- 55
- 50 891
Shahzad Ahmed Iqbal, (SAP Solution Consultant)
Pakistan
เข้าร่วมเมื่อ 15 ธ.ค. 2021
All videos are related to ERP SAP ECC or SAP S4 HANA different modules like Finance, Controlling (Management Accounting), Logistics, Public Sector Management (Fund Management / Grant Management), Project System.
These videos are specially prepared for configuration point of view at consultant level, also some simple videos for end user of SAP ERP. I also upload videos related to configuration of HCM or Payroll module. I 'll try to explain the each logic, defaults and reasons of configuration, tables behind the screen, concepts for deep understanding in SAP ECC and SAP S4 HANA.
For any further query, feedback, Training or consultation, You can send me email at the following:
Email: shahzadahmediqbal@gmail.com
These videos are specially prepared for configuration point of view at consultant level, also some simple videos for end user of SAP ERP. I also upload videos related to configuration of HCM or Payroll module. I 'll try to explain the each logic, defaults and reasons of configuration, tables behind the screen, concepts for deep understanding in SAP ECC and SAP S4 HANA.
For any further query, feedback, Training or consultation, You can send me email at the following:
Email: shahzadahmediqbal@gmail.com
Types of Clearing document in Financial Accounting SAP HANA | Account Clearing | Post with Clearing
Clearing of document is very important process in financial accounting module to settle the invoices. There are various methods to clear the documents but if we divide them with their main functionality then we will divide them as follow:
1 . On Account Clearing
2. Post with Clearing
On account clearing processes, it is mandatory that both the line items should be present at the time of clearing. But in post with clearing, the new opposite line item is created and simultaneously the other line item is cleared.
In SAP S4 HANA, the cleared document contain line items in "On Account Clearing" where as in SAP ECC, there was no line items in cleared document.
For any consultancy, training or issue, you can contact at the following:
Email: ShahzadAhmedIqbal@gmail.com
WhatsApp: +92 345 5274434
1 . On Account Clearing
2. Post with Clearing
On account clearing processes, it is mandatory that both the line items should be present at the time of clearing. But in post with clearing, the new opposite line item is created and simultaneously the other line item is cleared.
In SAP S4 HANA, the cleared document contain line items in "On Account Clearing" where as in SAP ECC, there was no line items in cleared document.
For any consultancy, training or issue, you can contact at the following:
Email: ShahzadAhmedIqbal@gmail.com
WhatsApp: +92 345 5274434
มุมมอง: 214
วีดีโอ
Change in Hosts file to access FIORI launch pad in SAP | FIORI Launch pad is not activating in SAP
มุมมอง 1625 หลายเดือนก่อน
While getting the user and password from services provider on payment basis for training purpose or testing purpose, it has been observed that, initially user is unable to start the FIORI launch pad. When user execute the transaction code /UI2/FLP, the web browser (Google Chrome, MS Internet Explorer or MS Edge) gives the error for non accessing the FIORI services. To resolve this error, user n...
Auto cheque creation with Tcode F-58 in SAP| Payment method configuration for cheque payment in SAP
มุมมอง 63110 หลายเดือนก่อน
Transaction code F-58 is used for creation of payment document and auto creation of cheque from SAP System. For this purpose, it is necessary to configure the outgoing bank clearing account, payment method for cheque and cheque lot in SAP Finance module. When the cheque is created from SAP System, the system automatically clear the vendor invoice against payment document. We should also configu...
Check Lot Creation in SAP FI| Sequential and Non Sequential Check Lot in SAP Finance S4 HANA
มุมมอง 12110 หลายเดือนก่อน
Check lot or cheque book creation for issuance of check from SAP finance system is very important. Without creation of check book, you cannot create the check to vendor or suppliers. There are two types of check book 1. Sequential check book 2. Non sequential check book Normally SAP System does consider the check as check from non sequential check book and it is consider only as informative che...
How to configure Outgoing Cheque Clearing Account in SAP| Outgoing bank clearing account in SAP FI
มุมมอง 14810 หลายเดือนก่อน
In cheque management, the important step is to configure the outgoing clearing General Ledger in SAP S4 HANA. Earlier, the outgoing clearing GL was configured in SAP ECC in transaction code FBZP but now we cannot configure the outgoing clearing GL in configuration. This General Ledger is normally configured against the outgoing payment and Automatic outgoing payment. For any further consultatio...
Cheque Management in SAP FICO| Check Process in SAP Finance| Cheque configuration & Accounts Payable
มุมมอง 14710 หลายเดือนก่อน
Cheque management is part of accounts payable in SAP FI module. The cheque payment is a process to decrease the liabilities that arises due to booking of invoices against vendors and suppliers. Normally, in cheque management process, the clearing account is required and this account is normally named as Outgoing bank / cheque clearing account. For any further consultation, training and opinion,...
Down Payment / Advance Payment in SAP Finance| Special GL indicator in SAP Finance| DP Request
มุมมอง 28110 หลายเดือนก่อน
The Down Payment in SAP Finance is very important functionality to give the advance to the accounts payable (vendors) and account receivable (Customers). While booking the invoice of any customers or vendors, there may be, some time, needs to give the advance to vendors or take the advance from customers to meet the initial requirements of business and financial transaction. For this purpose, S...
Vendor, Customer, GL clearing with each other SAP Finance| Vendor clearing customer & GL| Tcode F-51
มุมมอง 63510 หลายเดือนก่อน
The clearing process is very common and important with respect to all GLs which are selected as open item management. Normally user is aware that how you can clear the vendor with vendor or customer with customer or general ledger with general ledger. But many users are unaware that we can clear the vendor line items with customer line items or gl line item with customer and vendor line items i...
Residual & Partial Payment in F-53 SAP S4 HANA| Vendor Clearing in Account Payable SAP S4 HANA
มุมมอง 18411 หลายเดือนก่อน
There is always confusion between the concept of partial and residual payment in accounts payable module of SAP S4 HANA. The system generate the new line item and does not clear the parent line item in partial payment to the vendor whereas in residual payment the system clear the original document and generate the remaining difference line item's amount. In SAP S4 HANA Finance and Account Payab...
Document type for Ledger in SAP S4 HANA|SAP Posting Key in Finance| Posting key & Doc Type S4 HANA
มุมมอง 20311 หลายเดือนก่อน
The document type is very important component of document structure. The document in SAP Finance has two parts. One part is called the Header of document which is stored in SAP Table BKPF whereas the other part of SAP document is called line items. These two parts of documents are controlled through different components. Document Type controls the header of document whereas the Posting key cont...
Settlement Configuration in Internal Order| Allocation Structure in Settlement in SAP S4 HANA|
มุมมอง 1.3Kปีที่แล้ว
Settlement is very important concept of SAP Controlling (Management Accounting). In this process, the cost of one controlling object is settled / transferred to other costing object e.g. cost center, internal order, general ledger, work break down structure element, fixed asset et.. For settlement, the main component is settlement profile. In the settlement profile, the allocation structure is ...
2. Budgeting in Internal Order| Activate Budget Availability Control 4 Internal Order in SAP S4 HANA
มุมมอง 606ปีที่แล้ว
In this second video, the budget availability control with respect to expenditure is discussed for internal order of SAP Controlling. Budgeting is very important components in different modules of SAP. You can activate and deactivate the budget availability control. Reconstruction of availability control is important functionality for reconciliation of budget with respect to expenditures. In SA...
1. Internal Order & Budgeting in SAP CO| Budget Profile Configuration in Internal Order SAP S4 HANA
มุมมอง 1.7Kปีที่แล้ว
Internal order in Controlling module of SAP S4 HANA is very important for the planning and actual costing. You can use the internal order for planning of cost versus actual cost. You can also use the internal order for Budgeting and estimates purpose. For configuration of Internal order in SAP S4 HANA, You will have to first configure the order type. After configuring the order type, you will h...
SAP GUI Login | Theme Change in SAP S4 HANA| SAP User / Easy Menu| SAP S4 HANA GUI Tips & Tricks
มุมมอง 214ปีที่แล้ว
To learn the SAP, First and important step is to learn how to use the SAP GUI software. Understanding the concept of Client is also very important. After understandin g the Client in SAP S4 HANA, there is need to understand how to navigate the SAP GUI. For this purpose, changing of SAP GUI theme, selecting the color, change the font size etc. is very important. Executing the transaction codes, ...
Currency valuation in Leading Ledger, Non Leading Ledger and Extension Ledger in SAP S4 HANA
มุมมอง 379ปีที่แล้ว
Ledger concept is introduced in SAP ECC and it was matured in SAP S4 HANA. There are mainly three types of ledgers. Leading Standard Ledger, Non Leading Standard Ledger and Extension Ledger. SAP S4 HANA has also brought some new aspects of currency valuation. You can valuate Global currency which is assigned at client level or Index base and Hard currency which is assigned to country code. You ...
Field Status and Number Range in SAP Finance S4 HANA |Field Status Group in GL Master in SAP S4 HANA
มุมมอง 129ปีที่แล้ว
Field Status and Number Range in SAP Finance S4 HANA |Field Status Group in GL Master in SAP S4 HANA
Factory Calendar configuration in SAP| Holidays creation in SAP |Working Days configuration in SAP
มุมมอง 150ปีที่แล้ว
Factory Calendar configuration in SAP| Holidays creation in SAP |Working Days configuration in SAP
Chart of Account in SAP S4 HANA | Retain Earning Account | Table SKA1 & SKB1 | Variant principle
มุมมอง 288ปีที่แล้ว
Chart of Account in SAP S4 HANA | Retain Earning Account | Table SKA1 & SKB1 | Variant principle
6. Cost Estimate w/out Quantity Structure, Additive Cost, Template Allocation in Prod Cost Plan SAP
มุมมอง 1.4Kปีที่แล้ว
6. Cost Estimate w/out Quantity Structure, Additive Cost, Template Allocation in Prod Cost Plan SAP
1. Automatic Payment Program SAP S4 HANA| Data Medium Exchange file format| 3 Data Structures in DME
มุมมอง 469ปีที่แล้ว
1. Automatic Payment Program SAP S4 HANA| Data Medium Exchange file format| 3 Data Structures in DME
5. Cost Component Structure, Price Transfer, Costing & Valuation Variant Product Cost Planning SAP
มุมมอง 1.1Kปีที่แล้ว
5. Cost Component Structure, Price Transfer, Costing & Valuation Variant Product Cost Planning SAP
4 Routing, Costing Variant, Valuation Variant, Costing Sheet in Product Cost Planning of SAP S4 HANA
มุมมอง 1.7Kปีที่แล้ว
4 Routing, Costing Variant, Valuation Variant, Costing Sheet in Product Cost Planning of SAP S4 HANA
3 BOM, Secondary Cost Element, Activity & Work center configuration for Product Cost Planning in SAP
มุมมอง 1.3Kปีที่แล้ว
3 BOM, Secondary Cost Element, Activity & Work center configuration for Product Cost Planning in SAP
Petty Cash Journal in SAP S4 HANA | Petty Cash GL Creation in SAP S4 HANA| FBCJ in SAP S4 HANA
มุมมอง 617ปีที่แล้ว
Petty Cash Journal in SAP S4 HANA | Petty Cash GL Creation in SAP S4 HANA| FBCJ in SAP S4 HANA
2. Sales Area, Plant, Credit Control Area Configuration in SAP Sales & Distribution| SAP SD Training
มุมมอง 217ปีที่แล้ว
2. Sales Area, Plant, Credit Control Area Configuration in SAP Sales & Distribution| SAP SD Training
1. Sales & Distribution Training on SAP S4 HANA | Enterprise Structure for SD | Number Range in SAP
มุมมอง 223ปีที่แล้ว
1. Sales & Distribution Training on SAP S4 HANA | Enterprise Structure for SD | Number Range in SAP
2. Moving Average & Standard Price Concept in SAP S4 HANA| Posting Period in SAP MM| Material in SAP
มุมมอง 1.9Kปีที่แล้ว
2. Moving Average & Standard Price Concept in SAP S4 HANA| Posting Period in SAP MM| Material in SAP
1- What is Product Cost Planning in SAP S4 HANA |SAP Product Costing| BOM, Routing, Costing Variant
มุมมอง 6Kปีที่แล้ว
1- What is Product Cost Planning in SAP S4 HANA |SAP Product Costing| BOM, Routing, Costing Variant
Open & Close Posting Period in SAP | Manage Posting Period in FIORI APP| Posting Period Variant
มุมมอง 432ปีที่แล้ว
Open & Close Posting Period in SAP | Manage Posting Period in FIORI APP| Posting Period Variant
Detail Configuration of Document Splitting in SAP S4 HANA | Zero Balance GL in Doc. Splitting in SAP
มุมมอง 551ปีที่แล้ว
Detail Configuration of Document Splitting in SAP S4 HANA | Zero Balance GL in Doc. Splitting in SAP
SIR YEH CHOTI CHOTI BAT NEW MEMBER KO BAHUT DISTURBE KARTI HAI THANKS AAP BAHUT HELP KIYE BEST VIDEO THANKS SIR CAN YOU HELP ME TO SOLE SOME ERROR PLEEES
Can we directly post journal entry on alternative account which is created under company chart of accounts?
Nice Sir
Incomplete Video- CK11N not working
bhai yeh number show karwaanay ki setting bata dein please BP se pehlay number hai customer se pehlay number hai yeh wali setting
Thank you for sharing
Super explanation sir
mashaALLAH excellent way of making me understand like a teacher. i practised it and it was really helpful.
Thanks...
Itne behtreen teacher k just 1k subscribers, the way you teach and clear the concepts deeply, you deserve more respected sir. Appreciated.
Thanks a ton
Hi ! Are you providing training? I am interested please let me know how to reach you
Sir what is use of differntiation type in bp category kindly explain
A role grouping category can be assigned to no more than one BP role grouping. The role grouping category makes it possible for SAP and customer programs to program on the BP role grouping.
Hello, i have business scenario that, 10 business user are posting fi transaction in current period. Meanwhile, senior person want to post jv in prior month. Then we have to open prior period up to current month (july to Aug). Then, how system will allow to all user to postin in current month ( Aug) and system should allow to posting prior month via senior person without stop the posting at that time As well as, no one can post fi Posting in prior month..
you will not open consective periods from July to Aug. You should open the August Period in one interval where there is no need for Authorization group. You will open July in other interval and use the authorization group and assign the authorization group to specific user.
Ilada kya mtlb
Dear Friends, Let me ask this situation: Suppose I take 50 million from the total promotion budget for discount promotion and 100 million for promotion program, I want to find an object to contain the budget of 50 million and 100 million and at the same time monitor the use of this budget, after the program ends, I will evaluate the effectiveness and reconcile the actual amount into the total promotion budget. Can Internal Order support?. Thanks.
In this scenario, you will have to use the project system budgeting module because in Project system budgeting, you can use the Rlease budget functionlaity against total budget. According to your requirement, 50 million budget will be extracted from total budget and 100 million will also be extracted. You can use Rlease Budget feature against total budget (Origianl Budget + Supplement Budget - Return Budget, +-transfer budget).
@@shahzadahmediqbalsapsoluti2196 , Sir Please share Product Costing lecture
Dear Friends, Let me ask this situation: Suppose I take 50 million from the total promotion budget for discount promotion and 100 million for promotion program, I want to find an object to contain the budget of 50 million and 100 million and at the same time monitor the use of this budget, after the program ends, I will evaluate the effectiveness and reconcile the actual amount into the total promotion budget. Can Internal Order support?. Thanks.
In this scenario, you will have to use the project system budgeting module because in Project system budgeting, you can use the Rlease budget functionlaity against total budget. According to your requirement, 50 million budget will be extracted from total budget and 100 million will also be extracted. You can use Rlease Budget feature against total budget (Origianl Budget + Supplement Budget - Return Budget, +-transfer budget).
In 5 vedio bike product costing is over in 6 video is other vedio
Agar bil galat ho gaya use kese tik kare
You can reverse it, if the document is posted...
@@shahzadahmediqbalsapsoluti2196 reverse kar diya par usme show ho raha h use kese hatye
Hello sir I am from India Your explanation so impressive Keep share the knowledge Thanks
So nice of you
Thanks... I was facing issue but now it is very clear
Happy to help
Asalam Walaikum Sir it's not working kindly guide me if there is any solution.
@arshadalishaikh4171. Can you send me the detail steps that you are executing or send me the errors screenshots
@@shahzadahmediqbalsapsoluti2196 Follow the instructions in Note 487381 before initialization Message no. MM016 Diagnosis You want to run the period initialization program. Note that when you start the period closing with initialization, inconsistencies can arise. Procedure Note 487381 describes the possible data inconsistencies that can occur if you perform initialization in a productive system. The inconsistencies cannot be traced back to a system error, but instead the period closing with initialization. Therefore, these inconsistencies can only be cleared by using the chargeable remote consulting service. This is because in releases higher than 4.5, the period closer does not normally have to be started with initialization.
@@shahzadahmediqbalsapsoluti2196 Sir I followed all your steps, but I'm still getting the mention error.
Good
So nice
Very informative and important video
Glad you think so!
Please make a video of Actual costing scenarios
Thank you very much sir..❤ thank you so much
Thank you so much Brother!!!
Thanks for appreciating....
Very Nice explanation!!!! Explanation in mother tongue language like Urdu or Hindi is always best❤❤
Thanks for appreciating videos especially in Urdu language....It is my national language.
Mere FB70 posting mey( Global Official Numbering Input Parameter Incomplete).Error aa ra hey kindly help, Not able to post
Very useful, Thanks I am from India....👋
Welcome!
I have Followed Every step But still it's not working for me
Please send me your screen shot step in word or excel file.....
Thank you so much Sir
So nice of you
Voice and video are different
I think the video and voice is same because I personally made it..........
Thanks very informative video
My pleasure
Great Information Sir, It helps me.
Happy to help
I am searching for the scenario only….thanks
F-02 p b ye gl restrict hjy ga auth group se?
Yes....It controls every transaction entry screen..
Good brother
Thanks.....adeel
Thanks brother
Hiii, I would really appreciate if you could make/share a video on mass creation of GL accounts for FSP0 transaction via LSMW? Thankyou in advance!
Noted...
How do I add tab “exclude single value “ tab? Mine has only one tab.
Can you send me detail screen short in word or excel file where you are facing single tab.
Where to find tax code list in sap
Very Nice Video brother keep it up
Sir, How can we enter multiple line item like entertainment, Stationery with a single document number, plz.
Does cost estimate with quantity structure included routing ?
Hi sir..Thanks for video... is this Authorisation object restrict only FI side postings or MIRO /FI document also restrict...becuase we are facing some issues like,, business FI team posting correction entries in previous period by opening period in OB52 but in same time MM team postings MIRO document in previous period which is only allowed for FICO team as we assinged FICO authorisation group in OB52...Please let us know how to restrict MM user to post in previous periods which is open in OB52 with FICO authorization group....
MM posting period is dependent on FI posting period. If user has no authorization to post in FI posting, then how he can post from MM to FI because every entry which is posted through MM, ultimately will post in FI side. Can you send me the detail scenario in word or excel to my email address.
Good lecture
Keep going on you are doing great Sir
Thanks for creating videos related to cheque management
Good step for creating videos in serial and small size
ML and COPA ki configuration ki video to be made sir Advance (Thanks)