The Crossing Group
The Crossing Group
  • 20
  • 47 142
South Texas Pipeline Project Overview - The Trenchless Company
After Hurricane Harvey interrupted the operations of an important pipeline in southeast Texas, The Trenchless Company was contracted to install a replacement using the Direct Pipe® method.
Learn how The Trenchless Company used this innovative approach to trenchless installations - along with industry-leading Direct Pipe® expertise - to ensure the safe movement of key resources through the region.
To learn more about The Trenchless Company visit www.crossinggroup.com/the-trenchless-company.
มุมมอง: 547

วีดีโอ

Applying the Direct Pipe Method - The Tunneling Company
มุมมอง 20214 วันที่ผ่านมา
The Trenchless Company specializes in the Direct Pipe® method - a versatile and low-impact approach to pipeline installations. Learn more about the unique benefits of the Direct Pipe® methodology, from real-time annular pressure adjustments to its efficient fluid management systems. To learn more about The Tunneling Company’s Direct Pipe®Method visit www.thecrossingcompany.com.
How the Down The Hole (DTH) Boring System Works - The Tunneling Company
มุมมอง 1K3 หลายเดือนก่อน
The Tunneling Company’s down the hole (DTH) boring system is the world’s first purpose-built horizontal DTH drilling solution. This robust and cost effective system can tackle challenging soil conditions such as bedrock or boulders and is capable of drilling in a steel pipe with a diameter of between 8” to 48” inches. The addition of this technology further expands the geotechnical conditions t...
How the Advanced Hydraulic Hammer Works - The Tunneling Company
มุมมอง 3133 หลายเดือนก่อน
The Tunneling Company’s advanced Hydraulic Hammer allows for efficient, economical installation of large diameter steel pipe (36” to 192”diameter) where other boring or tunneling methods are not feasible: beneath crossings in wet, granular, unstable or shallow ground conditions. Our proprietary, ultra-high-energy hydraulic pipe ramming system sheers the soil to eliminate skin friction resistanc...
HDD Intake Process - The HDD Company
มุมมอง 2793 หลายเดือนก่อน
The HDD Company is changing the way we install subsea intakes for feed water desalination projects using low-impact horizontal directional drilling techniques. Employing microporous HDPE intake pipe, this four-step process has negligible impact on the marine environment and sea life. It offers substantially lower construction costs, virtually eliminates operator safety concerns, and involves a ...
Railway Crossings Made Easy - The Tunneling Company
มุมมอง 26K3 หลายเดือนก่อน
The Tunneling Company’s trenchless solutions are the perfect way to avoid interruptions when installing infrastructure that intersects with railways. These crossings can be completed with no impact on the tracks, ensuring that our work does not interfere with the operations of railway owners. In addition to being disruption-free, our services can successfully work in shallow cover and unconsoli...
Golden Ears Force Main Trenchless Project of the Year Runner Up - The Trenchless Company
มุมมอง 692ปีที่แล้ว
The Golden Ears Force Main project ensured that wastewater was safely diverted across the Fraser River while the Northwest Langley Wastewater Treatment plant underwent a significant expansion. Learn why this innovative collaboration between The Crossing Group, BlueFox Engineering, and Pomerleau was named the 2023 Trenchless Technology New Installation Project of the Year Runner Up!
The Crossing Group Overview
มุมมอง 409ปีที่แล้ว
The Crossing Group is one of the largest trenchless construction companies in North America. We specialize in providing the energy, municipal, civil and utility sectors with the integrated, full-service offering of solutions required to overcome the simplest or most complex crossing challenges. We have the people, the processes, the technology and the capacity to efficiently handle projects of ...
Murray River Pipeline Crossing Project - The HDD Company
มุมมอง 249ปีที่แล้ว
The Crossing Company and The Tunneling Company worked together to complete a challenging pipeline crossing near the Murray River. Learn how our two expert companies managed complex technical requirements to make this project a resounding success.
Horizontal Down the Hole (DTH) Drilling Demonstration - The Crossing Group
มุมมอง 1.4K2 ปีที่แล้ว
The Tunneling Company is an industry leader in Horizontal DTH (Down the Hole) drilling - allowing our partners to complete trenchless crossings previously thought to be impossible. The Horizontal DTH methodology allows for pipeline installations through hard geological conditions that preclude many other tunneling methods. Learn how this innovative technology can help you successfully complete ...
Meet The HDD Company
มุมมอง 1.1K2 ปีที่แล้ว
Serving the USA from our headquarters in Sacramento, California, The HDD Company has a proven track record for completing a wide array of horizontal directional drilling projects both as a sub-contractor and as a prime contractor. We own and operate an integrated fleet of heavy and light HDD rigs and tunneling equipment and are a trusted provider of HDD services for major utility installations ...
Meet The Tunneling Company
มุมมอง 1.3K2 ปีที่แล้ว
Headquartered in Kamloops, British Columbia, The Tunneling Company (formerly Kamloops Augering & Boring Ltd.) serves clients across North America. We have over 40 years of tunneling and boring experience in Canada and the US, representing multiple generations of construction knowledge. To learn how The Tunneling Company can meet your tunneling needs, visit www.crossinggroup.com.
Meet The Crossing Company
มุมมอง 1.4K2 ปีที่แล้ว
For over 20 years, The Crossing Company has provided advanced horizontal directional drilling (HDD) solutions to industrial, municipal construction and utility clients across western Canada and around the world. Our extensive fleet of heavy and light rigs allow us to take on projects of all size and scope - whether it involves a single rig or requires multiple units and crews to work simultaneo...
Eureka Subsea Cable Project - The HDD Company
มุมมอง 1.2K2 ปีที่แล้ว
The HDD Company helped create the infrastructure required to run fibre optic cables essential for telecommunications from Singapore to Eureka, California. These cross-continental cables run across the ocean floor, but had to be connected to the shore. Learn how The HDD Company helped ensure the success of this challenging shore approach using the directional bore method and a custom-made rig.
STARS Rescue in the Rockies - The Crossing Group Gives Back
มุมมอง 1225 ปีที่แล้ว
STARS Rescue in the Rockies - The Crossing Group Gives Back
The Crossing Group - What We Do
มุมมอง 2.1K6 ปีที่แล้ว
The Crossing Group - What We Do
The Tunneling Company - What We Do
มุมมอง 6K6 ปีที่แล้ว
The Tunneling Company - What We Do
The San Francisco Bay Project - The HDD Company
มุมมอง 3509 ปีที่แล้ว
The San Francisco Bay Project - The HDD Company
The HDD Company - What We Do
มุมมอง 1.5K9 ปีที่แล้ว
The HDD Company - What We Do

ความคิดเห็น

  • @joedavis5178
    @joedavis5178 17 วันที่ผ่านมา

    No environmental, they can contaminate any site

  • @joedavis5178
    @joedavis5178 17 วันที่ผ่านมา

    They never pay the bill, cocksuckers all of them. Hi Shawn: We have not yet received the BCMOE search invoice they are $63.00. I included an old search invoice for reference. We had already completed the scanning of the aerial photos, checked the library for the reverse directory search, drove and picked up sample equipment for the lab, drove and picked up from Hoskin’s Scientific. I was going to leave in a few hours when you replied to my email 14 days after I had emailed you. All this work can be used towards the Stage 1 and Stage 2 update work if you want to complete. Peter had said he had a buyer already lined up but with you cancelling the environmental work his buyer cancelled since there was no environmental.

  • @johnnyfreedom3437
    @johnnyfreedom3437 2 หลายเดือนก่อน

    I'm glad to see man going through so much effort to take care of our critters and keep them out of danger! The underground roadway pass make it easier for wild animals to follow their hunting territory without Danger!!

  • @olddog103
    @olddog103 2 หลายเดือนก่อน

    KOOL

  • @DaHitch
    @DaHitch 2 หลายเดือนก่อน

    I like how the one system is highly cost effective and the other system has high cost effectiveness. A solution for all possible eventualities.

    • @DiceMaster740
      @DiceMaster740 2 หลายเดือนก่อน

      "I say your 3 cent titanium tax goes too far!" "And I say *your* 3% titanium tax doesn't go too far enough!"

  • @hedgehog3180
    @hedgehog3180 3 หลายเดือนก่อน

    Good to know if I ever end up operating a railway company.

  • @denniselvy3528
    @denniselvy3528 3 หลายเดือนก่อน

    It's no good what they will do with all the orange cone 😂😂😂

  • @williamcarlson5405
    @williamcarlson5405 3 หลายเดือนก่อน

    From WC, I hope this can be used under roads also as most construction companies I have ever seen that put some sort of utility underground do a terrible job as they dig up the road to put the utility under the road and then cover it up and pave it! It is usually so rough it is worse than a “Speed Bump”, even on a 60-70 mph Road!

  • @oo0Spyder0oo
    @oo0Spyder0oo 3 หลายเดือนก่อน

    Would have been interesting to know how the pipes are cleared s they get pushed through the dirt.

  • @Astroponicist
    @Astroponicist 3 หลายเดือนก่อน

    Systems like this could be adapted to environmental conditions present on Luna especially the hydrohammer. Both systems show potential for teleoperation in permanently shaded craters at the South Pole region where water ice with mixed grade aggregate under cryogenic temperatures will be an incredibly important challenge to overcome. Luna has sub surface conditions that may vary from concrete like water ice & aggregate to unstable mixed grade aggregate.

  • @elbuggo
    @elbuggo 3 หลายเดือนก่อน

    Brilliant!

  • @HtoTheB
    @HtoTheB 3 หลายเดือนก่อน

    I don't work for a utility, nor a rail infrastructure company. I have no idea, how I ended up at this video, but I love it!

    • @jeffharper7579
      @jeffharper7579 2 หลายเดือนก่อน

      😵I think because we are starting to let computers control our lives with out knowing it😵😄😆😆

  • @CahNdeso-z4p
    @CahNdeso-z4p 3 หลายเดือนก่อน

    Hdd😊

  • @pennybergmen8933
    @pennybergmen8933 5 หลายเดือนก่อน

    I still think this is funny

  • @nickarmstrong4599
    @nickarmstrong4599 6 หลายเดือนก่อน

    This warms my heart. Thank you! <3

  • @nickarmstrong4599
    @nickarmstrong4599 6 หลายเดือนก่อน

    World Class. Noice.

  • @nickarmstrong4599
    @nickarmstrong4599 6 หลายเดือนก่อน

    This technology that The Crossing Group is using is phenomenal. Wow.

  • @walterrutherford8321
    @walterrutherford8321 8 หลายเดือนก่อน

    What is the longest tunnel (at least 1m wide) that you can bore? How far in a day? How long would it take your R&D to develop a new, but pre-existing, method to at least triple that?

  • @pennybergmen8933
    @pennybergmen8933 ปีที่แล้ว

    Hahaha haha hahahaha

  • @christinecarsoncarson2672
    @christinecarsoncarson2672 ปีที่แล้ว

    Good job 👍

  • @서성훈-e5g
    @서성훈-e5g ปีที่แล้ว

    Good

  • @Comrade13s
    @Comrade13s ปีที่แล้ว

    Tcc forward!

  • @dianaworthen9582
    @dianaworthen9582 2 ปีที่แล้ว

    Nice overview guys. But something seems off at 0:13...!

    • @dirtdr74
      @dirtdr74 2 ปีที่แล้ว

      Exit side rig in freewheel (rig on other side of the crossing is turning clockwise)

  • @crossinggroup
    @crossinggroup 2 ปีที่แล้ว

    Pardon the audio issues. We are working out the bugs for live stream.

  • @rdizzleoriginal
    @rdizzleoriginal 2 ปีที่แล้ว

    Great presentation

  • @MS-if7sp
    @MS-if7sp 5 ปีที่แล้ว

    Fuck this company!!!!!