BIMSafe Case Study 21 Court Theatre- Developing a Culture of Collaboration through BIM
On the Court Theatre project, the use of Building Information Modelling (BIM) has fostered a more collaborative culture among subcontractors, encouraging them to consider the work of other trades and coordinate their efforts more effectively. By providing a holistic view of the project and enabling better communication, BIM has helped to break down the "first in best dressed" mentality and promote a more cooperative approach to construction delivery, leading to improved safety and efficiency on site.
มุมมอง: 28

วีดีโอ

BIMSafe Case Study 20 Court Theatre Pre planning for safer work methodology
มุมมอง 172 หลายเดือนก่อน
On the Court Theatre project in Christchurch, the use of Building Information Modelling (BIM) enabled the project team to proactively plan for safer working conditions. By leveraging 3D modeling and collaborative processes, the team identified potential issues early and developed strategies to mitigate risks. This approach led to reduced need for working at heights, minimized manual handling, a...
BIMSafe Case Study 12 Colin's Story
มุมมอง 782 หลายเดือนก่อน
In the mechanical services industry, experienced workers like Colin Gray, a contract pipe fitter and welder, are benefiting from the use of Building Information Modelling (BIM) and 3D modelling. These technologies allow older workers to continue contributing their valuable skills while minimising physical risks associated with working on-site. By enabling remote work and prefabrication, BIM and...
BIMSafe Case Study Video 17 Services Clash detection ACC Otepoti
มุมมอง 433 หลายเดือนก่อน
On the ACC Ōtepoti project, project, the use of Building Information Modeling (BIM) and collaborative processes enabled the project team to focus on potential health and safety hazards that could occur during construction and installation of services, particularly in ceiling spaces. By leveraging a federated 3D model and facilitating open communication among stakeholders, including contractors ...
BIMSafe Case Study video 27 Helix Global Prefabricated Residential Construction
มุมมอง 253 หลายเดือนก่อน
Helix Global is pioneering New Zealand's first fully off-site manufactured residential home. By leveraging Building Information Modelling (BIM) technology, the company has been able to address the unique challenges associated with prefabricated construction, transportation, and on-site assembly. The use of BIM has enabled Helix Global to enhance safety throughout the entire process, from factor...
BIMSafe case Study 13 DBC BIM Parts Modelling and prefabrication
มุมมอง 363 หลายเดือนก่อน
DBC Contractors utilized Building Information Modelling (BIM) and advanced manufacturing techniques to improve safety and efficiency in the mechanical services installation for the Dunedin Outpatients Building. By leveraging 3D modelling and direct-to-fabrication processes, the team significantly reduced on-site work at height, improved accuracy, and created a safer work environment.
BIMSafe Case Study video 14 Facade Install Improvement
มุมมอง 743 หลายเดือนก่อน
On the ACC Ōtepoti project, the use of Building Information Modelling (BIM) and collaborative processes enabled the project team to identify and resolve potential health and safety hazards related to the façade installation process. By leveraging the 3D model and facilitating open communication among stakeholders, including contractors and consultants, the team could thoroughly investigate and ...
BIMSafe Case Study Video 26 New BIM User
มุมมอง 633 หลายเดือนก่อน
On the ACC Ōtepoti project, the introduction of Building Information Modelling (BIM) to a seasoned construction professional with 23 years of experience in traditional 2D environments has demonstrated the significant potential for improving safety planning, communication, and issue resolution. By leveraging the 3D model's interactive capabilities, the team was able to visualize and address pote...
BIMSafe Case study 19 John Jones Steel
มุมมอง 503 หลายเดือนก่อน
John Jones Steel has been utilizing 3D modelling technology for over 20 years, with a strong focus on improving health and safety in construction processes. By leveraging Building Information Modelling (BIM), the company has significantly enhanced its ability to design safer construction methods, increase prefabrication, and optimize on-site assembly processes. This approach has led to improved...
BIMSafe Case study 25: City Rail Link Driver Training
มุมมอง 193 หลายเดือนก่อน
For the Central Rail Link project, a virtual reality fly-through is used to educate train drivers and communicate project progress to the public. This innovative approach allows drivers to experience and prepare for potential hazards they may encounter during construction, enhancing safety and awareness. The 3D model is updated quarterly to reflect current site conditions, including temporary w...
BIMSafe case Study 24: City Rail Link Virtual Induction
มุมมอง 193 หลายเดือนก่อน
The City Rail Link (CRL) project in New Zealand has implemented an innovative virtual reality (VR) induction process for workers, leveraging Building Information Modelling (BIM) to create immersive training environments. This approach allows workers to experience and understand potential hazards and safety protocols in a risk-free virtual setting before entering the actual construction site. Th...
BIMSafe Case Study Video 16 Contractor project communication, and planning
มุมมอง 473 หลายเดือนก่อน
On the ACC Ōtepoti project, the use of Building Information Modelling (BIM) and collaborative processes by Naylor Love has become an essential tool for improving communication, enhancing safety planning, and reducing rework. By leveraging 3D models to visualise complex details and identify potential issues before construction begins, the company has been able to significantly improve its approa...
BIMSafe Case Study Video 28: Contractor Hazard ID and risk mitigation
มุมมอง 283 หลายเดือนก่อน
On the ACC Ōtepoti project, a 5.6-meter void existed below the service deck on the top floor. The use of Building Information Modelling (BIM) enabled the project team to identify and address potential health and safety hazards associated with wall construction and services installation. By leveraging the 3D model and facilitating open communication among stakeholders, the team could thoroughly ...
BIMSafe Case Study 23 Water care Digital Enterprise Model
มุมมอง 163 หลายเดือนก่อน
In this case study, Farzam Farzadi discusses how Building Information Modelling (BIM) has been implemented on a number of projects for Watercare, a water utility company in Auckland. By embracing BIM as a culture and way of working, Watercare has been able to improve health and safety outcomes, reduce project risks, and enhance collaboration among project stakeholders.
BIMSafe Case Study Video 18: Southbase Hilti Robot
มุมมอง 2223 หลายเดือนก่อน
The implementation of the Hilti Jaibot, a semi-autonomous drilling robot, in conjunction with Building Information Modelling (BIM), has revolutionised the process of installing seismic restraint anchor holes in overhead structures. This innovative approach has significantly enhanced worker safety, improved efficiency, and reduced human error in a large-scale construction project requiring the d...
BIMSafe Presentation video 1 Seeing The Unseen: Robin Findlay, DE Manager, Auckland Airport
มุมมอง 396 หลายเดือนก่อน
BIMSafe Presentation video 1 Seeing The Unseen: Robin Findlay, DE Manager, Auckland Airport
BIMSafe Presentation video 2. DE to support H&S on Infrastructure Projects Farzam Farzadi BECA
มุมมอง 246 หลายเดือนก่อน
BIMSafe Presentation video 2. DE to support H&S on Infrastructure Projects Farzam Farzadi BECA
BIMsafe Presentation video 4. HSA using BIM to their advantage. Jen Dransfield, Naylor Love
มุมมอง 256 หลายเดือนก่อน
BIMsafe Presentation video 4. HSA using BIM to their advantage. Jen Dransfield, Naylor Love
BIMsafe Presentation video 5. BIM For Safety On Auckland’s City Rail Link Project. Dean Burke WSP
มุมมอง 376 หลายเดือนก่อน
BIMsafe Presentation video 5. BIM For Safety On Auckland’s City Rail Link Project. Dean Burke WSP
BIMSafe Case Study Video 5: Contractors Using BIM For Health And Safety.
มุมมอง 1526 หลายเดือนก่อน
BIMSafe Case Study Video 5: Contractors Using BIM For Health And Safety.
BIMSafe case Study Video 6: ACC Otepoti A BIM Manager’s View on BIM For Installation.
มุมมอง 1076 หลายเดือนก่อน
BIMSafe case Study Video 6: ACC Otepoti A BIM Manager’s View on BIM For Installation.
BIMSafe Case Study Video 7: ACC Otepoti: Reducing Plant Room Risks In Installation.
มุมมอง 1036 หลายเดือนก่อน
BIMSafe Case Study Video 7: ACC Otepoti: Reducing Plant Room Risks In Installation.
BIMSafe Case Study Video 8. ACC Ōtepoti Building -Project Managers Perspective Using OpenSpace .
มุมมอง 3416 หลายเดือนก่อน
BIMSafe Case Study Video 8. ACC Ōtepoti Building -Project Managers Perspective Using OpenSpace .
BIMsafe Presentation video 6. A New Resource For H&S by C Erasmus and M Anzano, Steel and Tube
มุมมอง 126 หลายเดือนก่อน
BIMsafe Presentation video 6. A New Resource For H&S by C Erasmus and M Anzano, Steel and Tube
ACC Dunedin Animation
มุมมอง 4410 หลายเดือนก่อน
ACC Dunedin Animation
BIMSafe Case Study video 4:ACC Otepoti: Multiple Consultants Collaborative Use Of BIM In reinforcing
มุมมอง 136ปีที่แล้ว
BIMSafe Case Study video 4:ACC Otepoti: Multiple Consultants Collaborative Use Of BIM In reinforcing
BIMSafe Case Study video 3: ACC Otepoti Visualisation for Project Communication In piling
มุมมอง 231ปีที่แล้ว
BIMSafe Case Study video 3: ACC Otepoti Visualisation for Project Communication In piling
BIMSafe Case study video 9 ACC Otepoti Designer & Contractor Model Interaction For Safety Planning.
มุมมอง 131ปีที่แล้ว
BIMSafe Case study video 9 ACC Otepoti Designer & Contractor Model Interaction For Safety Planning.
BIMSafe Case Study Video 2: ACC Otepoti Collaborative Use Of BIM In Safety Planning for foundations
มุมมอง 298ปีที่แล้ว
BIMSafe Case Study Video 2: ACC Otepoti Collaborative Use Of BIM In Safety Planning for foundations
BIMSafe Case Study Video 1 - Design stages of Otepoti ACC Project
มุมมอง 119ปีที่แล้ว
BIMSafe Case Study Video 1 - Design stages of Otepoti ACC Project