Pile foundations in Transmission line
มุมมอง 6K4 ปีที่แล้ว
Pile foundations 1st stage execution process at site.. Equipment used:Cranes,Rig Mechine,vibro hammer,welding & gas cutter Mechine,concrete pump
chandika vishnuvardhan Live Stream
9 ปีที่แล้ว
Kholne Ka to malum hogya lekin lagega kaise daba ke lagane par bhi Nahin lag RHA h
Bro what about the valve on the top, how to keep it that one, open or closed while using.
Sukriya, aapka mehanath keliye bohat bohat danyavad, very usefull... Congratulations
No spacer for steel cage?
Fix and show
❤️❤️❤️❤️❤️
Thank you
Thanks bhai
Bhai , very usefull
Thank you
Very usefull👍
1 ganta zaya hua mera apki wjah sy 2 seconds mn khul gya thank you for advice
Bohat alla Main Kal say parayshani main tha issay kholnay k liay Shukriya
Very Useful
Thank you
Good
Can you show how the stub of tower is attached to the pile? It is not shown in the video Thanks in advance👍
Here it is first stage of concrete only. Will install stub in second stage.
How deep one pile can go maximum?
maximum casing length is 12m. If reaches 12m we need to weld with new one depends on design depth. We can add any length.