Refurbishment Mastery with Martin Rapley
Refurbishment Mastery with Martin Rapley
  • 235
  • 105 274
005 - Planning drawings -V- Building Regulation drawings
Do you know the difference? Do you know why planning drawings aren’t really of any use to a builder?
Stay tuned and ensure that you are presenting yourself credibly to your builders.
PLUS learn the connection with a chocolate cake recipe.

Martin has been supporting property investors with their refurbishments since 2012 and he’s here to support you as well. Whether you just need an answer to a question or want to chat through the ways he can work with you then just book a FREE call on this LINK
If you want to get started then Martin’s book The Refurbishment Handbook is for you, grab your FREE copy now.
For more FREE tips and advice look for Refurbishment Mastery with Martin Rapley on Facebook and You Tube
Martin is also on Facebook and LinkedIn
มุมมอง: 17

วีดีโอ

005 - Planning drawings -V- Building Regulation drawings
มุมมอง 619 ชั่วโมงที่ผ่านมา
Do you know the difference? Do you know why planning drawings aren’t really of any use to a builder? Stay tuned and ensure that you are presenting yourself credibly to your builders. PLUS learn the connection with a chocolate cake recipe. Martin has been supporting property investors with their refurbishments since 2012 and he’s here to support you as well. Whether you just need an answer to a ...
Different types of schedule of works finance and builders
มุมมอง 25หลายเดือนก่อน
Different types of schedules of works are essential for both finance and builders. For finance, detailed cost breakdowns and timelines help manage budgets. For builders, specific task lists and deadlines ensure efficient project execution. Learn how to invest wisely and enhance your property's value in our FREE guide at www.refurbishmentmastery.com . 🏡💡 #ScheduleOfWorks #ProjectPlanning #Proper...
What is the price per square meter
มุมมอง 45หลายเดือนก่อน
What is the price per square meter
Refurbishing A Commercial Unit
มุมมอง 10110 หลายเดือนก่อน
Refurbishing A Commercial Unit
Touch Points With Your Builder
มุมมอง 5210 หลายเดือนก่อน
Touch Points With Your Builder
Don't spend too much on a commercial unit
มุมมอง 3510 หลายเดือนก่อน
Don't spend too much on a commercial unit
When A Structural Engineer Is Better Than A Mortgage Survey
มุมมอง 8710 หลายเดือนก่อน
When A Structural Engineer Is Better Than A Mortgage Survey
Unpacking the letter you've received from building control
มุมมอง 4010 หลายเดือนก่อน
Unpacking the letter you've received from building control
Don't overdesign your hot water system
มุมมอง 3011 หลายเดือนก่อน
Don't overdesign your hot water system
Why Your Builder Doesn’t Want You To Visit
มุมมอง 13911 หลายเดือนก่อน
Why Your Builder Doesn’t Want You To Visit
How To Avoid A 3 Month Delay In Your Project
มุมมอง 67ปีที่แล้ว
How To Avoid A 3 Month Delay In Your Project
Understand Your Project In 3 Dimensions
มุมมอง 87ปีที่แล้ว
Understand Your Project In 3 Dimensions
Increasing Value of Flat Refurbishment
มุมมอง 183ปีที่แล้ว
Increasing Value of Flat Refurbishment
The Economics Of Refurbishment In 2022
มุมมอง 116ปีที่แล้ว
The Economics Of Refurbishment In 2022
3 Phase Electric Supplies
มุมมอง 48ปีที่แล้ว
3 Phase Electric Supplies
Don’t Let Your Plumber OVER DESIGN Your Hot Water System
มุมมอง 60ปีที่แล้ว
Don’t Let Your Plumber OVER DESIGN Your Hot Water System
Avoid Paying Your Builder Up Front
มุมมอง 118ปีที่แล้ว
Avoid Paying Your Builder Up Front
Management Of Risk In Construction Projects
มุมมอง 65ปีที่แล้ว
Management Of Risk In Construction Projects
Managing and Removing Asbestos
มุมมอง 44ปีที่แล้ว
Managing and Removing Asbestos
Green Energy For Your Home
มุมมอง 50ปีที่แล้ว
Green Energy For Your Home
When Your Builder Can't Start Straight Away
มุมมอง 66ปีที่แล้ว
When Your Builder Can't Start Straight Away
When Your Builder Can't Start Straight Away
มุมมอง 75ปีที่แล้ว
When Your Builder Can't Start Straight Away
Working With Recommended Contractors
มุมมอง 38ปีที่แล้ว
Working With Recommended Contractors
Who Is Putting Together Your JCT Contract
มุมมอง 826ปีที่แล้ว
Who Is Putting Together Your JCT Contract
How to Write Your Schedules of Work
มุมมอง 253ปีที่แล้ว
How to Write Your Schedules of Work
Typical Price Per Square Metre For A C2R
มุมมอง 108ปีที่แล้ว
Typical Price Per Square Metre For A C2R
How To Find A Builder (Four Ways)
มุมมอง 178ปีที่แล้ว
How To Find A Builder (Four Ways)
Never Pay Too Much For A Property
มุมมอง 109ปีที่แล้ว
Never Pay Too Much For A Property
Process Of Getting Prices From Contractors (How to Manage)
มุมมอง 161ปีที่แล้ว
Process Of Getting Prices From Contractors (How to Manage)

ความคิดเห็น

  • @Pete_Sam
    @Pete_Sam 8 วันที่ผ่านมา

    Very helpful, and interesting points about obstructions and hidden issues on sites 👍🏻

  • @moncefecw3131
    @moncefecw3131 10 วันที่ผ่านมา

    True enough thanks for advice

  • @victorhechavarria9536
    @victorhechavarria9536 24 วันที่ผ่านมา

    Thank you so much for the tips, Martin!

  • @cancer2361964
    @cancer2361964 25 วันที่ผ่านมา

    how do you plan a kitchen which has been moved into a dining room

    • @martin-rapley
      @martin-rapley 24 วันที่ผ่านมา

      The easiest way, if you haven't done it before, is to take the room dimensions to one of the kitchen companies and use their scheme as a starter. Make sure you also know where the drainage is as that can affect the location of the sink

  • @cancer2361964
    @cancer2361964 25 วันที่ผ่านมา

    what is the difference between a schedules and a tender pack. do you have a document to do a tender pack or a website on how to construct one.

  • @cancer2361964
    @cancer2361964 25 วันที่ผ่านมา

    what do you do if you have to use a jv partners builder. how do i get to know the builder.

    • @martin-rapley
      @martin-rapley 24 วันที่ผ่านมา

      The more you meet them then the more you will know them. It would be good to meet them before they are even appointed but that comes down to the agreement that you have with your JV partner to some extent.

  • @Random-Spartan
    @Random-Spartan 29 วันที่ผ่านมา

    I don’t get it

  • @RefurbishmentMastery
    @RefurbishmentMastery หลายเดือนก่อน

    Hi everyone! Check out our website and follow our social media platforms for more tips about property refurbishment. You may also book a free 20 minute discovery call via telephone with Martin at calendly.com/martinrapley/free-call

  • @RefurbishmentMastery
    @RefurbishmentMastery หลายเดือนก่อน

    Hi everyone! Check out our website and follow our social media platforms for more tips about property refurbishment. You may also book a free 20 minute discovery call via telephone with Martin at calendly.com/martinrapley/free-call

  • @RefurbishmentMastery
    @RefurbishmentMastery หลายเดือนก่อน

    Hi everyone! Check out our website and follow our social media platforms for more tips about property refurbishment. You may also book a free 20 minute discovery call via telephone with Martin at calendly.com/martinrapley/free-call

  • @cancer2361964
    @cancer2361964 หลายเดือนก่อน

    what do you do if the pp is low and the gdv is low what do you do then

  • @cancer2361964
    @cancer2361964 หลายเดือนก่อน

    have you got a video on how to deal with landscapers

  • @cancer2361964
    @cancer2361964 หลายเดือนก่อน

    how do you get a builder to work for a fixed contract or instalments payments. how do you negiograte for them to do these payment methods

    • @martin-rapley
      @martin-rapley หลายเดือนก่อน

      I tell all builders that I want a fixed price quote based upon my schedule of works. If they won't price on that basis then they are the wrong builder for me. Payment terms are by negotiation, if you can't get what you want then they are the wrong builder.

  • @cancer2361964
    @cancer2361964 หลายเดือนก่อน

    how can you sell a property quickly. how do you make quick decisions. how do you make cost effective decisions when it comes to finishes and where to go

    • @martin-rapley
      @martin-rapley หลายเดือนก่อน

      To secure an offer quickly you may need to set the price just below your competition, unfortunately no matter how quickly you secure an offer there is still the conveyancing process wich can often be 3-4 months. Making the right decisions as far as the finishes comes down to knowing your end client (the person buying the property). Don't do works that are unnecessary for that client unless you can be really sure that they add more value.

  • @cancer2361964
    @cancer2361964 หลายเดือนก่อน

    i have a smal yard. how can i add value to it without going over board. how much do you think a garden of 4x4 should cost and what should i include in the space.

    • @martin-rapley
      @martin-rapley หลายเดือนก่อน

      If you are planning to sell then make sure the walls/fences are in reasonable condition and then dress it with some coloured potted plants. Walls and fences in poor condition can be improved just by painting them. The key thing to remember is that in most cases purchasers are making their decision on the property not the garden so don't spend too much.

  • @SpectiveEnterprises
    @SpectiveEnterprises 2 หลายเดือนก่อน

    Best video I’ve seen on the subject, thanks!

  • @mariakneale4153
    @mariakneale4153 2 หลายเดือนก่อน

    Thank you for this video. I totally agree, it's a simple differentiation but if I learned the hard way to not consider this on a refurb / extension project and ended up being quite stressed at the end as I was effectively carrying out both roles plus decorating, floor laying, etc. A hard lesson, the project was successful overall but these are very important roles to define and allocate prior to instructing contractors.

  • @mariakneale4153
    @mariakneale4153 3 หลายเดือนก่อน

    Great advice many thanks

  • @PeterHall-g6z
    @PeterHall-g6z 3 หลายเดือนก่อน

    Great explanation, would a JCT be required on small scale projects

    • @martin-rapley
      @martin-rapley 2 หลายเดือนก่อน

      With smaller projects the risks are lower so it becomes too expensive and onerous to use a JCT contract. The important thing with a small project is that you still agree terms of business between you and your builder.

  • @abdullahk8691
    @abdullahk8691 3 หลายเดือนก่อน

    These days my local council specify how many people are allowed to be in each room on the licence.

    • @17tsgb
      @17tsgb 3 หลายเดือนก่อน

      In many ways the licencing process came about because there was a lack of clarity in the building regulations and too many people were repurposing properties without providing basic standards. Overcrowding was one of these issues which is why they now have minimum room sizes and amenity space for HMOs. Understanding the licencing requirements allows you to proactively present a property to the LA demonstrating that it is compliant rather than leaving the decision to the housing officer. I have an HMO where it looks like the amenity space is too small for the number of occupants, however by showing that some rooms are large enough to be bedroom/living rooms, the shared space can be smaller. We got 2 extra occupants as a result of us taking the lead rather than leaving it to the housing officer.

  • @abdullahk8691
    @abdullahk8691 3 หลายเดือนก่อน

    Thanks for the video

  • @DavidSmith-do6ji
    @DavidSmith-do6ji 4 หลายเดือนก่อน

    What would be you view on electricity supply when splitting one house into two flats (say two small two bedroom flats?) I’m guessing the might be a need for a separate supply? I have never thought about this so thank you for drawing our attention to this point.

    • @martin-rapley
      @martin-rapley 4 หลายเดือนก่อน

      The benefit of bringing in a new supply is that you create 2 stand alone units that can be valued and sold independently. If both units run from one supply then you need to consider how bills are managed and accept that the 2 units probably have to stay in one ownership. This will also be the case with water supplies.

  • @williamhallam6591
    @williamhallam6591 5 หลายเดือนก่อน

    Thanks for clarifying. My broker gave me a "schedule of works" form from the lender: Schedule of Works section being 10 lines/rows with 3 column headings, Description, Timeframe, Cost (incl.vat) and at the top in the Borrower Details section fields for Applicant/Company Name, Property address, GDV (Gross Development Value).

    • @martin-rapley
      @martin-rapley 5 หลายเดือนก่อน

      That's good, it's exactly what you need at the early stage of a loan application.

  • @reneshay889
    @reneshay889 5 หลายเดือนก่อน

    Good job!!!

  • @adamwrigh8805
    @adamwrigh8805 6 หลายเดือนก่อน

    Whats the legislation please

    • @martin-rapley
      @martin-rapley 6 หลายเดือนก่อน

      The link in the post below is still the current document.

  • @christianstill.6654
    @christianstill.6654 7 หลายเดือนก่อน

    How do you present this to a builder?

    • @martin-rapley
      @martin-rapley 7 หลายเดือนก่อน

      Personally I don't JV with builders and I don't recommend it as explained in the video

  • @dannymurphy1779
    @dannymurphy1779 8 หลายเดือนก่อน

    Great video Martin. I think there is another learning here in that with commercial lending you need substantial funds to be able to get to the stage where you can call on the drawdown funds, you can't be relying on contractors to fund the gap for you! You have to have skin in the game or builders will become nervous about your ability to pay, which seems to be what happened here. You are very likely going to be looking at much higher quotes too.

    • @martin-rapley
      @martin-rapley 8 หลายเดือนก่อน

      Hi Danny. On larger projects where more established contractors are employed it is totally possible to place them on back to back terms with the lender and indeed that is effectively the terms within the JCT Forms of Contract. As you note these larger contractors do have higher overheads so may be more expensive so you have to balance one benefit against the other. I find that showing contractors the agreement from a bank to lend is generally sufficient to demonstrate funds, the key is agreeing the terms in good time.

  • @Habdle_helper
    @Habdle_helper 8 หลายเดือนก่อน

    Thank you for the information

    • @martin-rapley
      @martin-rapley 8 หลายเดือนก่อน

      Thanks for watching

  • @tomasomaher
    @tomasomaher 8 หลายเดือนก่อน

    Is it possible to change the interior of a large listed building from a 5 bedroom house to let’s say two apartments but keeping the exterior the same? Or is this something that is a non starter? Thanks

  • @MrBaros33
    @MrBaros33 9 หลายเดือนก่อน

    Thanks, very good shared experience and helps to deal with the "gut reaction" of just walking away at the first sign of subsidence.

  • @mattmck1929
    @mattmck1929 9 หลายเดือนก่อน

    big love martin

  • @JackMason-kn2hm
    @JackMason-kn2hm 9 หลายเดือนก่อน

    Hi. I currently offer planning application drawings for clients purely for passing the planning application process. My knowledge is very limited in terms of building control/regulations. Would you know if there's a course available which would help me offer a full building regulation drawing to my clients?

  • @mdmajibarsekh6063
    @mdmajibarsekh6063 9 หลายเดือนก่อน

    Your channel is good. Your videos are very nice, but you are not getting regular likes, comments and your subscribers are not increasing. If you want I will give you my best work and show your channel work. First of all I am not asking you for money. I will do your work, you give me money later, no problem. I am a professional Digital marketer and TH-cam expert. Thank you.

  • @Hew.Jarsol
    @Hew.Jarsol 9 หลายเดือนก่อน

    Yes this makes sense.

  • @theforexcodes8133
    @theforexcodes8133 10 หลายเดือนก่อน

    Would it be possible to just convert the ground floor commercial unit to a residential flat too?

    • @martin-rapley
      @martin-rapley 10 หลายเดือนก่อน

      There are more planning conditions around these at the moment, particularly if the property is in a retail area. The most important thing to keep in mind is that the minimum space standards require flats to be 37m2 so if your commercial unit isn't of that size then at the moment it can't be converted.

  • @dannymurphy1779
    @dannymurphy1779 10 หลายเดือนก่อน

    Excellent stuff Martin. Do you have to put a heating system in or is it best left at that stage???

    • @martin-rapley
      @martin-rapley 10 หลายเดือนก่อน

      I wouldn't put anything in as tenents require different things. Some will require radiators and some will go with a combined air conditioning and heating system for example.

  • @eamonhannon1103
    @eamonhannon1103 10 หลายเดือนก่อน

    What is the ideal footprint for HMO ?

    • @martin-rapley
      @martin-rapley 10 หลายเดือนก่อน

      It will be difficult to get a 5 bedroom HMO from a property that is less than 100m2 (approx 1000 sq ft). Look for properties with a living room and dining room downstairs where the kitchen has been extended plus 3 x bedrooms and a bathroom upstairs. You may need an extra bathroom downstairs so scope to extend a cloakroom or convert a utility room will be useful.

  • @eamonhannon1103
    @eamonhannon1103 10 หลายเดือนก่อน

    Yes this is a huge issue that is often glossed over .

  • @dannymurphy1779
    @dannymurphy1779 10 หลายเดือนก่อน

    Thanks, a lot of info in one minute! Would love to see a longer video on this if you get the time.

  • @ErnaSolbergXXX
    @ErnaSolbergXXX 11 หลายเดือนก่อน

    If you have contractors you have to make random visits to the site. Too many of them don't deserve to be trusted.

    • @martin-rapley
      @martin-rapley 11 หลายเดือนก่อน

      With suitable due diligence in advance and therefore careful selection of the contractor you will find that they don't need random visits and can be trusted. On the flip side though, it's frequently the cheapest contractors that cause problems so you have to decide which is the most important to you - reliability or price.

    • @RefurbishmentMastery
      @RefurbishmentMastery 10 หลายเดือนก่อน

      Hi , thank you for sharing your insights. You may visit our Facebook Page here facebook.com/refurbishmentmastery/ for more updates and information on Property refurbishments. Cheers!

  • @c_currency
    @c_currency 11 หลายเดือนก่อน

    Great insights Martin. Thank you for sharing this and all the content on your channel

  • @odinairsoftuk9809
    @odinairsoftuk9809 ปีที่แล้ว

    Hi! What about using a grade 11 listed flat above a shop as serviced accommodation? Do you suppose the local authority would have an issue?

    • @martin-rapley
      @martin-rapley ปีที่แล้ว

      There isn't a difinitive answer to this. In theory, you require planning permission to use a property for SA on a long term basis and I believe that the conservation team will be made aware of this application even though it probably doesn't affect the fabric of the building. I'm aware that a lot of SA operators don't apply for planning and that there are also plans for this legislation to be changed so it could be something to deal with in the future. My advice is to go into the deal with your eyes open, ultimately you are working with a listed building that has the risks discussed in the video.

  • @yantsang2064
    @yantsang2064 ปีที่แล้ว

    it truly needs a lot of hard work to make the project right :0

  • @Happytruth
    @Happytruth ปีที่แล้ว

    Problems are when you survey your neighbours house if their room walls are covered in wallpaper you are then not surveying anything unless you strip the paper so it is not clean cut!

  • @Shenellb
    @Shenellb ปีที่แล้ว

    Really great video, highly informative 😊

  • @AdilQureshi-z8s
    @AdilQureshi-z8s ปีที่แล้ว

    Hi! Where is the best place to find a project manager? Also - who tend to be the best project managers for a brrr? Some say building surveyors do it best, some say Quantity surveyors. Thanks!!!

    • @martin-rapley
      @martin-rapley ปีที่แล้ว

      If you can't find a dedicated PM then either of the others will be able to do it for you. I would expect more Building Surveyors to be interested though.

  • @Kilex6522
    @Kilex6522 ปีที่แล้ว

    Hi, Have you received my emails? Thanks

  • @Kilex6522
    @Kilex6522 ปีที่แล้ว

    Hi Martin, Is a Schedule of works the same as sequence of works? Thanks

    • @martin-rapley
      @martin-rapley ปีที่แล้ว

      No, the schedule of works sets out in detail the actual works that you require to be carried out. The sequence of works is the order that those works will be carried out and could be broken down into more detail. For instance your schedule of works may include the details relating to a new kitchen installation (units, worktops, appliances, tiling etc), the sequence of works will then show what order the works need to be done in - 1) modify plumbing, 2) modify electrics, 3) install cupboards and worktops, 4) install appliances, 5) wall tiling, 6) connect services. Please note that this is a simplified example only, there are frequently more things to consider.

  • @sanjaypatellik3666
    @sanjaypatellik3666 ปีที่แล้ว

    Can you share structure engineer contact in West Midlands

    • @martin-rapley
      @martin-rapley ปีที่แล้ว

      Hi Sanjay, I'm based in Kent so don't have any experience of Engineers in the west Midlands