- 20
- 874
A10 Crew Chief
เข้าร่วมเมื่อ 15 ม.ค. 2020
Spear Home Site, Butler TN (Part 2)
Drainage tubing and gravel has been installed around the perimeter of the footing.
Also, the septic tank has been set in place.
Also, the septic tank has been set in place.
มุมมอง: 21
วีดีโอ
Spear Home Site, Butler TN
มุมมอง 262 หลายเดือนก่อน
The footers are in for the house and garage. The utility pole, with 40 watt light, has been installed and connected to the power pole across the street on Old Hwy 67.
Thank you a 10 crew chief I really enjoyed the rodeo❤