The Alarm Panel Recall Channel
The Alarm Panel Recall Channel
  • 19
  • 22 346

วีดีโอ

UL Devastating Liability Letter
มุมมอง 1.5K3 ปีที่แล้ว
UL describes their failure to test Fire Alarms
DSC Control Panel Test - Johnson Controls Letter - Zwirn's Response
มุมมอง 1.1K3 ปีที่แล้ว
Jeffrey Zwirn reviews and responds to the letter received from Johnson Controls / Tyco / DSC. This video demonstrates that the DSC Control Panel does not conform to UL 985 6th Edition and NFPA 72 Standards.
DSC Burn Test Video
มุมมอง 1.6K3 ปีที่แล้ว
Short demonstration and explanation of why these DSC fire alarms are dangerous and do not comply with UL and NFPA Standards. Do NOT install this equipment.
Vista Burn Demo
มุมมอง 3.4K4 ปีที่แล้ว
Burn Demonstration - commercial fire alarm and Data Bus Danger
Demonstration of “Data Bus Danger” Honeywell Commercial Fire Alarm 2 of 2
มุมมอง 3K4 ปีที่แล้ว
Demonstration of “Data Bus Danger” Honeywell Commercial Fire Alarm 2 of 2
Description of the “Data Bus Danger”-Honeywell Commercial Fire Alarm 1 of 2
มุมมอง 4004 ปีที่แล้ว
Description of the “Data Bus Danger”-Honeywell Commercial Fire Alarm 1 of 2
WARNING!! DMP control panels DO NOT COMPLY
มุมมอง 5634 ปีที่แล้ว
WARNING!! DMP control panels DO NOT COMPLY
UL Failures and Cover Up Exposed
มุมมอง 2884 ปีที่แล้ว
UL Failures and Cover Up Exposed
Burn Test on Honeywell Vista Fire Alarm
มุมมอง 1.2K4 ปีที่แล้ว
Burn Test on Honeywell Vista Fire Alarm
DMP XR150 INTRO
มุมมอง 3.2K5 ปีที่แล้ว
DMP XR150 INTRO
DMP XR150 FAILS
มุมมอง 3.2K5 ปีที่แล้ว
DMP XR150 FAILS
DMP XT-50 Fails
มุมมอง 8125 ปีที่แล้ว
DMP XT-50 Fails
DMP XR-20 Fails
มุมมอง 2785 ปีที่แล้ว
DMP XR-20 Fails
UL 1023 (Part 1): Fails
มุมมอง 1005 ปีที่แล้ว
UL 1023 (Part 1): Fails
UL 1023 (Part 2): Fails
มุมมอง 785 ปีที่แล้ว
UL 1023 (Part 2): Fails
UL 985: Fails
มุมมอง 1445 ปีที่แล้ว
UL 985: Fails
NFPA 72 (Part 2): Fails
มุมมอง 935 ปีที่แล้ว
NFPA 72 (Part 2): Fails
NFPA 72 (Part 1): Fails
มุมมอง 2175 ปีที่แล้ว
NFPA 72 (Part 1): Fails

ความคิดเห็น

  • @anthonypasculli6980
    @anthonypasculli6980 ปีที่แล้ว

    What’s the point of this?

  • @calebmorand4604
    @calebmorand4604 ปีที่แล้ว

    I have a question about the Vista series by Honeywell. On the newer Vista 21ip LTE panels, the built in cellular communicator and IP Communicator do not wire off the ECP terminals. Would this mean that a short, open, or ground fault on auxiliary power or the ECP wires will not effect the communicators built-in on the 21 IP LTE board? Thanks!

  • @mygoogleemail2063
    @mygoogleemail2063 2 ปีที่แล้ว

    We use isolated power supplies on the KP and LX busses. Problem solved.

  • @kCI251
    @kCI251 2 ปีที่แล้ว

    Every control panel when shorted will have a failure to function of some sort.

  • @greatmusicgoodfeel826
    @greatmusicgoodfeel826 3 ปีที่แล้ว

    DMP or LENEL , lets say all true high security systems need Isolators like the Fire industry uses. Total ULC in Canada should be or in the future you will see happen .

    • @CK-ne9um
      @CK-ne9um 3 ปีที่แล้ว

      Honeywell and Napco too. A flathead and a staple essentially can take down a system if you have access to a disarmed keypad.

  • @greatmusicgoodfeel826
    @greatmusicgoodfeel826 3 ปีที่แล้ว

    To easy, I went into the Fire industry for 2 years installing and inspecting many buildings. Isolators are needed in the Security field. Say with the DMP or any bus device if not electricity protected with 1~ with a circuit breaker like an isolator, With a TRUE class A circut , The bus is shut down. DSC NEO has isolator options only issue only 16 can be used. Better then nothing . And yes that is on a class A circut . For the new guys a class A curcut is 2x wires out and return 2 wires in. Both sides can function independently. If a wiring issue arrises with one device , The ISOLATOR (like a breaker) kicks out and your other devices that are addressable report back to the side opposite the breaker. Hope this makes sense. All the years in security , all systems are not realy using ISOLATORS even the monster LENEL systems .

  • @Pbell
    @Pbell 4 ปีที่แล้ว

    Btw I have worked on panels that had the OVC light lit and the system was just operating headless. CS was getting troubles and alarms but customer wasn’t able to access the system