Morrison-Maierle
Morrison-Maierle
  • 42
  • 377 030
Morrison-Maierle Bend Office Summer Teambuilding Event at Mt. Bachelor
Our Bend office employee-owners know how to have fun! This year's summer social office event took place at nearby Mt. Bachelor. Highly suggested by the staff, the Ziptour was a great way to connect with their team outside of the office. Thanks to the following employee-owners for joining in on the fun: Maille Ryan, Brenna Jones, Brian Cormier, Eric Webber, Reed Newcomer, Nate Boland, Eric Heidebrecht, William Mansfield (our summer intern in Bend), Thomas Denison, Ben Watson, and Gwen Solberg.
มุมมอง: 20

วีดีโอ

Mystic Hydropower Dam Gate Intake project
มุมมอง 543 หลายเดือนก่อน
Morrison-Maierle provided an engineering design and construction strategy to replace the intake gate at the Mystic Lake hydroelectric project at the remote Rowe Dam in the Beartooth Mountains.
Scheels Aim High project Morrison-Maierle engineering
มุมมอง 183 หลายเดือนก่อน
With the ribbon cutting behind us, we want to send congratulations to the entire team who made the Scheels Aim High Big Sky Aquatic and Recreation Center come to life. A special thanks to the City of Great Falls, Scheels, Malmstrom Air Force Base, our engineers, and the team of architects and contractors. Our goal is to help "Build Better Communities," and this project certainly helps do that!
Mercer Mass Timber tour
มุมมอง 355 หลายเดือนก่อน
Mercer Mass Timber generously hosted our team of engineers and architects on a tour of their facility where they manufacture CLT panels.
Nez Perce Clearwater Forest Supervisors Office - a mass timber project in beautiful Kamiah, Idaho
มุมมอง 456 หลายเดือนก่อน
Using cross-laminated timber (CLT) and glue-laminated timber (glulam), Morrison-Maierle provided the structural, mechanical, electrical, and ICT engineering design for the U.S. Forest Service's 16,000 sq.ft. office building in Kamiah, Idaho.
Billings Logan Airport Terminal Opening
มุมมอง 2222 ปีที่แล้ว
The Billings-Logan International Airport unveiled its new terminal expansion project, and Morrison-Maierle's team of airport engineers and planners were on hand to help celebrate this amazing accomplishment. Congratulations to the City of Billings and all our partners who helped make this project happen!
Redmond Oregon Airport Snow Removal Building
มุมมอง 1912 ปีที่แล้ว
The Redmond, Oregon Airport recently unveiled their new SRE building. Take a look at the project!
When You Choose Morrison-Maierle
มุมมอง 126K2 ปีที่แล้ว
This is why we work at Morrison-Maierle, and why clients choose to work with us. Hear from several of our employee-owners about what you can expect when you hire us or join our firm.
2020 Cowley Tank Demolition
มุมมอง 43K3 ปีที่แล้ว
After installing the new 500,000-gallon elevated steel tank in Cowley, WY, the team demolished and removed the old 200,000-gallon elevated steel tank. The whole process took about 24 hours but the former tank dropped in 35 minutes. This process was successful due to the cooperation of all parties involved... contractors, sub-contractors, town, funding agencies, and engineers!
Flower Creek Dam
มุมมอง 5693 ปีที่แล้ว
Morrison-Maierle and Rizzo International designed a new Flower Creek Dam for the City of Libby, Montana's water supply.
America's Water Infrastructure Act (AWIA) webinar - Morrison-Maierle
มุมมอง 1403 ปีที่แล้ว
The America’s Water Infrastructure Act (AWIA) was signed into law in 2018. This act requires water system managers and operators to prepare planning and assessment documents for a range of operational and risk response measures. For water systems that serve between 3,300 to 50,000 the deadline for the Risk and Resilience Assessment is June 2021. Join this webinar to learn more about the AWIA an...
Cost Effective Repairs with Trenchless Sewer Lining
มุมมอง 2223 ปีที่แล้ว
Many communities have aging underground utilities that present the risk of failures that could cause costly repairs and service outages. Budgeting to replace these utilities promptly can be challenging as full replacement options include open cut trenching and costly street surface restoration. One option to reduce the cost of a full sewer replacement is trenchless lining. This method involves ...
Cost Effective Repairs with Trenchless Sewer Linings
มุมมอง 283 ปีที่แล้ว
Many communities have aging underground utilities that present the risk of failures that could cause costly repairs and outages. This webinar will provide information about trenchless sewer lining, which can be approximately 60-70% the cost of open cut replacement methods and takes roughly 1/3 of the time vs open cut.
Staying Compliant with Stormwater Discharge Permitting
มุมมอง 943 ปีที่แล้ว
There is an increasing focus in cities and upon contractors to responsibly manage stormwater discharge from construction sites. This has resulted in additional permitting requirements and concerns with water quality. Learn to stay compliant with your permit and protect our state surface waters with Best Management Practices (BMP).
Morrison Maierle 75th Anniversary - Columbia Falls Chamber
มุมมอง 553 ปีที่แล้ว
In 1945, John Morrison and Joe Maierle started their engineering company out of John's home in Helena, Montana. Now, 75 years later, we celebrate this milestone having grown into a company employing 300 people across 12 offices in four states.
MT-81 Bridges Project - Judith River Bridge Slide
มุมมอง 4764 ปีที่แล้ว
MT-81 Bridges Project - Judith River Bridge Slide
Kalispell School District - Ag Ed Addition
มุมมอง 2324 ปีที่แล้ว
Kalispell School District - Ag Ed Addition
Reviving the Heart of a Collection System Reserve Street Lift Station
มุมมอง 454 ปีที่แล้ว
Reviving the Heart of a Collection System Reserve Street Lift Station
Dialing in a Membrane Bioreactor for Nutrient Removal
มุมมอง 1404 ปีที่แล้ว
Dialing in a Membrane Bioreactor for Nutrient Removal
The First Class A 1 Effluent Reuse Permit in Montana
มุมมอง 694 ปีที่แล้ว
The First Class A 1 Effluent Reuse Permit in Montana
2018 Montana ASCE Report Card
มุมมอง 194 ปีที่แล้ว
2018 Montana ASCE Report Card
Morrison-Maierle Elfgineers
มุมมอง 694 ปีที่แล้ว
Morrison-Maierle Elfgineers
Fire Suppression System Test BZN Hangar Project 1
มุมมอง 825 ปีที่แล้ว
Fire Suppression System Test BZN Hangar Project 1
Bert Mooney Airport Terminal
มุมมอง 285 ปีที่แล้ว
Bert Mooney Airport Terminal
Interstate 90 Bridge Projects Our Work in Progress
มุมมอง 275 ปีที่แล้ว
Interstate 90 Bridge Projects Our Work in Progress
Rankin Elementary Almost Ready
มุมมอง 375 ปีที่แล้ว
Rankin Elementary Almost Ready
Morrison Maierle Buildings Market Group
มุมมอง 835 ปีที่แล้ว
Morrison Maierle Buildings Market Group
Rocky Mountain Emergency Services Training Center
มุมมอง 1305 ปีที่แล้ว
Rocky Mountain Emergency Services Training Center
North Sheridan Interchange Projects
มุมมอง 5086 ปีที่แล้ว
North Sheridan Interchange Projects
Rankin is Ready!
มุมมอง 1666 ปีที่แล้ว
Rankin is Ready!

ความคิดเห็น