- 22
- 3 897
Daily Electricals
Ghana
เข้าร่วมเมื่อ 6 ต.ค. 2023
I’m an Electrician and loves to show What I do to the world.
Knowing Electrical Safety.
How To Work With Basic Electrical Gadgets And Equipments.
How To Change Spoilt Plugs, Sockets, Switches, Fan Regulators, Bulbs.
Tracing Minor Electrical Faults.
Basi CCTV Camera Installation.
Etc....
Knowing Electrical Safety.
How To Work With Basic Electrical Gadgets And Equipments.
How To Change Spoilt Plugs, Sockets, Switches, Fan Regulators, Bulbs.
Tracing Minor Electrical Faults.
Basi CCTV Camera Installation.
Etc....
A Simple way To Replace A Faulty Socket.
How To Replace A Faulty Socket.
#electrician #electrical #electronic #electricalengineering #electricalwork #wiring #how #howto #tutorial #homeimprovement #doityourself #home #homewiring #housewiring #renovation #learnwithme #electricalsafety #safety
#electrician #electrical #electronic #electricalengineering #electricalwork #wiring #how #howto #tutorial #homeimprovement #doityourself #home #homewiring #housewiring #renovation #learnwithme #electricalsafety #safety
มุมมอง: 15
วีดีโอ
Thank You All And A Happy New Year. #new #newyear #2025 #thanks #youall
มุมมอง 54 ชั่วโมงที่ผ่านมา
A Little Thank You To All My Subscribers. THANK YOU. #thankyou #thanks #thanksforwatching #thankyouforwatching #happy #happynewyear #happynewyear2025 #mysubscriber #mysubscribers #2025 #new #newyear
Single Phase Part 2&3 #electrician#electricitymeter#installation#meterconnection#singlephase
มุมมอง 4419 ชั่วโมงที่ผ่านมา
Single Phase Meter Installation Part 2&3 We Wish You a Merry Christmas by Twin Musicom is licensed under a Creative Commons Attribution 4.0 license. creativecommons.org/licenses/by/4.0/ #electrician #electricitymeter #installation #meterconnection #powermeter #singlephasemeter #meterinstallation
Single Phase Meter Installation Part 1
มุมมอง 4514 วันที่ผ่านมา
Part 1 of the longest meter installation I've ever done, it took me two days for a complete work. #electrician #electricitymeter #installation #meterconnection #electricity #singlephasemeter #meterinstallation #part1 #part01 Fluffing a Duck by Kevin MacLeod is licensed under a Creative Commons Attribution 4.0 license. creativecommons.org/licenses/by/4.0/
Installing Outside Lights.
มุมมอง 2421 วันที่ผ่านมา
Installing Panel Lights On The Wall And Building. #electrician #installation #electricity #lights #outsidelights #panellight #fixing
Single Phase Installation On Containers.
มุมมอง 3628 วันที่ผ่านมา
Installing Meters For Container Shops. #electrician#electricalcontractor#electricitymeter #installation#meterconnection#powermeter#electricity#singlephasemeter#containers #container#containerstore#meterinstallation.
Installing 3 Single Phase Meters
มุมมอง 82หลายเดือนก่อน
Installation Of 3 Single Phase Meters Alone Under The Hot Sun. #electrician,#electricitymeter,#meterconnection,#powermeter,#installation,#electricity,#singlephasemeter,#alone.
Installation Of 2 Single Phase Meters
มุมมอง 73หลายเดือนก่อน
Installing 2 Single Phase Meters For A Shop And House. #electrician,#installation,#electricitymeter,#electrical,#meterconnection #electricity,#singlephasemeter
I Bought Myself A Cheap Tripod
มุมมอง 17หลายเดือนก่อน
I bought it to help record detailed videos, What do you think about this Tripod ? #tripod #tripodforyoutubevideos #tripodforphone #tripodforyoutubers #gadgets #cheap
Wall Lights Installation, No Comment
มุมมอง 16หลายเดือนก่อน
Installing Wall Lights in Church Building #installation, #electrician, #electrical, #walllights, #nocommentary, #lights
Day in the life of an Electrician
มุมมอง 117หลายเดือนก่อน
What I do as an Electrician (before i start installation) #installation,#electrician,#meterconnection,#electrical,#dayinthelife,#dayinmylife,#day,#shortday
Single Phase Meter Installation.
มุมมอง 1.1K2 หลายเดือนก่อน
Installing 5 Single Phase Meters, got help from my Colleagues. #installation,#meterconnection,#electrical,#electricity,#electrician,#meter,#ghana. instagram@fsb_richi
5 Single Phase Meter Installation Alone.
มุมมอง 1962 หลายเดือนก่อน
5 Single Phase Meter Installation Alone.
Three Phase Meter Installation, A Short One On How The Three Phase Meter Is Installed…
มุมมอง 303 หลายเดือนก่อน
Three Phase Meter Installation, A Short One On How The Three Phase Meter Is Installed…
How To Change Your Faulty Lamp holders and Replace Your Bulbs
มุมมอง 554 หลายเดือนก่อน
How To Change Your Faulty Lamp holders and Replace Your Bulbs
According to your bio, your in the United States. That's not an American socket, it's a British style socket that they don't use in the US. Also you say your an Electrician but the tools and testers your using are those of a DIY'ER not a professional electrician.
Thanks for your observation, For the Location, it was a default location I didn’t change. I’m Actually in Ghana. Also about the the Socket that’s true it’s a British socket and it’s used in some part in Africa. What I don’t agree with you is the tools you say it’s of a DIYER. Everyone has a brand he or she feels comfortable with and also the prices are not the same. Let’s be considerate in all the angles before we criticize or even comment.
If the tools doesn’t seem good to you, fine, I don’t have all those nice and cool equipment but you can’t tell me I’m not an Electrician or A Professional Electrician. Might not be experienced as you are but please let’s be polite. Let’s encourage, cheer up and motivate.
In conclusion I’d like to say thank you for your observation and corrections. I’ll do my best to improve on them. Thank you Sir, I Appreciate you.
👌😘
Very educative 😘
Thanks, Means a Lot to me
Thanks bro but you looped from one prepaid meter to another prepaid meter, what if the recharge from the first prepaid meter get expired how will the second prepaid meter get light in their house?
It was the main power that supplies the meters that I looped, Not the load from the meter. The power from the pole to the first meter is what I looped from the first meter to the second meter then the load is what supplies the customers power.
@ so if the first recharge for the prepaid meter expires the second house will get light right
Yes they will get power, this is because the the looped power from the first meter is the power fro the pole straight to the meter and distributed to the other meters. The load terminal of the meter is the part that send power thus the customer’s prepaid from the meter straight to the consumer unit of the customer so when the prepaid gets finished the meter will be on alright but the customer won’t get power
Good work❤
Thank you! 🙏🏽
Thanks, I have really enjoyed it
Glad you enjoyed it @RosesLady-n5u Priciate you 🫶🏽🙏🏽
Keep it up bro
I will Sir/Madam 🫶🏽🙏🏽