 2 of 3
มุมมอง 1.6K2 ปีที่แล้ว
Video tour of LV layout part 2 of 3
Video tour of LV layout part 1 of 3
มุมมอง 1.2K2 ปีที่แล้ว
Video tour of LV layout part 1 of 3
Local Returning to Packerton Yard
มุมมอง 3982 ปีที่แล้ว
Local Returning to Packerton Yard
Eastbound at Bethlehem Steel
มุมมอง 3132 ปีที่แล้ว
Eastbound at Bethlehem Steel
D&H train AM-1 westbound
มุมมอง 5662 ปีที่แล้ว
D&H train AM-1 westbound

ความคิดเห็น

  • @SpringfieldAndWestern
    @SpringfieldAndWestern 15 วันที่ผ่านมา

    Very nice switching ops 👍

  • @68Jaguar420G
    @68Jaguar420G 15 วันที่ผ่านมา

    It's nice to see well laid track with roadbed on a helix rather than the increasingly common track-screwed-to-bare-plywood approach.. Seems to operate well and certainly no indication of any kinks or other alignment problems. Nicely done.

    • @ICG-Conrail1976
      @ICG-Conrail1976 15 วันที่ผ่านมา

      @@68Jaguar420G thanks. This isn’t the first helix I built and I’ve learned from previous attempts. The key is getting a smooth transition on the first lap and then keeping it consistent going up. And test each level while you can fix any problems before the next level is added. Always test with the highest and longest cars that will be run.

  • @KandWRailroader
    @KandWRailroader 16 วันที่ผ่านมา

    I like that kitbashed industry at the beginning. Very interesting!

    • @ICG-Conrail1976
      @ICG-Conrail1976 15 วันที่ผ่านมา

      @@KandWRailroader it’s my version of Monsanto. I couldn’t find a picture of the prototype so I just combined several past projects from my last layout.

  • @walthoey7761
    @walthoey7761 16 วันที่ผ่านมา

    Dig the hand throws.

    • @ICG-Conrail1976
      @ICG-Conrail1976 15 วันที่ผ่านมา

      @@walthoey7761 ground throws for industry and yard sidings and dispatcher controlled mainline turnouts.

  • @cncpgreatlakesdiv4896
    @cncpgreatlakesdiv4896 16 วันที่ผ่านมา

    mark awesome layout new sub and bell my Friend.😊😊👍👍

  • @seanimal_rex
    @seanimal_rex 18 วันที่ผ่านมา

    Love the layout and love Southern Illinois!

  • @SpringfieldAndWestern
    @SpringfieldAndWestern 2 หลายเดือนก่อน

    Just stumbled across this video. Looks like a nice layout with lots of beautiful stuff going on! Subscribed.

    • @ICG-Conrail1976
      @ICG-Conrail1976 2 หลายเดือนก่อน

      Thanks. The layout has been under contraction for about 2 years. But this isn't my first time building one this size.

  • @SlaterDozierRailroadMedia
    @SlaterDozierRailroadMedia 2 หลายเดือนก่อน

    Very nice.

    • @ICG-Conrail1976
      @ICG-Conrail1976 2 หลายเดือนก่อน

      Thanks. It’s a fun run!

  • @wlalevee
    @wlalevee 2 หลายเดือนก่อน

    Looks great Mark!

  • @wlalevee
    @wlalevee 2 หลายเดือนก่อน

    Looks great Mark!!

  • @petermenningen338
    @petermenningen338 4 หลายเดือนก่อน

    Before Metra the Illinois Central ran two electric commuter rail services using Pullman made cars on the south side of Chicago Starting at the terminal under the Prudential Building / Main Public Library going to the far southeast side of Chicago. I used it many a Saturday to go downtown during Highschool and to Highschool city football games at Soldier Field (1965-1969). I would like to find those commuter cars in N scale for my collection. The closest track was two blocks from my house and its freight loads carried coal, scrap metals, and water purification supplies for the filtration plant at 79th street. US Steal South works was also still in operation at that time.

  • @monsvillerailways5736
    @monsvillerailways5736 4 หลายเดือนก่อน

    Huge layout. Will look great once you make a start on the scenery. Happy Modelling

    • @ICG-Conrail1976
      @ICG-Conrail1976 4 หลายเดือนก่อน

      Yes. I just got a delivery of scenery supplies to start covering the plywood!

  • @jonathanjones35
    @jonathanjones35 4 หลายเดือนก่อน

    Great video. It looks like an awesome railroad to run on. Makes me wonder while anyone is still messing around with HO (Ha!).

  • @tomgrabenstein2741
    @tomgrabenstein2741 5 หลายเดือนก่อน

    Very nice. Good to see early Amtrak on a layout. The helix is well made and can handle some traffic! Doc Tom

  • @marcinszajny8162
    @marcinszajny8162 5 หลายเดือนก่อน

    super projekt czekam na reszte projektu masz jakies niepotykane lkomotywy?

    • @ICG-Conrail1976
      @ICG-Conrail1976 5 หลายเดือนก่อน

      Thanks for your comment. I will post updates as we complete more of the layout. I have lots of locomotives and freight cars, serval are kit bashed and custom. I will try to include some in future videos.

  • @tomgrabenstein2741
    @tomgrabenstein2741 5 หลายเดือนก่อน

    Great video, Mark! I am really impressed with this overall build and the attention to detail. Good to see your progress and how far you've come in just a few years. I'm going to share this video with Clarksville model train club so they can see the elegant simple lift outs you use for crossing the doorway. We continue to struggle with our doorway crossings at the club. Looking forward to more of your posts Dr. Tom.

    • @ICG-Conrail1976
      @ICG-Conrail1976 5 หลายเดือนก่อน

      @@tomgrabenstein2741 thanks Tom. I had a different system to lift up all 4 levels above the door. The shelves were on tracks which proved in operation very difficult to manage unless the shelves were perfectly level and aligned. After much adjustments and attempts to fix the guides, it was scrapped and this works much easier. They can be installed and in place in just a minute or two.

    • @tomgrabenstein2741
      @tomgrabenstein2741 5 หลายเดือนก่อน

      @@ICG-Conrail1976 Thanks Mark. I will share this with the club members. Doc Tom

  • @MMRails
    @MMRails 5 หลายเดือนก่อน

    Loved your last layout, and I’m looking forward to seeing this new one come together.

    • @ICG-Conrail1976
      @ICG-Conrail1976 5 หลายเดือนก่อน

      @@MMRails me too! I learned a lot of the last layout which has helped building this one.

  • @jeffwhite3679
    @jeffwhite3679 5 หลายเดือนก่อน

    Good video Mark, don't sell your video skills short. I'm modeling Centralia IL in the 1955-1960 time frame. I live about 15 miles north of Centralia and the mainline is 100 yards out my front door. I've been doing extensive research for my layout. If you need photos, track plans just let me know, always happy to help out a fellow IC modeler.

    • @ICG-Conrail1976
      @ICG-Conrail1976 5 หลายเดือนก่อน

      @@jeffwhite3679 thanks Jeff. I’ve got the IC track charts and industry guide so that helps. I don’t have photos of most of the industries, so I am just winging it!

    • @jeffwhite3679
      @jeffwhite3679 5 หลายเดือนก่อน

      @@ICG-Conrail1976 Let me know what photos you need and I’ll see what I have. I’m getting ready to make another trip to the Centralia Area Museum and I can check there too.

  • @flights47
    @flights47 9 หลายเดือนก่อน

    If you have never seen a kiss show you missed out

  • @larrybaughman618
    @larrybaughman618 9 หลายเดือนก่อน

    🤠🚂🖐

  • @larrybaughman618
    @larrybaughman618 9 หลายเดือนก่อน

    🤠🚂🖐

  • @elsdp-4560
    @elsdp-4560 9 หลายเดือนก่อน

    Thank you for sharing. Nice.👍

  • @MMRails
    @MMRails 9 หลายเดือนก่อน

    I would have built that without the safety latch, then one night a slight breeze would make it drop and create a loud bang and scare me half to death. Great idea! And you don’t even need a password to make it drop!

  • @chuckhigdon218
    @chuckhigdon218 9 หลายเดือนก่อน

    Looks good.

  • @fabrizioviscardi40
    @fabrizioviscardi40 ปีที่แล้ว

    Hi, Great trains, I sub to your channel, stay connected and take care, cheers, Fabrizio - like 41

  • @kitchener2200
    @kitchener2200 ปีที่แล้ว

    Great video. I subscribed to your channel as well!

  • @joeystrains.9316
    @joeystrains.9316 ปีที่แล้ว

    100% AWESOME!

  • @landonmckeen4221
    @landonmckeen4221 ปีที่แล้ว

    nice layout

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      Thanks. It’s been under construction for about 18 months.

  • @landonmckeen4221
    @landonmckeen4221 ปีที่แล้ว

    i subscribed and like

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. Very nice.👍

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. Very nice.👍

  • @randysrockandrollrailroad8207
    @randysrockandrollrailroad8207 ปีที่แล้ว

    👍🤠👍

  • @saltman9584
    @saltman9584 ปีที่แล้ว

    Love the ICG layout so far. You still have the Lehigh valley layout?

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      No. The LV layout is gone and replaced by the ICG-Conrail Layout.

  • @jacksonthomas1851
    @jacksonthomas1851 ปีที่แล้ว

    Are those the new scale Trains ICGs? If so lucky you. I am looking for a few myself.

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      No these are GP10’s from Intermountain from a few years ago. I do have the Scale Trains SD40-2 on order.

  • @wlalevee
    @wlalevee ปีที่แล้ว

    Nice Mark! Love the Precision geep…

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. The staging looks nice, how many trains and number of cars?

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      23 staging tracks. Probably 22 cars avg, plus 3 engines and a caboose.

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. nice and smooth.👍

  • @zipper396
    @zipper396 ปีที่แล้ว

    Hate Genes political views,Pauls voice is not so great anymore,music is just ok.LOVED every minute of the show when they came to Syracuse last year and will pay to see them if they make it here again!

  • @hildebrandjansen5170
    @hildebrandjansen5170 ปีที่แล้ว

    End of the road should end with a residency at The Sphere in Las Vegas.

  • @jeffwhite3679
    @jeffwhite3679 ปีที่แล้ว

    Hi Mark! I'm also modeling Centralia but in 1955-1960 time frame. Looking forward to seeing more of your work.

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. Nice👍

  • @roberthultman9691
    @roberthultman9691 ปีที่แล้ว

    Congrats on your progress............. Really like the cut of 86' box cars, especially the DTI magenta cars........ and the ROCK blue box car............ Are the 86' cars earlier Athearn or Walthers cars or the recent Tangent cars? Looking forward to more progress on your RR.

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      Mostly Tangent. The DT&I are Walther’s and the Ann Arbor is a custom painted Athearn from the early 90’s.

  • @wlalevee
    @wlalevee ปีที่แล้ว

    Awesome Mark! Looks like the size of a club layout 👍

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      It keeps me busy! It’s about 36’x36’ and it’s doubled decked.

  • @jacksonthomas1851
    @jacksonthomas1851 ปีที่แล้ว

    When will we get to see more of the new layout? Also glad you kept your LV stuff.

    • @ICG-Conrail1976
      @ICG-Conrail1976 ปีที่แล้ว

      The de-construction of the old layout and building of the new has kept me busy. I haven't made any videos in a while because the train room looks like a tornado came though and looking at benchwork and plywood isn't too exciting. Hopefully soon I will get to a point I will do a walking tour around the new layout. Thanks!

  • @Nashvillesteam42
    @Nashvillesteam42 ปีที่แล้ว

    Rj cormen no 573 is my favorite locomotive

  • @fen4554
    @fen4554 ปีที่แล้ว

    1:44 Press (A) to vault.

  • @elsdp-4560
    @elsdp-4560 ปีที่แล้ว

    Thank you for sharing. Nice👍

  • @kensbackshop6399
    @kensbackshop6399 ปีที่แล้ว

    Rj corman has one of the best paint jobs on their diesels

  • @MMRails
    @MMRails 2 ปีที่แล้ว

    Is the train coming through the wall or through a divider? Took me awhile to realize what was happening. You filmed it in such a way that it looks like the train is just appearing from nowhere. Neat.

  • @elsdp-4560
    @elsdp-4560 2 ปีที่แล้ว

    Thank you for sharing. Nice.