Civil Positive
Civil Positive
  • 114
  • 828 630
Pradhanmantri Sangrahalaya 2024, New Delhi _ प्रधानमंत्री संग्रहालय , | Museum
Pradhanmantri Sangrahalaya 2024, New Delhi _ प्रधानमंत्री संग्रहालय ,
#CivilPositive
#Pradhanmantri Sangrahalaya 2024, New Delhi _ प्रधानमंत्री संग्रहालय ,
#HOW TO REACH
Pradhanmantri Sangrahalaya,
Teen Murti Marg,
New Delhi 110011
#Museum Hours
10:00 AM to 6:00 PM
#Light and Sound Show
Show 1 - Hindi - 7:30 PM to 8:00 PM
Show 2 - English - 8:15 PM to 8:45 PM
Closed on Mondays and Gazetted Holidays
Google Map Location:-
Link:- maps.app.goo.gl/Too1f43QUbyaj63F9
By Metro
The nearest station is Lok Kalyan Marg Metro Station, serviced by Yellow Line - a 1.8 km walk to Pradhanmantri Sangrahalaya.
By Bus
Teen Murti is the nearest bus stand to PM Sangrahalaya. The buses that operate on this route are 604, 620, 630, 632, 680, 720, 783, 890.
Inspiration
The Pradhanmantri Sangrahalaya is a tribute to every Prime Minister of India since Independence, and a narrative record of how each one has contributed to the development of our nation over the last 75 years. It is a history of collective effort, and powerful evidence of the creative success of India’s democracy. Our Prime Ministers came from every class and tier of society, for the gates of democracy were equally open to all. Each one left an important footprint on the journey of development, social harmony and economic empowerment that has enabled India to give true meaning to freedom. We inherited an impoverished land from the debris of British colonialism, and together gave it a new life, lifting our country from famished deprivation to food-surplus status, and creating infrastructure over barren territory for the benefit of the people.
The Teen Murti Estate, home to India’s first Prime Minister Shri Jawaharlal Nehru for 16 years, was the natural environment for Pradhanmantri Sangrahalaya, because this is a story of continuity.
The Sangrahalaya is a seamless blend which begins at the renovated and refurbished Nehru Museum building, now completely updated and technologically advanced displays on the life and contribution of Shri Jawaharlal Nehru. The new panorama includes a section which exhibits a large number of rare gifts received by him from all over the world but never put on display.
The saga of modern India starts with the freedom struggle and the making of a great Constitution. The Sangrahalaya goes on to tell the story of how our Prime Ministers navigated the nation through various challenges and ensured the all-round progress of the country. Within this story is a message for the younger generation: there are greater horizons to conquer as we transform India into New India.
प्रेरणा
प्रधानमंत्री संग्रहालय स्वतंत्रता के बाद से भारत के प्रत्येक प्रधानमंत्री को श्रद्धांजलि है और यह इस बात का वर्णन है कि पिछले 75 वर्षों में प्रत्येक प्रधानमंत्री ने हमारे राष्ट्र के विकास में कैसे योगदान दिया है। यह सामूहिक प्रयास का इतिहास है और भारत के लोकतंत्र की रचनात्मक सफलता का शक्तिशाली प्रमाण है। हमारे प्रधानमंत्री समाज के हर वर्ग और स्तर से आए थे, क्योंकि लोकतंत्र के द्वार सभी के लिए समान रूप से खुले थे। प्रत्येक ने विकास, सामाजिक सद्भाव और आर्थिक सशक्तिकरण की यात्रा पर एक महत्वपूर्ण पदचिह्न छोड़ा है, जिसने भारत को स्वतंत्रता को सही अर्थ देने में सक्षम बनाया है। हमें ब्रिटिश उपनिवेशवाद के मलबे से एक दरिद्र भूमि विरासत में मिली थी और हमने मिलकर इसे एक नया जीवन दिया, अपने देश को भुखमरी से खाद्य-अतिरिक्त स्थिति में उठाया और लोगों के लाभ के लिए बंजर भूमि पर बुनियादी ढांचे का निर्माण किया।
तीन मूर्ति एस्टेट, भारत के पहले प्रधान मंत्री श्री जवाहरलाल नेहरू का 16 वर्षों तक घर
संग्रहालय एक सहज मिश्रण है जो पुनर्निर्मित और नवीनीकृत नेहरू संग्रहालय भवन से शुरू होता है, जो अब पूरी तरह से अद्यतन और तकनीकी रूप से उन्नत है, जिसमें श्री जवाहरलाल नेहरू के जीवन और योगदान पर प्रदर्शनियाँ हैं।
प्रधानमंत्री सरकार का मुखिया और मंत्रिपरिषद का नेता होता है। वह संघ सरकार की कार्यकारी शाखा का प्रमुख होता है। 1947 में भारत की आज़ादी के बाद से, देश के लिए काम करने के जुनून के साथ, महान क्षमता वाले व्यक्ति प्रधानमंत्री बने हैं। आइए उनके जीवन और राष्ट्र की सेवा में उनके काम पर एक नज़र डालें।
श्री नरेन्द्र मोदी
26 मई 2014 से अब तक
डॉ. मनमोहन सिंह
22 मई 2004 से 26 मई 2014 तक
श्री अटल बिहारी वाजपेयी
16 मई 1996 से 1 जून 1996 | 19 मार्च 1998 से 29 अप्रैल 1999 | 3 अक्टूबर 1999 से 10 मई 2004
श्री इंदर कुमार गुजराल
21 अप्रैल 1997 से 19 मार्च 1998 तक
श्री एच.डी. देवेगौड़ा
1 जून 1996 से 21 अप्रैल 1997 तक
श्री पीवी नरसिम्हा राव
21 जून 1991 से 16 मई 1996 तक
श्री चन्द्रशेखर
10 नवम्बर 1990 से 21 जून 1991 तक
श्री वी.पी. सिंह
2 दिसंबर 1989 से 10 नवंबर 1990 तक
श्री राजीव गांधी
31 अक्टूबर 1984 से 2 दिसंबर 1989 तक
चौधरी चरण सिंह
28 जुलाई 1979 से 14 जनवरी 1980 तक
श्री मोरारजी देसाई
24 मार्च 1977 से 28 जुलाई 1979 तक
श्रीमती इंदिरा गांधी
24 जनवरी 1966 से 24 मार्च 1977 | 14 जनवरी 1980 से 31 अक्टूबर 1984
श्री लाल बहादुर शास्त्री
9 जून, 1964 से 11 जनवरी, 1966 तक
श्री गुलजारीलाल नंदा
27 मई, 1964 से 9 जून, 1964 | 11 जनवरी, 1966 - 24 जनवरी, 1966
श्री जवाहरलाल नेहरू
15 अगस्त 1947 से 27 मई 1964 तक
#pradhanmantrimodi #pradhanmantrimodi
มุมมอง: 27

วีดีโอ

PM Modi to inaugurate India's longest cable-stayed bridge 'Sudarshan Setu' on Feb 25, 2024,
มุมมอง 3148 หลายเดือนก่อน
PM Modi to inaugurate India's longest cable-stayed bridge 'Sudarshan Setu' on Feb 25, 2024, Connecting Okha & BEYT-DWARKA, Gujarat Prime Minister #Narendra Modi will on February 25 dedicate to the nation, Sudarshan Setu, India's longest cable-stayed bridge connecting Okha mainland and Beyt Dwarka island. The inauguration will be done during his visit to Gujarat slated for February 24 and 25. Th...
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction | PART-3
มุมมอง 13111 หลายเดือนก่อน
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction | PART-3 Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4 Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka #signaturebridge #cablestayedbridge #Civilpositive Title : Construction of new 4 Lane Signature bridge with 900m lon...
Signature Bridge -Connecting Okha & Beyt Dwarka - Cable Stay Bridge-India longest span Bridge PART 2
มุมมอง 160ปีที่แล้ว
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge PART 2 #Civilpositive #cablestayedbridge #signaturebrides The Okha-Beyt Dwarka Signature Bridge is an under construction cable-stayed sea bridge in India, connecting the Beyt Dwarka island in the Gulf of Kutch and Okha. The total length of the bridge is 2,320 metres (7,612 ft). Approval for the construction of the bridge was g...
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge - India longest span Bridge
มุมมอง 2.3Kปีที่แล้ว
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge #Civilpositive #cablestayedbridge #signaturebrides The Okha-Beyt Dwarka Signature Bridge is an under construction cable-stayed sea bridge in India, connecting the Beyt Dwarka island in the Gulf of Kutch and Okha. The total length of the bridge is 2,320 metres (7,612 ft). Approval for the construction of the bridge was given by...
Signature Bridge..... Dwarka, Gujarat
มุมมอง 96ปีที่แล้ว
Signature Bridge..... Dwarka, Gujarat
Delhi - Mumbai Expressway | 1350km long| 8 lane Expressway | India longest Expressway | 8 Lane Wide
มุมมอง 189ปีที่แล้ว
Delhi - Mumbai Expressway | 1350km long| 8 lane Expressway | India longest Expressway | 8 Lane Wide #Delhi-Mumbaiexpressway #highwayconstruction #civilpositive The Delhi-Mumbai Expressway is a 1,350 km long, 8-lane wide (expandable to 12-lane) under-construction access-controlled expressway connecting India's national capital New Delhi with its financial hub Mumbai.[1][2][3][4] Foundation stone...
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA 2
มุมมอง 313ปีที่แล้ว
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA 2 #cablestayedbridge #bridge #civilpositive #Indiabridge #goaindia #largestbridge #bridgeconstruction #Highwaycumbridge #bridge, bridgerton season 1, bridge course, bridge music, #bridge drawing, bridge construction, bridge collapse, bridge race, bridge falling down, bridge and tunnel kiss, bridge ...
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA
มุมมอง 599ปีที่แล้ว
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA #civilpositive #cablestayedbridge #goaindia #signature #bridgeconstruction #bridgecourse #cable #highwayride #highwayconstruction #bridgeconstruction #Highwaycumbridge The New Zuari Bridge (Manohar Setu) Edit This is an under-construction cable-stayed bridge over Zuari River on the Panaji-Margao Na...
Signature Bridge Upper Cross Beam | Bridge Connecting Okha & Beyt-Dwarka, Gujarat| Cable stayed
มุมมอง 541ปีที่แล้ว
Signature Bridge Upper Cross Beam | Bridge Connecting Okha & Beyt-Dwarka, Gujarat| Cable stayed #cablestayedbridge #civilpositive #bridge #longestbridge #Indialongestbridge #signaturebridge #Okhagujrat #bridgeconstruction #cablestayedbridge #cable #delhiindia #bridgework #construction #highwayconstruction #morth #bridgeconstruction
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Casting Yard & RMC Plant
มุมมอง 7142 ปีที่แล้ว
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Casting Yard & RMC Plant
Kota Cable Stayed Bridge over river Chambal | Hanging bridge kota Rajasthan | Kota chambal bridge
มุมมอง 2362 ปีที่แล้ว
Kota Cable Stayed Bridge over river Chambal | Hanging bridge kota Rajasthan | Kota chambal bridge
4 Lane Signature Bridge -Aerial View | 3D Pylon | Okha-Beyt Dwarka Cable Stay Bridge |Ground Update
มุมมอง 7962 ปีที่แล้ว
4 Lane Signature Bridge -Aerial View | 3D Pylon | Okha-Beyt Dwarka Cable Stay Bridge |Ground Update
Signature Bridge -Upper Cross Beam Reinforcement | Cable Stay Bridge| Under Construction Aerial View
มุมมอง 1822 ปีที่แล้ว
Signature Bridge -Upper Cross Beam Reinforcement | Cable Stay Bridge| Under Construction Aerial View
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4
มุมมอง 7K2 ปีที่แล้ว
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4
Signature Bridge-Approach Road Construction |Aerial View| 4 Lane Highway Construction NH- 51| Part-3
มุมมอง 2082 ปีที่แล้ว
Signature Bridge-Approach Road Construction |Aerial View| 4 Lane Highway Construction NH- 51| Part-3
Deck Installation Procedure | Signature Bridge Connecting Okha & Beyt-Dwarka - PART-2 | CABLE STAY
มุมมอง 5K2 ปีที่แล้ว
Deck Installation Procedure | Signature Bridge Connecting Okha & Beyt-Dwarka - PART-2 | CABLE STAY
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka
มุมมอง 3.5K2 ปีที่แล้ว
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka
Mahatma Gandhi Museum Rajkot | PART-10| GALLERIES- 19 to 31| Mahatma Gandhi Chronology- 1944-1948
มุมมอง 302 ปีที่แล้ว
Mahatma Gandhi Museum Rajkot | PART-10| GALLERIES- 19 to 31| Mahatma Gandhi Chronology- 1944-1948
Mahatma Gandhi Museum | PART-9| GALLERIES- 15,16,17 & 18| Mahatma Gandhi Chronology- 1930- 1944
มุมมอง 252 ปีที่แล้ว
Mahatma Gandhi Museum | PART-9| GALLERIES- 15,16,17 & 18| Mahatma Gandhi Chronology- 1930- 1944
Mahatma Gandhi Museum Rajkot | PART-8| GALLERIES- 13 & 14| Mahatma Gandhi Chronology- 1920-1940
มุมมอง 162 ปีที่แล้ว
Mahatma Gandhi Museum Rajkot | PART-8| GALLERIES- 13 & 14| Mahatma Gandhi Chronology- 1920-1940
Mahatma Gandhi Museum Rajkot | PART-7| Gallery-12| Mahatma Gandhi Chronology-1916-1920
มุมมอง 532 ปีที่แล้ว
Mahatma Gandhi Museum Rajkot | PART-7| Gallery-12| Mahatma Gandhi Chronology-1916-1920
Mahatma Gandhi Museum- Rajkot | PART-6 |Galleries- 8,9,10&11| Mahatma Gandhi Chronology -1910-1916|
มุมมอง 442 ปีที่แล้ว
Mahatma Gandhi Museum- Rajkot | PART-6 |Galleries- 8,9,10&11| Mahatma Gandhi Chronology -1910-1916|
Mahatma Gandhi Museum-Rajkot | Gallery-7| PART-5| Mahatma Gandhi Chronology-1893-1906| The Black Act
มุมมอง 212 ปีที่แล้ว
Mahatma Gandhi Museum-Rajkot | Gallery-7| PART-5| Mahatma Gandhi Chronology-1893-1906| The Black Act
Mahatma Gandhi Museum Rajkot | Galleries 5 & 6 | PART-4| Mahatma Gandhi Chronology - 1887-1893
มุมมอง 202 ปีที่แล้ว
Mahatma Gandhi Museum Rajkot | Galleries 5 & 6 | PART-4| Mahatma Gandhi Chronology - 1887-1893
Mahatma Gandhi Museum Rajkot || Galleries 3 & 4 || PART- 3|| Pietermaritzburg Railway Station
มุมมอง 532 ปีที่แล้ว
Mahatma Gandhi Museum Rajkot || Galleries 3 & 4 || PART- 3|| Pietermaritzburg Railway Station
Mahatma Gandhi Chronology - 1869-1887 | Mahatma Gandhi Museum Rajkot | Galleries 1&2 | PART-2|
มุมมอง 602 ปีที่แล้ว
Mahatma Gandhi Chronology - 1869-1887 | Mahatma Gandhi Museum Rajkot | Galleries 1&2 | PART-2|
Mahatma Gandhi Museum, Rajkot Gujarat | PART-1 |
มุมมอง 1392 ปีที่แล้ว
Mahatma Gandhi Museum, Rajkot Gujarat | PART-1 |
Things To Check Before Casting Columns as Site Engineer || Columns Check Before Concreting
มุมมอง 4522 ปีที่แล้ว
Things To Check Before Casting Columns as Site Engineer || Columns Check Before Concreting
Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka..NH-51
มุมมอง 7342 ปีที่แล้ว
Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka..NH-51

ความคิดเห็น

  • @prasannal1967
    @prasannal1967 หลายเดือนก่อน

    Thankyou sir for your excellent explanation❤😊

  • @vipin519
    @vipin519 2 หลายเดือนก่อน

    Sir please share notes for two way slab

  • @refatferdous4246
    @refatferdous4246 4 หลายเดือนก่อน

    Sir,Here, admixture using matter is not involved in ACI math example. Kindly give an example math and solutions of admixture using calculations Problems in ACI mix Design.

  • @vishalkumar-pk2bj
    @vishalkumar-pk2bj 4 หลายเดือนก่อน

    Is code 2019 ke according hi kya

  • @rohithavanur9879
    @rohithavanur9879 5 หลายเดือนก่อน

    Thoda calculation samjha dijiye 1.Specific gravity of cement with respect to kerosene? 2. Specific gravity of kerosene with respect to water? 3. Specific gravity of cement with respect to water? Aap to 1st &2nd wala bola hai 3rd ?

  • @CROW-pu9vc
    @CROW-pu9vc 6 หลายเดือนก่อน

    In %of reinforcement at ast 524/2

  • @karimtripura2637
    @karimtripura2637 8 หลายเดือนก่อน

    Sir minimum Reinforcement should be 0.12℅ bcoz u have used Fe415 HYSD bar

  • @KajalKumari-wh4oc
    @KajalKumari-wh4oc 9 หลายเดือนก่อน

    Sir can u explain me from where we get value of phi

  • @dce148rajeshkumarshaw4
    @dce148rajeshkumarshaw4 9 หลายเดือนก่อน

    Ye kya marathon hai 😂

  • @kshitijkumarkushwaha8903
    @kshitijkumarkushwaha8903 10 หลายเดือนก่อน

    I recommend you not to watch this video if you are watching just before exam bcoz you will get confused instead watch engineer ki pathsala (it is lengthy ) but you will understand everything But this lecture was also good.

  • @kveditzz5054
    @kveditzz5054 11 หลายเดือนก่อน

    16) a) Design a concrete mix by BIS method with the following data : i. Characteristics compressive strength = 35N/mm2 ii. Maximum size of aggregate = 20mm (angular) iii. Fine aggregates confirm to grading zone II iv. Workability = 75mm slump v. Degree of quality control = Good, vi. Type of exposure = Mild (Plain Concrete) vii. Specific gravity of cement = 3.14 viii. Specific gravity of fine aggregate = 2.58 ix. Water absorption (i) Coarse aggregate = 1.9% (ii) Fine aggregate x. Water cement ratio = 0.48 Assume any other data if necessary. Also calculate the quantity of cement, sand, coarse aggregate and water required per cubic metre of concrete.

  • @souvik.fingtore
    @souvik.fingtore ปีที่แล้ว

    The word" teacher" meaning define by ur teaching style and explanation & thanks fram JADAVPUR UNIVERSITY.....😍

  • @riddhishsingh8648
    @riddhishsingh8648 ปีที่แล้ว

    Dada Two way slab design ka video provide kegiye....

  • @brahmatejaballipalli3392
    @brahmatejaballipalli3392 ปีที่แล้ว

    Nice explanation,but i cant understand sir how you can get the area of steel Ast please reply back

  • @pilliarunkumar-x2h
    @pilliarunkumar-x2h ปีที่แล้ว

    Tq sir

  • @MIMO0351Q
    @MIMO0351Q ปีที่แล้ว

    Noobri😂😂😂😂

  • @harsh_shukla1555
    @harsh_shukla1555 ปีที่แล้ว

    Sir why for deflection check you have not multiply 1.3 as slab is in confinement?

  • @sravankumar14
    @sravankumar14 ปีที่แล้ว

    Super sir

  • @nasarashraf
    @nasarashraf ปีที่แล้ว

    nice 👍

  • @chirantanibiswas
    @chirantanibiswas ปีที่แล้ว

    For slab design the basic value is on the page 39.

  • @teja1424
    @teja1424 ปีที่แล้ว

    Design the concrete mix for the following data: characteristic compressive strength = 35MPa, maximum size of aggregate =20mm (angular), Degree of workability = 0.9 CF, Degree of quality control = good and type of exposure = severe. Water absorption by CA = 1% and moisture content in FA=1.5%.Assume any suitable missing data.

  • @insideouttek2361
    @insideouttek2361 ปีที่แล้ว

    Simply support q liya

  • @Belowaverage541
    @Belowaverage541 ปีที่แล้ว

    Thankyou sir bohot ache se explain kara apne

  • @bhubaneswarimohanty7465
    @bhubaneswarimohanty7465 ปีที่แล้ว

    From where the clear cover value came sir ?

  • @aashishdas9981
    @aashishdas9981 ปีที่แล้ว

    Slab Ka area of rf 0.12 % of cross sectional area hota h

  • @aashishdas9981
    @aashishdas9981 ปีที่แล้ว

    Dead load and live loads have different unit,then how can they be added? One is in n\m and other is in n\mm^2

  • @shashank_d_a
    @shashank_d_a ปีที่แล้ว

    Thank you soo much sir...., 💗

  • @nasarashraf
    @nasarashraf ปีที่แล้ว

    Good

  • @Hello_family111
    @Hello_family111 ปีที่แล้ว

    Worst cam quality with good explanation

  • @viralvideoshort603
    @viralvideoshort603 ปีที่แล้ว

    Good project

  • @ajayahirajay7349
    @ajayahirajay7349 ปีที่แล้ว

    Jay Dwarkadhish

  • @ashoksanghvi7126
    @ashoksanghvi7126 ปีที่แล้ว

    Very nice 👌

  • @jatindadwal2492
    @jatindadwal2492 ปีที่แล้ว

    When ur teaching is passion and not a work ! Loved ur explanation ❤️

  • @ASMohamedZiyath
    @ASMohamedZiyath ปีที่แล้ว

    good

  • @ravishankars1420
    @ravishankars1420 ปีที่แล้ว

    Looks like the bridge is ready in all respects to be opened to traffic, any idea when it is likely to happen..

  • @SuperMan-pv5ee
    @SuperMan-pv5ee ปีที่แล้ว

    thankyou

  • @53piyushghagi28
    @53piyushghagi28 ปีที่แล้ว

    Thank you

  • @prakashbhuyiar5106
    @prakashbhuyiar5106 ปีที่แล้ว

    It was good explanation 😊

  • @sridharmaddamsetty3046
    @sridharmaddamsetty3046 ปีที่แล้ว

    Very beautiful explanation to understand how to do experiments.......simple and clear ThanQ sir

  • @vishnuvirat1382
    @vishnuvirat1382 ปีที่แล้ว

    why the b is taken as 1000 here

  • @moinkhan8920
    @moinkhan8920 ปีที่แล้ว

    Clear cover values?

    • @ramanraj6144
      @ramanraj6144 ปีที่แล้ว

      assumed, keeping d in mind.

  • @kalpeshbadgujar666
    @kalpeshbadgujar666 ปีที่แล้ว

    Hello Sir, In check for deflection the value of actual deflection is 29.41 and permisible value is 29 then it is safe or not ?

  • @se1-03-krushnkantjanardanb6
    @se1-03-krushnkantjanardanb6 ปีที่แล้ว

    Sir two way slab ka upload karo na

  • @vishalbaraiya7684
    @vishalbaraiya7684 2 ปีที่แล้ว

    💯👍👍👍

  • @vishalbaraiya7684
    @vishalbaraiya7684 2 ปีที่แล้ว

    Very good video Okha to bet Dwarka thank you very much

  • @teerthagauravyadav4524
    @teerthagauravyadav4524 2 ปีที่แล้ว

    जय द्वारकाधीश, जय मोदी जी

  • @vijayraut4891
    @vijayraut4891 2 ปีที่แล้ว

    Modification factor 1.55 how isn't it 1.35, Can u make me clear Pls ....

    • @vijayraut4891
      @vijayraut4891 2 ปีที่แล้ว

      Can anyone make me clear....

  • @D.G.-79
    @D.G.-79 2 ปีที่แล้ว

    How Much Time Will be Taken For Completion of The Project??

    • @civilpositive805
      @civilpositive805 2 ปีที่แล้ว

      Next Year Complete approximately 65% to 75% work completed.......

  • @khushpreetKaur-yn4em
    @khushpreetKaur-yn4em 2 ปีที่แล้ว

    Tq sir😊👍

  • @kamleshmandal8757
    @kamleshmandal8757 2 ปีที่แล้ว

    sir slab ko t clear cover 15 hunxa niii