Story Contracting Ltd
Story Contracting Ltd
  • 149
  • 516 002
Shields Road bridge replacement - Scotland's Railway
Over a year teams from Story and Network Rail worked around the clock to replace the worn out structure. Check the video out to see the works in action.
มุมมอง: 318

วีดีโอ

DCL/56 River Cherwell civil engineering works
มุมมอง 311หลายเดือนก่อน
Railway upgrades to improve journeys for passengers and freight between Bicester and Leamington Spa are now complete. The stretch of the Chiltern main line reopened after essential improvements were completed by Network Rail and Story Contracting, to the important route between London Marylebone and the West Midlands. #engineer #civilengineering #railway #networkrail #machine #transport
Hartlepool Station upgrade complete
มุมมอง 8832 หลายเดือนก่อน
#TeamStory are proud to have recently completed works to upgrade Hartlepool Station on behalf of Network Rail Eastern Region and Tees Valley Combined Authority. The £12m project has seen platform 3 brought back into use for the first time in over 30 years, as well as the installation of a new footbridge, lifts and stairs, making the station accessible to all. Watch the video to hear more from P...
Story Scotland 10 years in 10 projects
มุมมอง 1593 หลายเดือนก่อน
Story Scotland 10 years in 10 projects
Join us to build bird boxes with Cadishead Scouts
มุมมอง 313 หลายเดือนก่อน
Join us to build bird boxes with Cadishead Scouts
Midland Main Line Electrification - Three Arch demolition
มุมมอง 20K4 หลายเดือนก่อน
A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished by Story on the Kettering to Wigston stretch to prepare for new overhead wires.
Story Charity Campaign 23/24
มุมมอง 144 หลายเดือนก่อน
Story Charity Campaign 23/24
New multi-million-pound footbridge and lifts installed at Dumfries station
มุมมอง 2115 หลายเดือนก่อน
The new footbridge and lift shafts are now in place at Dumfries station following works over the weekend.
Hope Valley Railway Upgrade final works
มุมมอง 3.3K5 หลายเดือนก่อน
On Monday 25 March the first passenger train stopped at the new fully accessible platform, marking the completion of the new track layout at Dore junction, delivered by VolkerRailStory Joint Venture on behalf of Network Rail. In the run up to this milestone, teams worked around the clock to implement the new signalling system and finalise track installation, ensuring the Dore South Curve extens...
Shields Road bridge demolition
มุมมอง 5235 หลายเดือนก่อน
Network Rail and Story Scotland successfully demolished Shields Road bridge in Glasgow during a period of 24-hour working over the Easter weekend. Working around the clock, excavators demolished the bridge deck from road level and, with the debris cleared from the track, work began immediately to prepare for construction of the new abutments to support the piling slabs.
PWI Practical Trackwork Challenge 2024
มุมมอง 1696 หลายเดือนก่อน
Story Contracting’s specialist in-house track team were proud to support the two-day Permanent Way Institution (PWI) Practical Trackwork Challenge event hosted at Bo’ness & Kinneil Heritage Railway.
Hope Valley Railway Upgrade: Dore & Totley footbridge
มุมมอง 1.2K8 หลายเดือนก่อน
Hope Valley Railway Upgrade: Dore & Totley footbridge
Hope Valley Railway Upgrade: Grindleford track installation
มุมมอง 2948 หลายเดือนก่อน
Hope Valley Railway Upgrade: Grindleford track installation
Port Glasgow Access for All Opening Event
มุมมอง 889 หลายเดือนก่อน
Story joined Scotland’s Railway and friends from the community to celebrate the official opening of Port Glasgow station’s £5m footbridge and lifts. The new footbridge allows passengers a safe route over the railway, with lifts providing step-free access to and from the platforms. The lift on platform 2 elevates to a second floor, bringing passengers to and from the Highholm Avenue park and rid...
Hope Valley Railway Upgrade: MAS25 bridge installation
มุมมอง 1.9K10 หลายเดือนก่อน
Hope Valley Railway Upgrade: MAS25 bridge installation
Uddingston AfA Visualisation
มุมมอง 11910 หลายเดือนก่อน
Uddingston AfA Visualisation
LSC24 River Avon, Warwickshire
มุมมอง 514ปีที่แล้ว
LSC24 River Avon, Warwickshire
Over 2000 volunteering hours delivered on the Hope Valley Railway Upgrade
มุมมอง 79ปีที่แล้ว
Over 2000 volunteering hours delivered on the Hope Valley Railway Upgrade
Winchburgh beam lift
มุมมอง 185ปีที่แล้ว
Winchburgh beam lift
Hope Valley Railway Upgrade: Bamford soil nailing
มุมมอง 631ปีที่แล้ว
Hope Valley Railway Upgrade: Bamford soil nailing
Story Summer School
มุมมอง 202ปีที่แล้ว
Story Summer School
You're in Safe Hands Campaign
มุมมอง 225ปีที่แล้ว
You're in Safe Hands Campaign
LEC1/9E Regent’s Canal replacement
มุมมอง 255ปีที่แล้ว
LEC1/9E Regent’s Canal replacement
Sutton Coldfield Bridge Replacement
มุมมอง 629ปีที่แล้ว
Sutton Coldfield Bridge Replacement
Invercoe Bridge Replacement
มุมมอง 909ปีที่แล้ว
Invercoe Bridge Replacement
Ravenscraig WCML 5,000T structure move
มุมมอง 1.6Kปีที่แล้ว
Ravenscraig WCML 5,000T structure move
Rail Conference Scotland
มุมมอง 905ปีที่แล้ว
Rail Conference Scotland
Saltmarket reaches halfway point
มุมมอง 179ปีที่แล้ว
Saltmarket reaches halfway point
Hope Valley Railway Upgrade: First track installed at Bamford
มุมมอง 2.3Kปีที่แล้ว
Hope Valley Railway Upgrade: First track installed at Bamford
Highland Spring Rail Freight Yard
มุมมอง 1.4K2 ปีที่แล้ว
Highland Spring Rail Freight Yard

ความคิดเห็น

  • @markdavis2475
    @markdavis2475 17 วันที่ผ่านมา

    Very interesting post👍 I remember about 50 years ago the road bridge over the main line into Euston, at Southgate, was replaced. They'd built a Bailey bridge next to the line, after covering the rails with old sleepers, at night they blew up the bridge, cleared the rubble, installed the Bailey and by morning the road and rail lines were open again. They then built the new road bridge. I watched them building the Bailey, past my bedtime to see the bang though 😀

  • @michaellaudahn
    @michaellaudahn 2 หลายเดือนก่อน

    And again the same clumsy, ugly and obtrusive mast system as on the GWML. It wouldn't have to be like that. You could ask yourselves why 'they' don't learn?

  • @MattDavis_BeechingsGhosts
    @MattDavis_BeechingsGhosts 2 หลายเดือนก่อน

    Have you got any time lapse of bridge replacements?

  • @Olleetheowl
    @Olleetheowl 2 หลายเดือนก่อน

    So where is it? Is that a secret?… knowledge is power… don’t tell anyone…

  • @tomservo5007
    @tomservo5007 2 หลายเดือนก่อน

    the Romans built that bridge

    • @qasimmir7117
      @qasimmir7117 หลายเดือนก่อน

      And the railway underneath too?

  • @alistairkewish651
    @alistairkewish651 2 หลายเดือนก่อน

    Are the Coal Lines going to be wired up as well?

  • @alistairkewish651
    @alistairkewish651 2 หลายเดือนก่อน

    I agree with you as to the shape and design but the MR did not envisage electrification arriving for many decades. Now it has, if only in rather piecemeal stages, I gather.

  • @iangregoryhome
    @iangregoryhome 2 หลายเดือนก่อน

    😢

  • @True_NOON
    @True_NOON 2 หลายเดือนก่อน

    After a bit of searching it seem to be the bridge at roughly 52.463927,-0.887338 , and it really wasnt a loss in terms of conectivity since just 1 field further there is an underpass aswell as several other crossings , still very intersting to see such a bridge removal project sped up :)

  • @Cartoonman154
    @Cartoonman154 2 หลายเดือนก่อน

    To be replaced with a concrete toilet.

  • @johnm2012
    @johnm2012 2 หลายเดือนก่อน

    I thought they'd abandoned the Midland Mainline electrification project north of Kettering, once the branch to Corby had been completed. Is it continuing to Leicester, Nottingham, Derby and Sheffield or is this old footage?

    • @JoeyLovesTrains
      @JoeyLovesTrains 2 หลายเดือนก่อน

      Description says Kettering to Wigston

    • @rockerjim8045
      @rockerjim8045 2 หลายเดือนก่อน

      it’s definitely going to be the full Midland Mainline. Sheffield and Notts to St Pancreas. About a month ago contractors were doing a night time survey in the Beeston area.

    • @beardedmonkey1320
      @beardedmonkey1320 2 หลายเดือนก่อน

      @@rockerjim8045 it'll be interesting to see what they do on the apporoach to leicester station as that'll pose a legistical nightmare

    • @alexpeak16
      @alexpeak16 2 หลายเดือนก่อน

      @@beardedmonkey1320I wonder if they’ll electrify the rest of the MML to Nottingham/Sheffield then try to make Leicester work. Is a low bridge the problem?

    • @beardedmonkey1320
      @beardedmonkey1320 2 หลายเดือนก่อน

      @@alexpeak16 its not just a low bridge its also the concorse, bridge to platforms and main road, the only possible method is lowering the tracks but that would mean either lowering the platforms or moving the platforms to compensate for the tracks being lowered, im not an engineer but there isnt much spacebetween the roof of the trains and the bridge.

  • @barrysmall8645
    @barrysmall8645 2 หลายเดือนก่อน

    Absolute vandalism ...the track could have been lowered....don't raise the bridge lower the river..as they used to say to point out the obvious.

    • @SWRural-fk2ub
      @SWRural-fk2ub 2 หลายเดือนก่อน

      Apparently the bridge was no longer in use. (see comments above). There are plenty of other examples of this type of bridge.

    • @beardedmonkey1320
      @beardedmonkey1320 2 หลายเดือนก่อน

      at a significantly higher cost, and who do you think would have to pay for that, bridge removal tens of thousands, lowering the tracks hundreds of thousands if not millions!

  • @ianj843
    @ianj843 2 หลายเดือนก่อน

    What went over the bridge and how does it cross the railway now? Very interesting though.

    • @Paul_707
      @Paul_707 2 หลายเดือนก่อน

      An unsurfaced farm track, which was not marked as a public footpath on OS maps. It gave access to a field on the north side of the railway which is now a massive National Grid substation, and it had a new road access built.

    • @johnm2012
      @johnm2012 2 หลายเดือนก่อน

      ​@@Paul_707Can you say where it is, Paul? If this is recent footage are they continuing to electrify towards Leicester?

    • @ianj843
      @ianj843 2 หลายเดือนก่อน

      @@Paul_707 Thanks.

    • @lexifillems
      @lexifillems 2 หลายเดือนก่อน

      @@johnm2012Kettering - Wigston is the current section which is going to be energized on July 28th according to Network Rail.

  • @ElliottHurst
    @ElliottHurst 2 หลายเดือนก่อน

    F

  • @jamesbeckwith3639
    @jamesbeckwith3639 2 หลายเดือนก่อน

    What a lovely bridge... shame it had to go ... bet it must have been at least 2x as old as of the demo team

  • @peterrobinson903
    @peterrobinson903 2 หลายเดือนก่อน

    Where was the bridge located.

  • @johndean4998
    @johndean4998 2 หลายเดือนก่อน

    Is a replacement planned, or did the bridge carry a highway for which an alternative route is available?

    • @rockerjim8045
      @rockerjim8045 2 หลายเดือนก่อน

      usually if a route is removed they have to reinstate it within a certain time frame

  • @MervynPartin
    @MervynPartin 2 หลายเดือนก่อน

    Very impressive. Nice work by the team.

  • @mauricehopper7802
    @mauricehopper7802 2 หลายเดือนก่อน

    Clearly this nice looking bridge was not worth applying the Bill Harvey ‘lifting’ technique of cutting the piers, raising the arches and inserting extra brickwork to provide enough clearance for the overhead wires.

  • @anthonylulham3473
    @anthonylulham3473 2 หลายเดือนก่อน

    Bit Sad to lose a nice bridge, would have taken a lot longer to put up than it was to take down.

    • @Roy-gi5ul
      @Roy-gi5ul 2 หลายเดือนก่อน

      Typical Midland Main line overbridge. Elegant and sturdy. But electrification will improve services on this important route!

    • @qasimmir7117
      @qasimmir7117 หลายเดือนก่อน

      Usually most things are easier and quicker to destroy than build.

  • @johncamp2567
    @johncamp2567 2 หลายเดือนก่อน

    Interesting video….👍

  • @neiltonks4627
    @neiltonks4627 5 หลายเดือนก่อน

    The sad thing is that all this work was done to partly allow additional passenger services to run between Manchester and Sheffield but there are no plans to introduce any! Capacity constraints at Stockport and Sheffield make that impossible at the moment. It will, of course, make services more reliable and reduce the delays caused by passenger trains being stuck behind slower freights but it’s a shame the full benefits will not be realised.

    • @highpath4776
      @highpath4776 5 หลายเดือนก่อน

      IF the Sheffield-Stocksbridge gets passenger service that could take a couple of TpH? Manchester can be reached via Stockport(Hazel Grove) Or the Reddish North or Hyde Routes. (Sending more from Stockport out Reddish South wont be useful as they have to cross the southbounds out of Picc, so not helpful there ? - the world doesnt have to end at Man Picc really.

  • @chorlton4
    @chorlton4 5 หลายเดือนก่อน

    Although at the junction the line to Sheffield is doubled , the chord to the south has been left single still, why?

  • @janetlewis7145
    @janetlewis7145 5 หลายเดือนก่อน

    Where is Hope Valley? Bill from California

    • @officialmcdeath
      @officialmcdeath 5 หลายเดือนก่อน

      Broadly between Greater Manchester and Sheffield \m/

    • @SWRural-fk2ub
      @SWRural-fk2ub 5 หลายเดือนก่อน

      Look up 'Dore Sheffield' on Google Earth /Maps. If you do 'Hope Valley' it will take you to the centre of the valley. Dore is where the junction is.

    • @janetlewis7145
      @janetlewis7145 5 หลายเดือนก่อน

      @@officialmcdeath Thank you.

    • @keithmason7481
      @keithmason7481 5 หลายเดือนก่อน

      South cord single ,l assume, because of the low number of trains which use it.

  • @tomsmith48
    @tomsmith48 8 หลายเดือนก่อน

    Why am I hearing Coldplay in this 😅. Not complaining, and good work too.

  • @kennethmcintyre2847
    @kennethmcintyre2847 8 หลายเดือนก่อน

    Great to hear about rail improvements, but too short.

  • @Lanaranaful
    @Lanaranaful 9 หลายเดือนก่อน

    ok, this is epic

  • @edgarleonard5952
    @edgarleonard5952 ปีที่แล้ว

    😜 Promo SM

  • @hilltaylor18
    @hilltaylor18 ปีที่แล้ว

    Can anybody provide background on what's happening here? Some sort if erosion control?

    • @robertdu-roe4434
      @robertdu-roe4434 ปีที่แล้ว

      Widening the cut to add a loop line for freight trains

  • @kennethmcintyre2847
    @kennethmcintyre2847 ปีที่แล้ว

    Keep the videos coming

  • @declanjoyce8640
    @declanjoyce8640 ปีที่แล้ว

    Excellent job....awesome..

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam..

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam.

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam.

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam.

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam..

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam.

  • @preshycodass1032
    @preshycodass1032 2 ปีที่แล้ว

    I was cures from herpes with the help of #doctorapala who I came across on TH-cam.

  • @michaelschofield1537
    @michaelschofield1537 2 ปีที่แล้ว

    Your use of mobile towers is unsafe.. get trained !

  • @svaytep1272
    @svaytep1272 3 ปีที่แล้ว

    suostei tae anak so k sabbay te

  • @brankoljubec1953
    @brankoljubec1953 3 ปีที่แล้ว

    ⁰]

  • @terrytytula
    @terrytytula 3 ปีที่แล้ว

    Great job, but I can't help thinking how little more it would have cost to have them add a pedestrian lane to the bridge.

    • @xaiano794
      @xaiano794 ปีที่แล้ว

      The pedestrian bridge is on the right, just out of sight

  • @brandonwagner4719
    @brandonwagner4719 3 ปีที่แล้ว

    COOL

  • @1iculungman
    @1iculungman 4 ปีที่แล้ว

    We have a "Story" company here in Tulsa, OK. wonder if they are related. hmmm

  • @MasterCivilEngineering
    @MasterCivilEngineering 4 ปีที่แล้ว

    Watch video solutions of engineering questions to expertise your knowledge!

  • @elielevy689
    @elielevy689 4 ปีที่แล้ว

    Thank's for your contribution. www.solytek.com/en/rail-handling-furniture/

  • @udorechner6846
    @udorechner6846 4 ปีที่แล้ว

    So now 5 Years old it is still an amazing video. But i'm wondering too that they don't replace the old piers.

  • @Saki630
    @Saki630 4 ปีที่แล้ว

    next time bring a bridge large enough to lift the bridge out of position and ferry it away :0 ahhaha