Carrying out Sheet pile wall construction
This video is about sheet pile wall construction from start to finish. It shows how to build a sheet pile retaining wall used for a platform so that a house can be built . It is also suitable for basements excavations, underground structures.
มุมมอง: 4 782

วีดีโอ

Concrete Retaining Wall Design and Construction
มุมมอง 1.3Kปีที่แล้ว
This video shows concrete retaining wall design and construction from start to finish. It includes all the construction steps in an animation from excavation, reinforcement fixing , formwork , concrete pour to the wall, waterproofing and earthworks. It also includes an overview of the design process.
Pile construction and design
มุมมอง 2.1K2 ปีที่แล้ว
This video shows pile construction and design in an animation. It also shows the design concept and construction of a pile cap together with holding down bolts. All reinforcement fixing is shown together with formwork fixing and concrete pours.It is useful if you are planning a deep foundation. Music by Epidemic Sound (www.epidemicsound.com/)
Steel Column Base Construction
มุมมอง 7422 ปีที่แล้ว
This video shows a steel column base construction. The steel column is fixed to the concrete foundation pile cap using holding down bolts. It also shows the base plate with stiffeners sitting on a grout. Would be useful if you are designing a heavily loaded steel column with a moment connection. Music by Epidemic Sound (www.epidemicsound.com/)
Underground water tank construction step by step Part 3 : Walls
มุมมอง 25K3 ปีที่แล้ว
This shows underground water tank construction step by step. It is part 3 of a series of short videos showing the complete construction of a reinforced concrete underground water tank. Music by Epidemic Sound (www.epidemicsound.com/)
Foundation slab construction start to finish : Part 2 of 3
มุมมอง 4.7K3 ปีที่แล้ว
This video shows the construction of a foundation slab from start to finish. The slab is in reinforced concrete. This is part 2 of a 3 part series of short videos showing the complete construction of a water retaining structure.
Foundation construction step by step: Part 1 of 3, Deep Excavation
มุมมอง 35K3 ปีที่แล้ว
This video shows how to do a deep excavation to enable the construction of a foundation for a water retaining structure. It shows the excavation sequence step by step using an animation. It is Part One of a three-part series of videos showing the complete construction of a reinforced concrete retaining structure. The video covers sheet piles, shoring and dewatering. It also gives a design overv...

ความคิดเห็น

  • @ForestSimsim
    @ForestSimsim วันที่ผ่านมา

    part 1?

  • @islamboukhatem6635
    @islamboukhatem6635 5 หลายเดือนก่อน

    Thanks sir but how we can fixed temporary support with wall

  •  7 หลายเดือนก่อน

    bạn sử dụng plugin gì thế?

  • @vincevon325
    @vincevon325 ปีที่แล้ว

    Awesome video. Well done!👍

  • @IshVelez11
    @IshVelez11 ปีที่แล้ว

    The video is good but the sequence of execution is questionable. The existing drainage pipe remains in place until the end which means the sheet piling according and has pass through the pipe line. Prior to any excavation existing utilities are identified and marked, plus if all material is removed around the pipeline what's not cause the drainage pipe to fail and fall?

    • @civilengn
      @civilengn ปีที่แล้ว

      Good observation. However, this video only presents an overview of the whole sequence. Detailed site specific tweaks will of cos be necessary.

  • @markmoreno317
    @markmoreno317 2 ปีที่แล้ว

    What programme did you used for this animation?

  • @qingshengchen3927
    @qingshengchen3927 2 ปีที่แล้ว

    Great job! Looking forward to seeing your new videos !

  • @gerhardrheeder6573
    @gerhardrheeder6573 2 ปีที่แล้ว

    Very neat. Thanks. Please advise on the software used for the animation.

  • @linjames1217
    @linjames1217 2 ปีที่แล้ว

    Great video

  • @kalakbaytv149
    @kalakbaytv149 2 ปีที่แล้ว

    Wow good work. New friends hear sending full support❤️

  • @gabriellaszecsi78
    @gabriellaszecsi78 2 ปีที่แล้ว

    Can piling sheet be installed into chalky soil types? or next to an existing building?

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Yes you can do sheetpiles in chalky soil types. If near accupied building do assessment first of noise and ground vibration to prevent structural damage to nearby structures. You might need to use bored piles if site is sensitive to noise and vibration.

  • @mamadeebuildsahouse
    @mamadeebuildsahouse 2 ปีที่แล้ว

    where are you located? I have a home in Eastern Cape, South Africa and I want this.

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      thank you. am in london. Use contact email on the channel page.

    • @mamadeebuildsahouse
      @mamadeebuildsahouse 2 ปีที่แล้ว

      @@civilengn in London, UK?

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      @@mamadeebuildsahouse yep!

  • @Cartoonschannel24
    @Cartoonschannel24 2 ปีที่แล้ว

    Very nice

  • @user-km5fb3mk4b
    @user-km5fb3mk4b 2 ปีที่แล้ว

    👍👍👍👏👏👏🌺

  • @dom8056
    @dom8056 2 ปีที่แล้ว

    missing part 2?

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Thanks for watching Here is link th-cam.com/video/_VxwHwAWF2w/w-d-xo.html

  • @159256547
    @159256547 2 ปีที่แล้ว

    but when you remove the prop what is happening with the sheet pile wall stability ? which element replace props faction?

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Thank you for watching. You only remove the prop once it becomes redundant...ie its no longer required for the stability of the sheet pile wall. i.e either you have partially backfilled the excavation such that the pile embedment passive pressure balances the active pressure. Otherwise the prop stays in position and you work around it until the excavation is stable without props. Key thing is to have a peer reviewed construction sequence and verify actions/resistances at every stage of excavation.

  • @L145channel.
    @L145channel. 2 ปีที่แล้ว

    Mantap bos tetap semangat dalam berkarya 👍🏾👍🏾👍🏾

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Thank you!

  • @L145channel.
    @L145channel. 2 ปีที่แล้ว

    Mantap benar ni bos sangat menarik 👍🏾👍🏾❤️👍🏾

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Thank you for watching !

  • @vincevon325
    @vincevon325 2 ปีที่แล้ว

    Wow. amazing video. Shows the construction process clearly. You should also do one on RCC beam & slab.

    • @civilengn
      @civilengn 2 ปีที่แล้ว

      Thank you ! will do.

  • @elwinvanwees8516
    @elwinvanwees8516 3 ปีที่แล้ว

    oh music! Cheers this was a great video. To what dept can the sheet piles be used?

    • @civilengn
      @civilengn 3 ปีที่แล้ว

      Elwin, thanks for watching. the retained depth on this job was about 4m, with shoring. In general max depth retained will depend on the geotech condition, groundwater level, structural capacity of sheet pile unit, shoring availability, refusal depths etc..

  • @Hussam07
    @Hussam07 3 ปีที่แล้ว

    Thanks,

  • @abdelmageedrashed3549
    @abdelmageedrashed3549 3 ปีที่แล้ว

    what is the name of used program please?

    • @civilengn
      @civilengn 3 ปีที่แล้ว

      Thanks for watching. Will do workflow video to show how

  • @henryjohn112233
    @henryjohn112233 3 ปีที่แล้ว

    What programme did you use for the animation, it looks cool.

    • @civilengn
      @civilengn 3 ปีที่แล้ว

      Thanks . Will do a workflow video to show how.

  • @ShopperPlug
    @ShopperPlug 3 ปีที่แล้ว

    how is it even possible to put those metal bars deep down to the ground of that shape? 4:57 - that white large pipe is used to hold down the side trenches?

    • @civilengn
      @civilengn 3 ปีที่แล้ว

      The profiled metal sheets are sheet piles. They are driven into the ground by a rig. The large white pipe is an existing drainage pipe that gets cut off and diverted so the structure to be constructed.

  • @vincevon325
    @vincevon325 3 ปีที่แล้ว

    Wow...that's a great video. Good overview.