PSPCL Line to LT panel Installation.
PSPCL Line to LT Panel Installation Description
The installation of the PSPCL (Punjab State Power Corporation Limited) line to the LT (Low Tension) panel involves several critical steps to ensure safe and efficient power distribution.
Site Assessment: The installation begins with a thorough site assessment to determine the optimal location for the LT panel, considering factors such as accessibility, load requirements, and safety standards.
Material Preparation: Necessary materials, including cables, connectors, circuit breakers, and the LT panel itself, are gathered. Components are selected based on the expected load and compliance with PSPCL specifications.
Cable Laying: High-quality cables are laid from the PSPCL supply point to the LT panel. This involves trenching for underground cables or overhead installation, ensuring proper insulation and protection against environmental factors.
Panel Setup: The LT panel is installed at the designated location, securely mounted to prevent vibrations and ensure stability. It includes necessary safety features, such as circuit breakers and fuses.
Connections: Electrical connections are made between the incoming supply and the LT panel, ensuring proper phase alignment. Grounding systems are also installed to enhance safety.
Testing and Commissioning: Once installation is complete, comprehensive testing is conducted to verify the integrity of connections and the functionality of the panel. This includes checking for voltage, load capacity, and any potential short circuits.
Documentation and Compliance: All installation processes are documented, and compliance with PSPCL regulations is ensured. Final inspection by authorized personnel may be required before the system goes live.
Training and Handover: Finally, operational training for relevant personnel is provided, ensuring they understand panel operations, safety protocols, and maintenance requirements.
This systematic approach ensures a reliable and safe power distribution system, facilitating smooth operations for the end-users.
Star Delta Video - th-cam.com/video/2eOsi00ITHk/w-d-xo.htmlsi=JUpFF0W2-j86e9A-
มุมมอง: 55

วีดีโอ

How to fitting busbar servo Bypass with Automatic transfer switch to the connection in this video.
มุมมอง 4462 หลายเดือนก่อน
How To connection servo bypaas changeover switch ke connection kese karte hain About This Video : Hello dosto aaj ham aap logo ko servo bypaas changeover switch with Automatic transfer switch ke connection kis tarah karte hain ye batayenge dosto aap logo ko video pasand aayegi video pasand aaye to video ko like and share kare aur mere youtube channel ko subscribe kare 🙏 Servo bypaas changeover ...
Eplan some special command.
มุมมอง 1883 หลายเดือนก่อน
EPLAN is a powerful engineering software used for designing, documenting, and managing electrical, fluid power, and instrumentation projects. One of its special commands is "Smart Wiring," which automates the creation of wire connections based on predefined rules, saving time and reducing errors in wiring diagrams. This feature streamlines the process of generating wiring documentation, ensurin...
"Genset Testing in Progress|| Ensuring Power Reliability"
มุมมอง 695 หลายเดือนก่อน
Currently, the process of Genset testing is underway. This involves assessing the performance, functionality, and reliability of a generator set (genset) under various conditions. Technicians may be conducting load tests, checking for voltage stability, examining fuel efficiency, and ensuring all safety protocols are met. Genset testing is crucial to guaranteeing the readiness and effectiveness...
Main Incomer,DG Incomer, Servo By-pass &ATS switch in a panel.
มุมมอง 2306 หลายเดือนก่อน
Main Incomer: The main incomer in an electrical panel refers to the primary power source feeding into the panel from the utility grid or another external power source. It is typically a circuit breaker or a switch that controls the flow of electricity into the panel. The main incomer is responsible for supplying power to all the circuits connected to the panel. DG Incomer: The DG (Diesel Genera...
DG Bypass Panel 250KVA DG Set
มุมมอง 1636 หลายเดือนก่อน
DG Bypass Panel 250KVA DG Set
Fire fighting panel,| Main Pump motor and Jockey Pump with Diesel engine ||
มุมมอง 436 หลายเดือนก่อน
Fire fighting panel,| Main Pump motor and Jockey Pump with Diesel engine || #Firefightingpanel #Electricalfighting
#CRCA Sheet pe Jay Shri Ram ka Naam🙏
มุมมอง 5538 หลายเดือนก่อน
#Jayshriram
Maintenance of DG and electrical panel is going on Setting parameters of ammeter and voltmeter.
มุมมอง 469 หลายเดือนก่อน
Maintenance of DG and electrical panel is going on Setting parameters of ammeter and voltmeter.
Synchronisation panel"Practical video of PLC Wiring"
มุมมอง 3759 หลายเดือนก่อน
Synchronisation panel"Practical video of PLC Wiring"
How to ACB Current checking at site||
มุมมอง 4510 หลายเดือนก่อน
How to ACB Current checking at site||
Clamp meters measuring current without connection to a circuit in series||
มุมมอง 2610 หลายเดือนก่อน
Clamp meters measuring current without connection to a circuit in series||
Electrical Panels' Checking power Quantity and Energy Analyzer||
มุมมอง 1910 หลายเดือนก่อน
Electrical Panels' Checking power Quantity and Energy Analyzer||
Strip mill during problem in looper how strip is behind during this problem||
มุมมอง 8111 หลายเดือนก่อน
Strip mill during problem in looper how strip is behind during this problem||
How to Strip mills running in industries
มุมมอง 15611 หลายเดือนก่อน
How to Strip mills running in industries
Why we used capacitor panel in industries
มุมมอง 41411 หลายเดือนก่อน
Why we used capacitor panel in industries
MCCB WIRING WITH CONTACTOR ||
มุมมอง 5011 หลายเดือนก่อน
MCCB WIRING WITH CONTACTOR ||
Amf logic system (Auto main failure) panel.
มุมมอง 25311 หลายเดือนก่อน
Amf logic system (Auto main failure) panel.
Transformer of substation |||
มุมมอง 8911 หลายเดือนก่อน
Transformer of substation |||
Local push botton with R-dual Starter||
มุมมอง 4711 หลายเดือนก่อน
Local push botton with R-dual Starter||
Why We used VFD(Variable Frequency Device)||
มุมมอง 2811 หลายเดือนก่อน
Why We used VFD(Variable Frequency Device)||
Dol starter with MCB and contactor and over load relay selection.
มุมมอง 36511 หลายเดือนก่อน
Dol starter with MCB and contactor and over load relay selection.
ABB,ACB WITH FORMULA TYPE (FA1C)
มุมมอง 34111 หลายเดือนก่อน
ABB,ACB WITH FORMULA TYPE (FA1C)
Control Diagram of ACB with TNC AND Auto manual selector Switch||
มุมมอง 20611 หลายเดือนก่อน
Control Diagram of ACB with TNC AND Auto manual selector Switch||
Wiring Diagram of MFM 391,SELEC MAKE WITH RS 485 COMMUNICATION ||
มุมมอง 12411 หลายเดือนก่อน
Wiring Diagram of MFM 391,SELEC MAKE WITH RS 485 COMMUNICATION ||
Electrical panel testing three source and two buscoupler ||
มุมมอง 23011 หลายเดือนก่อน
Electrical panel testing three source and two buscoupler ||
"Powering Precision: Inside the Kirloskar Generator and Relay Synergy"
มุมมอง 65ปีที่แล้ว
"Powering Precision: Inside the Kirloskar Generator and Relay Synergy"
Change over switch with amf bypass panel ||
มุมมอง 137ปีที่แล้ว
Change over switch with amf bypass panel ||
AC LT Panels in Electrical Systems"practical video PART-2
มุมมอง 111ปีที่แล้ว
AC LT Panels in Electrical Systems"practical video PART-2
AC LT Panels in Electrical Systems"PART-1
มุมมอง 78ปีที่แล้ว
AC LT Panels in Electrical Systems"PART-1