Tutorial FIDIC Contract Management | TECHNICAL QUERY | FIDIC Silver Book turnkey EPC
This tutorial explains Technical Queries in relation to sub-clause 5.1 design in the FIDIC Silver Book engineering, procurement & construction (EPC) contract.
For FIDIC Contract Training & Contract Management Services visit: Aratis at aratis.nl/en/
For FIDIC Contract Management System visit: Aryo Systems at aryosystems.com/cms/
For FIDIC Standard Contracts - General Conditions visit: FIDIC International Federation of Consulting Engineers fidic.org
In this video we will explain how to prepare and process Technical Queries in a Silver Book EPC Contract.
The Silver Book contract is used for turnkey and engineering, procurement and construction contracts which can be priced on a fixed lump sum basis or can be a combination of fixed prices and unit prices.
In this session we are going to talk about the use of technical queries in relation to sub-clause 5.1 regarding the design obligations of the contractor.
Normally technical queries are issue by the Contractor in relation to the technical documents included Employer Requirements. Pay special attention to technical deviation requests.
Both parties shall comply with the agreement and design provisions because unresolved issues can lead to delays, disputes and possible arbitration.
Every contract should have Administration Requirements which include the forms to be used, reports to be made and work flowcharts which explain the process steps to take.
In the first step the contractor shall prepare and issue Technical Query Part A including the related documentation.
The Employer Representative shall review the technical query and obtain the answer from the relevant discipline engineer. The answer shall be stated on PART B and sent to the Contractor within the time limits.
If the TQ answer requires further clarification, then the Contractor shall resubmit the TQ with an updated higher revision number.
If the Contractor believes that the TQ answer constitutes a Variation, then the Contractor shall prepare and submit a Variation Proposal. If the Employer does not agree then the Contractor can decide to prepare and submit a Notice of Claim.
The Employer Representative shall review and process any Variation Proposal and/or Notice of Claim in accordance with the relevant contractual provisions.
It is recommended to use standard forms for the technical query provisions because this ensures that all required data and information is included. Ensure that forms are fully completed and are signed by a dully authorised personnel.
The technical query form PART A shall be prepared by the Contractor Representative.
The technical query form PART B shall be prepared by the relevant discipline engineer and shall be signed by the Employer Representative.
It is important to understand that Notices can be send by means of a form or a letter. In all cases the word “notice” shall be clearly stated on the form or letter as well as reference to the relevant sub-clause or clauses of the general conditions and/or particular conditions. Furthermore, notices shall be signed by duly authorised personnel which have been given delegated authority in accordance with the contract.
The administration requirements shall specify what the reporting requirements and frequency of reporting are. Normally a Technical Query register is prepared which shall clearly show the status of the technical queries. The report can be submitted in various formats or can be generated by the applicable Contract Management System.
The administration requirements shall also specify technical meetings which shall be held on a regular basis between the parties in order to discuss, clarify, negotiate and agree the technical issues. If no resolution can be achieved, then the dispute resolution provisions of the contract shall be followed.
Thank you for watching, please like and subscribe. Also check the video description for available free downloads.
มุมมอง: 113

วีดีโอ

Tutorial FIDIC Contract Management | DETERMINATIONS | FIDIC Silver Book turnkey EPC
มุมมอง 120หลายเดือนก่อน
This tutorial explains sub-clause 3.5 provisions regarding agreements and determinations in the FIDIC Silver Book engineering, procurement & construction (EPC) contract. For FIDIC Contract Training & Contract Management Services visit: Aratis at aratis.nl/en/ For FIDIC Contract Management System visit: Aryo Systems at aryosystems.com/cms/ For FIDIC Standard Contracts - General Conditions visit:...
Tutorial FIDIC Contract Management | CLAIMS | FIDIC Yellow Book - Plant, Design & Build Contract
มุมมอง 74หลายเดือนก่อน
This tutorial explains Claims sub-clause 20 provisions in the FIDIC Yellow Book Plant, Design and Build contract. For FIDIC Contract Training & Contract Management Services visit: Aratis at aratis.nl/en/ For FIDIC Contract Management System visit: Aryo Systems at aryosystems.com/cms/ For FIDIC Standard Contracts - General Conditions visit: FIDIC International Federation of Consulting Engineers ...
Tutorial FIDIC Contract Management | CLAIMS | FIDIC Silver Book turnkey EPC
มุมมอง 132หลายเดือนก่อน
This tutorial explains Claims sub-clause 20 provisions in the FIDIC Silver Book engineering, procurement & construction (EPC) contract. For FIDIC Contract Training & Contract Management Services visit: Aratis at aratis.nl/en/ For FIDIC Contract Management System visit: Aryo Systems at aryosystems.com/cms/ For FIDIC Standard Contracts - General Conditions visit: FIDIC International Federation of...
Project Management: Fast Track Renewable Energy Projects with Time & Cost Saving FEED-EPCM Templates
มุมมอง 489 หลายเดือนก่อน
Develop renewably energy projects faster and save cost with FEED | EPCM strategy and templates. Pre-drafted templates for FEED services agreement and Engineering, Procurement and Construction Management contract. Using proven FIDIC standard contract models ensures a balanced risk allocation profile which is known in the EPC / EPCM market. Visit our website for free brochure which include implem...
Tutorial Scope of Work template | FIDIC Yellow Book Design & Build Contract
มุมมอง 658ปีที่แล้ว
This tutorial explains the Scope of Work template for a FIDIC Yellow Book engineering and construction contract. Save project management time and cost by using the pre-drafted templates which are based on best in class EPC contract management The use of standard contracts and pre-drafted template, forms and flowchart minimises risk of inconsistencies, errors or omissions between the various EPC...
Tutorial Scope of Work template FIDIC Silver Book turnkey engineering & construction contract
มุมมอง 1.5Kปีที่แล้ว
This tutorial explains the Scope of Work template for a FIDIC Silver Book engineering, procurement & construction (EPC) contract. Save project management time and cost by using the pre-drafted templates which are based on best in class EPC contract management The use of standard contracts and pre-drafted template, forms and flowchart minimises risk of inconsistencies, errors or omissions betwee...
Tutorial Contract Administration FIDIC Green Book | short form engineering & construction contract
มุมมอง 167ปีที่แล้ว
This tutorial explains the template, flowchart, and forms for management of a FIDIC Green Book short form engineering and construction contract. Save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates minimises risk of inconsistencies, errors or omissions between the var...
Tutorial Contract Administration FIDIC Silver Book | turnkey engineering & construction contract
มุมมอง 444ปีที่แล้ว
This tutorial explains the template, flowchart, and forms for management of a FIDIC Silver Book engineering, procurement & construction (EPC) contract. Save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates minimises risk of inconsistencies, errors or omissions between ...
Tutorial Contract Administration template for FIDIC Green Book | construction contract
มุมมอง 220ปีที่แล้ว
This tutorial explains the template, flowchart, and forms for management of a FIDIC Red Book construction contract. Save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates, forms and flowchart minimises risk of inconsistencies, errors or omissions between the various con...
Tutorial Contract Administration template for FIDIC Yellow Book | design & build contract
มุมมอง 193ปีที่แล้ว
This tutorial explains the template, flowchart, and forms for management of a FIDIC Yellow Book design and build contract. Save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates, forms and flowchart minimises risk of inconsistencies, errors or omissions between the vari...
Tutorial FIDIC Contract Management | VARIATIONS | FIDIC Silver Book turnkey EPC
มุมมอง 1.2K2 ปีที่แล้ว
This tutorial explains variation clause in the FIDIC Silver Book engineering, procurement & construction (EPC) contract. Minimise variations, save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates, forms and flowchart minimises risk of inconsistencies, errors or omissio...
Tutorial FIDIC Contract Management | INSTRUCTIONS | FIDIC Silver Book turnkey EPC
มุมมอง 1.5K2 ปีที่แล้ว
This tutorial explains instruction sub-clause in the FIDIC Silver Book engineering, procurement & construction (EPC) contract. Minimise variations, save project management time and cost by using the pre-drafted templates which are based on best in class contract management The use of standard contracts and pre-drafted templates, forms and flowchart minimises risk of inconsistencies, errors or o...