Casting of Slab Steel Reinforcement _ Step by Step_Full Construction Process (A to Z) Part-3_720p_HD
Casting of Slab Steel Reinforcement _ Step by Step_Full Construction Process (A to Z) Part-3_720p_HD
Slab Steel Placing_Bottom & Top Bars_Extra Bars(L/3,L4)_Spacings (_Column BeamJunction :
In this video I am going to show Casting of Slab Steel ,
1) Bottom Bars
2) Top Bars
3) Extra Bars (L/3,L4)
4) Stirrups Spacing (4",6")
5) Column Beam Junction
6) Beam Size (15"×21")
7) Bars Overlapping (47")
8) Confining Bars use for Column Beam Junction
9) Spacers/Cover Blocks
10) Beam Levelling
11) Slab Thickness 6 "
No copy right music watch the video till to the End.
#civilengeenring #construction #civiltech #civilengineering #civiltop #foryou #civil #inspiration #motivational #success
@civilengineeringtechnology1
มุมมอง: 15

วีดีโอ

Casting of Slab Steel Reinforcement in Progress_ Step by Step_ Part-2_ 720p_HD
มุมมอง 782 ชั่วโมงที่ผ่านมา
Casting of Slab Steel Reinforcement in Progress_ Step by Step_ Part-2_ 720p_HD #civilengeenring #construction #civiltech #civilengineering #civiltop #foryou #civil #inspiration #motivational #success @civilengineeringtechnology1
Casting of Slab Steel Reinforcement in Progress_ Step by Step_ Part-1_ 720p_HD
มุมมอง 747 ชั่วโมงที่ผ่านมา
Binding of Slab Slab Steel Reinforcement in Progress_ Part-1_720p_HD..... #civilengeenring #construction #civiltech #civilengineering #civiltop #foryou #civil #inspiration #motivational #success @civilengineeringtechnology1
Beam Steel Casting_Bottom & Top Bars_Extra Bars(L/3,L4)_Stirrups Spacing(4",6")_Column BeamJunction!
มุมมอง 2412 ชั่วโมงที่ผ่านมา
Beam Steel Casting_Bottom & Top Bars_Extra Bars(L/3,L4)_Stirrups Spacing(4",6")_Column BeamJunction : In this video I am going to show Casting of Beam Steel, 1) Bottom Bars 2) Top Bars 3) Extra Bars (L/3,L4) 4) Stirrups Spacing (4",6") 5) Column Beam Junction 6) Beam Size (15"×21") 7) Bars Overlapping (47") 8) Confining Bars use for Column Beam Junction 9) Spacers/Cover Blocks 10) Beam Levellin...
Concreting by Tour lift (1:1.5:3) _ First Floor
มุมมอง 67816 ชั่วโมงที่ผ่านมา
Concreting by Tour lift (1:1.5:3) _ First Floor
Column Pouring || Levelling || Lining || compacting !!!!!
มุมมอง 32419 ชั่วโมงที่ผ่านมา
Column Pouring || Levelling || Lining || compacting !!!!!
Slab Steel check List|| Electric work Check List ||Main Bars, Distribution Bars,Extra Bars (L/3,L/4)
มุมมอง 12021 ชั่วโมงที่ผ่านมา
Slab Steel check List|| Electric work Check List ||Main Bars, Distribution Bars,Extra Bars (L/3,L/4)
G-Floor Slab Reinforcement || Bottom bars(B1,B2)|| Extra Bars (L3,L/4) || Electrical Work ||CAT-IIIA
มุมมอง 104วันที่ผ่านมา
G-Floor Slab Reinforcement || Bottom bars(B1,B2)|| Extra Bars (L3,L/4) || Electrical Work ||CAT-IIIA
Full Construction Site View || Top View
มุมมอง 20วันที่ผ่านมา
Full Construction Site View || Top View
Floor Beam(L/3, L/4) in Progress|| Top Bars, Bottom & Extra Bars, Stirrups, Hook, Confining
มุมมอง 2914 วันที่ผ่านมา
Floor Beam(L/3, L/4) in Progress|| Top Bars, Bottom & Extra Bars, Stirrups, Hook, Confining
Making of 2 Ties/Rings with One Bar for Column !!!!
มุมมอง 36214 วันที่ผ่านมา
Making of 2 Ties/Rings with One Bar for Column !!!!
Checking of Floor Beam before Downing of Beam || Civil Engineering Technology.
มุมมอง 34หลายเดือนก่อน
Checking of Floor Beam before Downing of Beam || Civil Engineering Technology.
Casting of Floor Beam || Top Bars, Bottom Bars, Extra Bars, Stirrups and Confining Bars..
มุมมอง 44หลายเดือนก่อน
Casting of Floor Beam || Top Bars, Bottom Bars, Extra Bars, Stirrups and Confining Bars..
Full Construction Process of Column || What will be Checking During Construction ????
มุมมอง 23หลายเดือนก่อน
Full Construction Process of Column || What will be Checking During Construction ????
How to make Ties|| Rings from one Bar|| دو رنگ||ٹائز ایک ساتھ کیسے بنانا ہے ؟؟؟؟؟؟؟؟
มุมมอง 44หลายเดือนก่อน
How to make Ties|| Rings from one Bar|| دو رنگ||ٹائز ایک ساتھ کیسے بنانا ہے ؟؟؟؟؟؟؟؟
Shuttering work for Beam and slab Monolithically|| Cold Area.
มุมมอง 30หลายเดือนก่อน
Shuttering work for Beam and slab Monolithically|| Cold Area.
NHA SPECIFICATIONS || ROAD STRUCTURE _Sub Grade_Sube Base _Base Course _Wearing Surface_ Tack Coat.
มุมมอง 50หลายเดือนก่อน
NHA SPECIFICATIONS || ROAD STRUCTURE _Sub Grade_Sube Base _Base Course _Wearing Surface_ Tack Coat.
ARE YOU FRESH SITE ENGINEER ?||WHAT SHOULD BE LEARN WHEN YOU WORK IN PRIVATE SECTOR OR GOVT SECTOR ?
มุมมอง 182 หลายเดือนก่อน
ARE YOU FRESH SITE ENGINEER ?||WHAT SHOULD BE LEARN WHEN YOU WORK IN PRIVATE SECTOR OR GOVT SECTOR ?
Full Process of Concreting in cold Area || Explanation with Specifications || Which admixture used ?
มุมมอง 445 หลายเดือนก่อน
Full Process of Concreting in cold Area || Explanation with Specifications || Which admixture used ?
Concreting in Cold Area | Specifications
มุมมอง 445 หลายเดือนก่อน
Concreting in Cold Area | Specifications
RCC Retaining wall BBS Preparation of Excel Sheet || Underground Water Tank (21× 18) ||Part-3
มุมมอง 1228 หลายเดือนก่อน
RCC Retaining wall BBS Preparation of Excel Sheet || Underground Water Tank (21× 18) ||Part-3
RCC Retaining wall BBS Preparation of Excel Sheet | Underground Water Tank (21× 18)|full Course_720p
มุมมอง 808 หลายเดือนก่อน
RCC Retaining wall BBS Preparation of Excel Sheet | Underground Water Tank (21× 18)|full Course_720p
Footing BBS Preparation of Excel Sheet | Underground Water Tank (21× 18) |full complete course _720p
มุมมอง 968 หลายเดือนก่อน
Footing BBS Preparation of Excel Sheet | Underground Water Tank (21× 18) |full complete course _720p
Sub Engineer Civil full Solved last Past Paper (Repeated) MCQs_ETEA_Building Construction_(720P_HD)
มุมมอง 779 หลายเดือนก่อน
Sub Engineer Civil full Solved last Past Paper (Repeated) MCQs_ETEA_Building Construction_(720P_HD)
Sub Engineer Civil full Solved last Past Paper (Repeated) MCQs _ ETEA _Building Material _ (720P_HD)
มุมมอง 1059 หลายเดือนก่อน
Sub Engineer Civil full Solved last Past Paper (Repeated) MCQs _ ETEA _Building Material _ (720P_HD)
Sub Engineer Civil full Solved last Past Paper MCQs _ETEA _ LCB Department || (720P_HD)
มุมมอง 849 หลายเดือนก่อน
Sub Engineer Civil full Solved last Past Paper MCQs _ETEA _ LCB Department || (720P_HD)
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and Answer Part- 4_ HD_720p
มุมมอง 13310 หลายเดือนก่อน
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and Answer Part- 4_ HD_720p
Civil Site Engineer | QA/QC\rEngineer/ Inspector_ Interview Questions and Answer Part- 3_ HD_720p
มุมมอง 13210 หลายเดือนก่อน
Civil Site Engineer | QA/QC\rEngineer/ Inspector_ Interview Questions and Answer Part- 3_ HD_720p
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and answer Part 2_ HD_720p.
มุมมอง 15410 หลายเดือนก่อน
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and answer Part 2_ HD_720p.
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and Answer Part 1_ HD_720p.
มุมมอง 45910 หลายเดือนก่อน
Civil Site Engineer | QA/QC\rEngineer/ Inspector\r_ Interview Questions and Answer Part 1_ HD_720p.

ความคิดเห็น

  • @riezan
    @riezan 5 วันที่ผ่านมา

    Brother, what's is best practice for the size of concrete tie beam for 1 story house with concrete roof deck ?

    • @civilengineeringtechnology1
      @civilengineeringtechnology1 4 วันที่ผ่านมา

      The best practices, Size of aggregate should be down 3/4" and 1/2" sieves .

    • @riezan
      @riezan 4 วันที่ผ่านมา

      @@civilengineeringtechnology1 TQ

  • @shuwebmohamed
    @shuwebmohamed 22 วันที่ผ่านมา

    Wooooow construction amazing

  • @shuwebmohamed
    @shuwebmohamed 23 วันที่ผ่านมา

    ❤❤❤

  • @yallappahanaji3522
    @yallappahanaji3522 24 วันที่ผ่านมา

    heavy construction

  • @ChungThanh-xp5df
    @ChungThanh-xp5df 26 วันที่ผ่านมา

    Sắt thép ghê quá

  • @rifaqatali9578
    @rifaqatali9578 หลายเดือนก่อน

    Appreciated

  • @user-sm2et2nc2r
    @user-sm2et2nc2r หลายเดือนก่อน

    this video are very important for me i am watching again and again....

  • @user-hv9wn7jm9v
    @user-hv9wn7jm9v หลายเดือนก่อน

    are you working in NHA department ?????

  • @Hassangee-mf6zg
    @Hassangee-mf6zg หลายเดือนก่อน

    this video prepared me for interview and for site work

  • @user-nz7qh8kw4k
    @user-nz7qh8kw4k 3 หลายเดือนก่อน

    Ao Chawla ase batate hn papers ko

  • @user-hv9wn7jm9v
    @user-hv9wn7jm9v 4 หลายเดือนก่อน

    amazing video and iformation viedo

  • @GOING_THROUGH_TOUGHEST_STAGE24
    @GOING_THROUGH_TOUGHEST_STAGE24 4 หลายเดือนก่อน

    🙏🏻🥰😌 _HELLO_ 1)MY ITI DRAUGHTSMAN CIVIL COURSE KARA HU,2 YEARS KA & *AUTOCAD* COMPLETE HOGAYA H 2)TOH ABHI KYA KARU *DIPLOMA IN CIVIL ENGINEERING* KARNE K LIYE APPLY KIYA H TOH USS K SATH SOFTWARES SIKHU JAISE *REVIT ARCHITECTURE 3DS MAXX* ETC...., 3)YAA PHIR LAND SURVEYING KA KAAM SIKHU GULF MAY KIS CHEZ PAR ZYADA SCOPE H ABHI MY TOO YOUNG HU NA TOH AP MERI SONCHNE MAY HELP KARIYE 4)AS OF NOW AGE 22 H. 5) _DESTINATION_ :- *GULF/ABROAD JANA HAI* *JOB K LIYE* 6)FULLY CONFUSED 🤔 HOGAYA HU PLEASE APNE EXPERIENCE SHARE KARE HELP KARE. _APKA CHOTA BHAI_🥰🥲🙏🏻🤗🤜🤛 AP K REPLY K LIYE WAIT KAR RAHA HOON 🙌❤️ ~THANK U~❤❤.

  • @user-of1ws3gg9e
    @user-of1ws3gg9e 5 หลายเดือนก่อน

    so interesting video

  • @user-xc2vv6vz2j
    @user-xc2vv6vz2j 5 หลายเดือนก่อน

    great job

  • @KiKi-pn7is
    @KiKi-pn7is 5 หลายเดือนก่อน

    👍👍👍👍👍👍👍

  • @KiKi-pn7is
    @KiKi-pn7is 5 หลายเดือนก่อน

    👍👍👍👍👍👍👍👍

  • @user-mo9zf5ys1v
    @user-mo9zf5ys1v 5 หลายเดือนก่อน

    very interesting video

  • @user-xc2vv6vz2j
    @user-xc2vv6vz2j 5 หลายเดือนก่อน

    good work

  • @kifkhattak
    @kifkhattak 5 หลายเดือนก่อน

    zabardast work

  • @user-sm2et2nc2r
    @user-sm2et2nc2r 5 หลายเดือนก่อน

    i am watching daily this because these are very important

  • @user-of1ws3gg9e
    @user-of1ws3gg9e 5 หลายเดือนก่อน

    good job

  • @user-sm2et2nc2r
    @user-sm2et2nc2r 5 หลายเดือนก่อน

    please share with us all sub engineer past papers

  • @user-of1ws3gg9e
    @user-of1ws3gg9e 5 หลายเดือนก่อน

    your teaching method is very good

  • @user-sm2et2nc2r
    @user-sm2et2nc2r 5 หลายเดือนก่อน

    i really apreciate it

  • @user-sm2et2nc2r
    @user-sm2et2nc2r 5 หลายเดือนก่อน

    we are waiting the next video

  • @user-sm2et2nc2r
    @user-sm2et2nc2r 5 หลายเดือนก่อน

    good job

  • @user-uq9dh9zf8d
    @user-uq9dh9zf8d 5 หลายเดือนก่อน

    demiri orjinal 🐛yapi 💩🔩🔩🔩🔩

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 5 หลายเดือนก่อน

    this video is very important and i am watching daily

  • @user-mo9zf5ys1v
    @user-mo9zf5ys1v 5 หลายเดือนก่อน

    good job

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 5 หลายเดือนก่อน

    this is difficult work to do layout

  • @user-mo9zf5ys1v
    @user-mo9zf5ys1v 5 หลายเดือนก่อน

    good job

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 5 หลายเดือนก่อน

    Informative video

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 5 หลายเดือนก่อน

    Amazing Work

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    this is very important for every civil engineer so thanks Sir

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    good job

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    share with us all sub engineer solved past papers

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    good job

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    sir share all type of mcqs that is come by ETEA

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    this is very helpful for us

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    good job

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    appreciate Sir

  • @carlosrenerodriguezgodoy1060
    @carlosrenerodriguezgodoy1060 6 หลายเดือนก่อน

    ❤👍👍💪💪

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    so i ask a question is this retaining wall

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    thi8s work very important for every site engineer

  • @user-vj7bi3de7u
    @user-vj7bi3de7u 6 หลายเดือนก่อน

    goood work

  • @andrewdavid520
    @andrewdavid520 6 หลายเดือนก่อน

    Wrong rotations of links/stirrups. 2nd: no links in the beams / columns joints.... Bad.....

  • @drumswest5035
    @drumswest5035 7 หลายเดือนก่อน

    Brutal...

  • @Hassangee-mf6zg
    @Hassangee-mf6zg 8 หลายเดือนก่อน

    sir waiting for part 4...

  • @user-hk1qq4rc8q
    @user-hk1qq4rc8q 8 หลายเดือนก่อน

    these interview questions are very important for me . thanks

  • @user-lr6os9kh5x
    @user-lr6os9kh5x 8 หลายเดือนก่อน

    good job