INSTINCT EXPLORER
INSTINCT EXPLORER
  • 9
  • 40 194
Tour-de-Dakshin Bharat, A travel series of Southern part of India (EPISODE-2)
Day 2 of tour de dakshin Bharat is commenced with visit of Lord Veera venkat satya narayana swamy at Annavaram followed by a long drive through NH16 to Satelite launching center, Sriharikota, A P and further up to Vandalore out skirt of Chennai Ring road covering 745km approx. Journey took place morning 1100hrs to 2200hrs night.
Visiting place: Annavaram temple, Andhra Pradesh, Model park at Sriharikotta, Andhra pradesh with a nice Night stay at Rajendra inn at vandalore.
มุมมอง: 117

วีดีโอ

Tour-de-Dakshin Bharat , A travel series of Southern part of India (Episode-1)
มุมมอง 19311 หลายเดือนก่อน
First video of a travel series "Tour-de-dakshin Bharat" with A "2016 Duster" covering a total distance of 5400kms in just 15 dayz. This video starts at the begining upto end of Day-01 at Veera Venkat satyanarayan swamy vari devasthanam temple, Annavaram, Andhra Pradesh. The temple built on the hill of "Ratna giri" at Annavaram, Kakinada district of A.P by a Zamindar Raja Rama narayan during 189...
Tips to maintain Turbo Diesel or Petrol cars for long run.
มุมมอง 147ปีที่แล้ว
Idle rule being explained towards a malfunction free Turbo charger for a diesel or, petrol driven car. Info: 1. Most Turbo charged engine engages turbo at 1600 to 2000rpm. 2. Though rotation of turbo charger is 1,50,000 RPM, It requires at least 3-5 minutes to halt. 3. If engine stops, oil pump stop supplies oil to turbo charger with in 1/2 - 1 minutes. 4. This proves, turbo charger rotates 3-5...
Exploring Viaducts and Extreme Terrain in Raipur-Vizag Expressway #youtube #bharatmala#explore
มุมมอง 16Kปีที่แล้ว
Extreme terrain section (23km) of Raipur-Visakhapatnam Expressway passing through Eastern ghat of India, which located between Kandili and Tumbigura in Odisha is under construction by Max Infra Ltd. under package OD-08. This section have 01 no. mamoth tunnel (2870m) with 10 viaducts, 10 animal passes, 05 monkey canopies, many hill cuttings with a design speed of 100kmph throughout the terrain. ...
FIRST HIGHWAY TUNNEL OF ODISHA ON RAIPUR-VISHAKHAPATNAM ECONOMIC CORRIDOR (NH130CD)#youtube #explore
มุมมอง 24Kปีที่แล้ว
This tunnel being constructed in Raipur-Vizag expressway NH-130 CD under 'BHARATMALA Pariyojna' package no. OD-07 between Baraja and Kandeli in KORAPUT dist. of ODISHA near Sunki ghat. This construction is being carried out by DRAI Constructions using South Korean Technology. This twin tunnel will be of 3.42 km with 3 lanes each with Advance Traffic management system (ATMS).This will be complet...
Explore hand sanitising against Novel Corona virus (ଓଡ଼ିଆ)
มุมมอง 944 ปีที่แล้ว
ହାତ ସଫା ଶୈଳୀ
Tarak sings "Shiv prathrana" during jungle treck to "Badudi paar".
มุมมอง 22010 ปีที่แล้ว
Tarak sings "Shiv prathrana" during jungle treck to "Badudi paar".
MITU CHAND and TARAK exploring "BADUDIPAAR"
มุมมอง 7310 ปีที่แล้ว
The place situated at a radious of 10km of Gupteswar a famous "shiv temple" in the southern part of odisha bay of Savari river.
Mitu chand exploring KONARK on "White shark"
มุมมอง 10410 ปีที่แล้ว
AT Konark on sea ODISHA